Upload
lecong
View
217
Download
3
Embed Size (px)
Citation preview
SIGN
SIGN
MH
DI
DI
ASPH
ASPHASPH
ASPH
SIGN
CONC
ASPH
ASPH
SIGN
DI
SIGN
SIGN
C.B.
MH
C.B.
RIP-RAP
C.B.
C.B.C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
CONC DITCH
CO
LLE
GE
AV
EN
UE S
OU
TH
NB
L
DAM
C.B.
J.W.
J.W.
--
--
--
--
--
--
--
--
--
ERW & DA
ER
W
&
DA
ERW & DA
ERW & DA
ER
W
&
DA
ERW &
DA
ERW &
DA
ERW & DA
ERW & DA
O/
H
SIG
N
C.B.
DI
DI
SIGN
SIGN
C.B.
C.B.
C.B.
J.W.
J.W.
C.B.
N
PC
Sta 5
+00.0
0
5 67
89
PT
Sta 9
+31.7
6
5 +50 6 +50 7 +50 8 +50 9
65
75
ELEV. 72.30
-0.44% -0.26%
72.5
2
ELEV. 71.88
-0.26% -0.51%
70.9
2
P.V.I. STA. 7+10.00
P.V.I. STA. 5+50.00
95
I NTERSTATE
ISSUES:
COMMENTS:
9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes
Delaware Department of Transportation
JULY 28, 2003& KAHL
RUMMEL, KLEPPER
PLAN SCALE
0 25 10050
- Corrects vertical "dip" at approach to Christina Creek Bridge
lanes and ramp
- New barrier installed to provide better separation between through
- Existing inlets (2) need to be adjusted
ISSUE 1 - Vertical "Dip" I-95 N.B. On-Ramp
Option 1 - Adjust Vertical Profile
TO WILMIN
GTON
TO TOLL PLAZA
EXIST. R
/W
PLAN LEGEND
APPROXIMATE EXISTING RIGHT OF WAY
PROPOSED ROADWAY PAVEMENT
EXISTING ROADWAY PAVEMENT
REMOVE EXISITING PAVEMENT
PROPOSED OVERLAY
RAMP PROFILE
EXISTING GRADE
PROPOSED GRADE
BARRIER
CONSTRUCT
LIMIT OF RECONSTRUCTION
I-95 / SR 896 Interchange Improvements
Christina Creek Bridge
1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at
2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility
3. SB SR 896 - Weave between I-95 Ramps
4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896
5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95
10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance
SECTION A-A
EXISTING SLOPE
SHLD.
6’
3% 3%
VARIES (3%-6%)
SHOULDER SLOPE
(N.T.S.)
STA. 6+75
Iss1opt1.dgn
A
A
H: 1"=50’, V: 1"=5’
PROFILE SCALE: OFFSET BARRIER
CROSS SLOPE AND
IN RAMP/SHOULDER
IN GRADE MADE UP
NOTE: DIFFERENCE
SHLD. & LANES
EXISTING I-95
CONSTRUCT PCC BARRIER
CONCRETE ISLAND &
REMOVE EXISTING
(No longer under consideration)
7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting
WIDTH
LANE
EXIST.
MATCH
WIDTH
SHLDR.
EXIST.
MATCH
(No longer under consideration)
6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements
8. SB I-95 - Rutting at the Welsh Tract Road Bridge
CHRISTINA CREEK
I-95 SB
I-95 NB
C.B.
C.B.
SIGN
SIGN
DIDIDIDI
MH
SIGN
SIGN
C.B.
C.B.
C.B.
C.B.
C.B.
MH
C.B.
DI
SIGN
CONC
C.B.
DI
DI
DI
DI
SIGN
SIGN
DI
DI
DIDI
DI
DI
C.B.
DI
DIDI
C.B.
DI
DI
SIGN ASPH
POOLDECK
CONC DITCH
CO
NC
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
CO
NC
CONC
ASPH
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL
ASPH
CO
NC
CONC
CONC DITCH
CONC DITCH
DENSE TREES
C.B.
C.B.
C.B.
C.B.
C.B.
CHRIS
TIN
A RIV
ER
DENSE TREES
FO
FO
FO
C.B.
J.W.
S
C.B.
J.W.
EV
EV
EV
EV
S
--
--
--
--
ERW & DA
ER
W
&
DA
ERW
& DA
ERW & DA
PLAN LEGEND
APPROXIMATE EXISTING RIGHT OF WAY
PROPOSED ROADWAY PAVEMENT
EXISTING ROADWAY PAVEMENT
828384858687
PC
Sta 87
+4
2.1
1
88
89
90
PC
C
Sta 90+39.11
91
PCC Sta 9
1+40.18
92
93
PT Sta 93+59.18
94
PC Sta 94+92.5
6
95
96
PC
C
Sta 96+72.9
6
97
PCC Sta 97+87.8
4
98
99
PT St
a 99
+63.
84
100
101
102
103
104
CROSS SLOPE
MATCH EXISTING
REMOVE EXISITING PAVEMENT
CROSS SLOPE
MATCH EXISTING
6.2
%
EX.
EX.
5.6
%
EX.5.
1%
5.4%
EX.
EX.
5.5
%
5.1
%E
X.
5.1
%
EX.
2.8%
EX.
N
PROPOSED OVERLAY
SUPERELEVATION
BEGIN 5%
15’ LA
NE
12’ SHOULDER
DS=35 mph
SE=5.4%
R=600’
CURVE 1
DS=25 mph
SE=5.8%
R=240’
CURVE 2
DS=20 mph
SE=5.8%
R=150’
CURVE 3
DS=25 mph
SE=5.8%
R=300’
CURVE 5
DS=35 mph
SE=5.0%
R=700’
CURVE 6
896
TO TOLL PLAZA
TO WILMINGTON
Exist. R/W
95
I NTERSTATE
ISSUES:
COMMENTS:
9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes
Delaware Department of Transportation
JULY 28, 2003& KAHL
RUMMEL, KLEPPER
PLAN SCALE
0 25 10050
ISSUE 2 - SB I-95 Ramp Flat Grade
Christina Creek Bridge
1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at
2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility
3. SB SR 896 - Weave between I-95 Ramps
4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896
5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95
10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance
I-95 / SR 896 Interchange Improvements
5.8
%
SUPERELEVATION
END 5.8%
5.8
%
EX.
5.4
%
DS=20 mph
SE=5.8%
R=150’
CURVE 4
CROSS SLOPE
MATCH EXISTING
- Removes existing flat grade at location of previous ramp toll facility
- Provides improved roadway delineation with removal of excess pavement width
- Superelevation of 5.8% maintained between Curve 2 and Curve 5
- Existing ramp geometry not improved outside of reconstructed area
design speed
- Increase superelevation of Curves 2,3,4 and 5 to achieve minimum 20 mph
(No longer under consideration)
7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting
Iss2opt1.dgn
SUPERELEVATION
BEGIN 5.8%
- Reconstructs existing pavement for 800 ft. (150 ft. new and 650 ft. mill and overlay)
Option 1 - Improve S/E with Existing Geometry
(No longer under consideration)
6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements
8. SB I-95 - Rutting at the Welsh Tract Road Bridge
I-95 SB
I-95 NB
SR 896 N
B
SR 896 SB
CHRISTINA CREEK
RAMP
RAMPA/C
CONC
MH
SIGN
RAMP
CONC
CSW
RAMP
MH
POOLCONC
SIGN
SIG
N
F.H.
SIGN
MH
GUY
DECK
DECK
SIGN
C
SIGN
CONC
CONC
F.H.
SIGN
SIGN
CS
W
CS
W
C.B.
C.B.
C.B.
RIP-RAP
RIP-RAP
CO
NC
ASPH PARKING
C.B.
CONCASPH
ASPH
CONC
CONC
CONC
CONCASPH
ASPH
ASPH
SIGNSIGN
RIP-RAP
CONC
ASPH
O/H
SIGN
MH
CONC
ASPH
SIGN
SIGN
CONCASPH
ASPHCONC
ASPH
BRUSH
SIGN
SIGN
MH
CONC
ASPH
ASPH
CO
LL
EG
E
AV
EN
UE
SO
UT
H
DE - 896
C.B.
C.B.
C.B.
C.B.
I -
95
RAMP
CONCI - 95 RAMP
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
I - 95
RA
MP
CO
LL
EG
E
AV
EN
UE S
OU
TH
DE - 896
C.B.
SIGN
SIGN
SIGN
DIDIDIDI
MH
SIGN
SIGN
C.B.
C.B.
C.B.
C.B.
C.B.
MH
MH
C.B.
DI
SIGN
CONC
CONC
CONCCONC ASPH
ASPH
ASPH
ASPH
C.B.
SIGN
DI
DI
DI
DI
SIGN
SIGN
DI
DI
DIDI
DI
DI
C.B.
SIGN
DI
DIDI
C.B.
DI
DI
MH
MH
DI
DI
SIGN
SIGN
CONC
CONC
ASPH
ASPHASPH
ASPH
SIGN
CONC
ASPH
ASPH
SIGN
DI
SIGN
SIGN
POOLDECK
C.B.
C.B.
MH
CONC
ASPH
C.B.
RIP-RAP
C.B.
C.B.C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
CONC DITCH
CO
NC
CO
LLE
GE
AV
EN
UE S
OU
TH
NB
L
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
CO
NC
CONC
CO
NC
WALL
ASPH
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL
ASPH
CO
NC
CONC
CONC DITCH
CONC DITCH
DENSE TREES
DAM
CANOPY
TR
TR
TR
TR
TR
POOL
CANOPY
CA
NO
PY
CANOPY
CANOPY
TRANS
CONC
RIP-RAP
RIP-RAP
c
c
CONC
CONC
ASPH PARKING
UNPAVED PARKING
ASPH PARKING
ASPH PARKING
ASPH PARKING
CONC ASPH PARKING
ASPH PARKING
C.B.
CHRIS
TIN
A RIV
ER
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
CHRIS
TIN
A RIV
ER
DENSE TREES
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
DE - 986
ASPH PARKING
C.B.
C.B.
ASPH PARKING
ASPH PARKING
C.B.
CO
NC
C.B.
FO
FO
FO
C.B.
C.B.
J.W.
J.W.
J.W.
J.W.
J.W.
J.W.
J.W.
GMKR
MH
MH
MH
S
D
VENT
C.B.
J.W.
EV
EV
EV
EV
EV
G
S
PL
PL
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
ERW & DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW
& DA
ERW & DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
ERW &
DA
ERW &DA
ERW &DA
ERW &DA
ER
W
&D
A
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ERW &
DA
ERW &
DA
ERW & DA
ER
W
&
DA
ER
W
&
DA
ERW
& DA
ERW
& DA
ER
W
&
DA
ERW
& DA
ERW
& DA
ER
W
&
DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
--
--
--
ER
W
&
DA
PL
PL
PL
PL
C.B.
C.B.
O/
H
SIG
N
C.B.
MH
CONC
DI
DI
SIGN
SIGN
SIGN
BILLBOARD
AC
AC
AC
AC
AC
AC
CONC
C
C
C
C
CC
CONC
ASPH
RAMP
TANK
DECK
TANK
TANK
TANK
TANK
TANK
CONC
CONCCONC
TANK
TANK
TANKTANK
TANK
CONC
C.B.
GATE
CONC
C.B.
TANK
TR
TR
SIGN
C.B.
SIGN
MH
GATE
TANK
TRANS
CONC
MH
DI
DI
DI
DI
RAMP
92041
72.81
92061
106.88
92062
72.89
93041
63.26
93061
63.00
93062
64.10
93063
63.65
93064
91.14
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
BIL
LB
OA
RD
GATE
GATE
MH
MH
SIGN
SIGN
MH
MH
MH
MH
LAMPLAMP
LAMP
SIGNSIGN
GATE
GATE
C.B.
SIGN
SIGN
C.B.
TANK
MH
SIGN
SIGN
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
BIL
LB
OA
RD
GATE
TR
GATE
C.B.
C.B.
RIP-RAP
RIP-RAP
GATE
MH
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
SIGN
SIGN
BIL
LB
OA
RD
TR
GA
TE
GATE
F.H.
CONC
CONC
ASPH PARKING LOT
SIGN
CONC
MH
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
JOHN F.
KENNEDY MEMORIAL
HIGHWAY
JOHN F.
KENNEDY MEMORIAL
HIGHWAY
CONC
CH
AP
EL
ST
RE
ET
BROOKHILL DRIVE
DIRT PARKING
DIRT PARKING
TRAILER
ASPH PARKING
ASPH PARKING
CONC
ASPH PARKING
ASPH PARKING
CONC
RA
MP
TRAILER
TRAILER
DIRT PARKING
C
ASPH PARKING
DIRT P
ARKING
ASPH PARKING
CONC
CONC
ASPH PARKING
CS
W
ASPH
ASPH
CS
W
CS
W
TRANS GRAVEL
ASPH PARKING
ASPH
CONC
ASPH PARKING
ASPH
ASPH PARKING
GRAVEL
OPEN STORAGE
OPEN STORAGE
ASPH
ASPH
ASPH PARKINGCONC
ASPH
CONC
RAMP
A/
C
A/
C
A/
C
CO
NC
DIRT PARKING
FO
J.W.
J.W.
C.B.
40
45
PC
Sta 49+69.6
3
50
PRC St
a 4+0
1.81
5
PT St
a 7+4
4.8
4
POT
Sta
8+71.59
PO
T
Sta 10
+00.0
0
10
15
20
PC
Sta 24
+4
7.7
9
25
30
35
PC
C
Sta 35
+00.0
0
40
PT Sta 40+63.5
0PC Sta 44+84.6
0
45
N
PLAN LEGEND
896
DS=30 mph
SE=6.0%
R=290’
EXIST. R/W
DS=30 mph
SE=6.0%
R=275’
TO TOLL PLAZA
DS=50 mph
SE=6.0%
R=835’
EXIST. R
/W
EXIST. R/W
TAPER LENGTH300’
TWO-LANE E
XIT2500’
EXIST. R/W
TO WILMIN
GTON
95
I NTERSTATE
PR
C
Sta 1+00.0
0
TAPER
150’
DS=70 mph
SE=3.8%
R=4932’
TAPER300
’
JULY 28, 2003& KAHL
RUMMEL, KLEPPER
ISSUES:
COMMENTS:
Option 1 - Eliminate SB I-95 to SB 896 Loop Ramp
DECELERATION LENGTH600’
DECELERATION L
ENGTH130
0’
R=610’(EXIST.)
SE=6.0%
DS=45 mph
AD
B B
F
F
CC
I-95 / SR 896 Interchange Improvements
- Eliminates SB SR 896 weave between I-95 ramps
at previous toll facility (Issue 2)
- Eliminates SB I-95 ramp to SB SR 896 and eliminates flat grade
ISSUE 3 - SB SR 896 Weave
Diamond Interchange
clear before stacking onto deceleration lane
Spillback detectors could be added to ramp to allow vehicles to
- Provides over 800 feet of three lane storage capacity off of I-95.
this would increase the project limits
- A barrier could be added to separate ramp queue from I-95. However,
- Improves the geometry of the SB I-95 to NB SR 896 off-ramp
9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes
Christina Creek Bridge
1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at
2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility
3. SB SR 896 - Weave between I-95 Ramps
4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896
5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95
8. SB I-95 - Rutting at the Welsh Tract Road Bridge
10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance
(No longer under consideration)
6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements
(No longer under consideration)
7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting
intersection on SR 896 that operates at LOS E
- Improves SB I-95 mainline operations, but creates a new signalized
- New signal will provide gaps for NB I-95 to NB SR 896 ramp
- New signal provides a phase for NB SR 896 to SB I-95 movement
2015 PM PEAK
NO BUILD PROPOSED
MAINLINE
INTERSECTION
2015 PM PEAK
NO BUILD PROPOSED
N/A
2015 PM PEAK
NO BUILD PROPOSED
WEAVE
N/A
2015 PM PEAK
NO BUILD PROPOSED
DIVERGE
N/A
2015 PM PEAK
NO BUILD PROPOSED
DIVERGE
2015 PM PEAK
NO BUILD PROPOSED
MAINLINE
E
APPROXIMATE EXISTING RIGHT OF WAY
PROPOSED ROADWAY PAVEMENT
EXISTING ROADWAY PAVEMENT
REMOVE EXISITING PAVEMENT
PROPOSED OVERLAY
RR TR
AC
K
REMOVED
TO BE
BRIDGE
EXIST.
CH
APEL STR
EETNEW SIGNAL
BRIDGE
EXISTING
WIDEN SIGN
OVERHEAD
REPLACE
INDUSTRIAL PARK
DIAMOND STREET
BRIDGE
EXISTING
WIDEN
Delaware Department of Transportation
PLAN SCALE
0 50 100 200
Iss3opt1.dgn
BRIDGE
EXISTING
WIDEN
BRIDGE
EXISTING
WIDEN
PIKE
BALTIMORE
TO OLD
3RD LANE
CONSTRUCT
SR 896 N
B
SR 896 SB
I-95 SB
I-95 NB
CHRISTINA CREEK
PARK
IRON HILL
CONCASPH CONC
CONC
CONCASPH
ASPH
ASPH
SIGNSIGN
MH
CONC
ASPH
SIGN
SIGN
ASPH
BRUSH
MH
CONC
ASPH
ASPH
I -
95
RAMP
CONCI - 95 RAMP
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
I - 95
RA
MP
CO
LL
EG
E
AV
EN
UE S
OU
TH
DE - 896
SIGN
SIGN
SIGN
DIDI
MH
C.B.
DI
SIGN
CONC
CONC
CONCCONC ASPH
ASPH
ASPH
ASPH
C.B.
DI
DI DI
DI
DIDI
C.B.
DI
DI
MH
MH
DI
DI
SIGN
SIGN
CONC
CONC
ASPH
ASPHASPH
ASPH
SIGN
CONC
ASPH
ASPH
SIGN
DI
SIGN
CONC DITCH
CO
NC
CO
LLE
GE
AV
EN
UE S
OU
TH
NB
L
CONC
CO
NC
WALL
ASPH
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL
ASPH
CO
NC
C.B.
J.W.
J.W.
GMKR
MH
VENT
EV
G
--
--
--
--
ER
W
&
DA
ERW &
DA
ERW
& DA
ERW
& DA
ER
W
&
DA
ERW
& DA
N
PLAN LEGEND
APPROXIMATE EXISTING RIGHT OF WAY
PROPOSED ROADWAY PAVEMENT
EXISTING ROADWAY PAVEMENT
REMOVE EXISITING PAVEMENT
STOP
AHEAD
STOP
STOP
LEFT TURN
R=50’
R=500’
R=500’
1’ offset)
offset +
(12’ Lane + 1’
Total Width 14’
2’
8’
R=150’
R=150’
R=50’
PROPOSED OVERLAY
2’ MEDIAN CURB
2’ MEDIAN CURB
15’ L
ANE
10’ S
HOULDER
4’ SHOULDER
896
Iron Hill Park
TO WILMINGTON
95
I NTERSTATE
ISSUES:
COMMENTS:
Delaware Department of Transportation
JULY 28, 2003& KAHL
RUMMEL, KLEPPER
PLAN SCALE
0 25 10050
ISSUE 4 - Left Turn Onto NB SR 896
I-95 / SR 896 Interchange Improvements
Christina Creek Bridge
1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at
2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility
3. SB SR 896 - Weave between I-95 Ramps
4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896
5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95
of two stage condition
- Delineators could be added to channelizing island to enhance visibility
- Improved signing along ramp to better identify left turn condition
- Provides better lane width definition along approach leg of ramp
Signal Warrant
- Signal Warrant Analysis was performed in August 2002
not be a substantial reason to justify signal installation
Since the intersection does not meet any of the other warrants, Warrant 6 may
- Signal Warrant 6 - Coordinated Signal System was the only warrant met.
the intersection
to the intersection and of angle collisions involving left turns from
- Recent accident history of rear-end collisions on the weaving segment prior
Eliminate Ramp
movement:
- FHWA recommended the following process to remove the NB I-95 to NB SR 896 Ramp
- Full report should be prepared and submitted to Delaware FHWA Office
9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes
8. SB I-95 - Rutting at the Welsh Tract Road Bridge
10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance
(No longer under consideration)
6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements
(No longer under consideration)
7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting
Option 1 - Provide Left Turn Channelization
allowing for a two-stage gap acceptance
- Improves left turn channelization and separation from NB SR 896
be inadequate when there is traffic in the auxiliary lane (NB I-95 loop ramp)
north (oncoming SB SR 896 through traffic) is not improved and may
- Sight distance for vehicles stopped at the end of the ramp looking
AM; 15 vehicles PM)
- Relatively low volume of vehicles turning left from the ramp (9 vehicles
operates at LOS E during the AM peak and LOS F during the PM peak
- Capacity Analysis indicated that the left turn from the unsignalized intersection
- There was one reported fatality involving an accident with a left turning vehicle
redesign of the interchange
- Recommendations included geometric improvements at the intersection and/or a
Tuckers Association
- Issue should be presented to local MPO, the public and possibly the National
- Delaware FHWA would take issue to FHWA Headquarters and possibly AASHTO
safety issues
- Concern of the national implications created by closing a ramp due to
Iss4opt1.dgn
finding an alternate solution for the ramp
- FHWA has suggested gaining approval may be difficult. Therefore we recommend
(0
MP
H to 35
MP
H)
260’
the existing bridge
- Can extend median acceleration lane to provide additional length without widening
I-95 NB
SR 896 SB
SR 896 N
B
Exist. R/W
RAMP
RAMPA/C
CONC
MH
SIGN
RAMP
CONC
CSW
RAMP
MH
POOLCONC
SIGN
SIG
N
F.H.
SIGN
MH
GUY
DECK
DECK
SIGN
C
SIGN
CONC
CONC
F.H.
SIGN
SIGN
CS
W
CS
W
C.B.
C.B.
C.B.
RIP-RAP
RIP-RAP
CO
NC
ASPH PARKING
C.B.
CONCASPH
ASPH
CONC
CONC
CONC
CONCASPH
ASPH
ASPH
SIGNSIGN
RIP-RAP
CONC
ASPH
O/H
SIGN
MH
CONC
ASPH
SIGN
SIGN
CONCASPH
ASPHCONC
ASPH
BRUSH
SIGN
SIGN
MH
CONC
ASPH
ASPH
CO
LL
EG
E
AV
EN
UE
SO
UT
H
DE - 896
C.B.
C.B.
C.B.
C.B.
I -
95
RAMP
CONCI - 95 RAMP
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
I - 95
RA
MP
CO
LL
EG
E
AV
EN
UE S
OU
TH
DE - 896
C.B.
SIGN
SIGN
SIGN
DIDIDIDI
MH
SIGN
SIGN
C.B.
C.B.
C.B.
C.B.
C.B.
MH
MH
C.B.
DI
SIGN
CONC
CONC
CONCCONC ASPH
ASPH
ASPH
ASPH
C.B.
SIGN
DI
DI
DI
DI
SIGN
SIGN
DI
DI
DIDI
DI
DI
C.B.
SIGN
DI
DIDI
C.B.
DI
DI
MH
MH
DI
DI
SIGN
SIGN
CONC
CONC
ASPH
ASPHASPH
ASPH
SIGN
CONC
ASPH
ASPH
SIGN
DI
SIGN
SIGN
POOLDECK
C.B.
C.B.
MH
CONC
ASPH
C.B.
RIP-RAP
C.B.
C.B.C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
CONC DITCH
CO
NC
CO
LLE
GE
AV
EN
UE S
OU
TH
NB
L
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
CO
NC
CONC
CO
NC
WALL
ASPH
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL
ASPH
CO
NC
CONC
CONC DITCH
CONC DITCH
DENSE TREES
DAM
CANOPY
TR
TR
TR
TR
TR
POOL
CANOPY
CA
NO
PY
CANOPY
CANOPY
TRANS
CONC
RIP-RAP
RIP-RAP
c
c
CONC
CONC
ASPH PARKING
UNPAVED PARKING
ASPH PARKING
ASPH PARKING
ASPH PARKING
CONC ASPH PARKING
ASPH PARKING
C.B.
CHRIS
TIN
A RIV
ER
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
CHRIS
TIN
A RIV
ER
DENSE TREES
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
DE - 986
ASPH PARKING
C.B.
C.B.
ASPH PARKING
ASPH PARKING
C.B.
CO
NC
C.B.
FO
FO
FO
C.B.
C.B.
J.W.
J.W.
J.W.
J.W.
J.W.
J.W.
J.W.
GMKR
MH
MH
MH
S
D
VENT
C.B.
J.W.
EV
EV
EV
EV
EV
G
S
N
PL
PL
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
ERW & DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW
& DA
ERW & DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
ERW &
DA
ERW &DA
ERW &DA
ERW &DA
ER
W
&D
A
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ERW &
DA
ERW &
DA
ERW & DA
ER
W
&
DA
ER
W
&
DA
ERW
& DA
ERW
& DA
ER
W
&
DA
ERW
& DA
ERW
& DA
ER
W
&
DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
--
--
--
ER
W
&
DA
PL
PL
PL
PL
C.B.
C.B.
O/
H
SIG
N
C.B.
MH
CONC
DI
DI
SIGN
SIGN
SIGN
BILLBOARD
AC
AC
AC
AC
AC
AC
CONC
C
C
C
C
CC
CONC
ASPH
RAMP
TANK
DECK
TANK
TANK
TANK
TANK
TANK
CONC
CONCCONC
TANK
TANK
TANKTANK
TANK
CONC
C.B.
GATE
CONC
C.B.
TANK
TR
TR
SIGN
C.B.
SIGN
MH
GATE
TANK
TRANS
CONC
MH
DI
DI
DI
DI
RAMP
92041
72.81
92061
106.88
92062
72.89
93041
63.26
93061
63.00
93062
64.10
93063
63.65
93064
91.14
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
BIL
LB
OA
RD
GATE
GATE
MH
MH
SIGN
SIGN
MH
MH
MH
MH
LAMPLAMP
LAMP
SIGNSIGN
GATE
GATE
C.B.
SIGN
SIGN
C.B.
TANK
MH
SIGN
SIGN
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
BIL
LB
OA
RD
GATE
TR
GATE
C.B.
C.B.
RIP-RAP
RIP-RAP
GATE
MH
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
SIGN
SIGN
BIL
LB
OA
RD
TR
GA
TE
GATE
F.H.
CONC
CONC
ASPH PARKING LOT
SIGN
CONC
MH
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
JOHN F.
KENNEDY MEMORIAL
HIGHWAY
JOHN F.
KENNEDY MEMORIAL
HIGHWAY
CONC
CH
AP
EL
ST
RE
ET
BROOKHILL DRIVE
DIRT PARKING
DIRT PARKING
TRAILER
ASPH PARKING
ASPH PARKING
CONC
ASPH PARKING
ASPH PARKING
CONC
RA
MP
TRAILER
TRAILER
DIRT PARKING
C
ASPH PARKING
DIRT P
ARKING
ASPH PARKING
CONC
CONC
ASPH PARKING
CS
W
ASPH
ASPH
CS
W
CS
W
TRANS GRAVEL
ASPH PARKING
ASPH
CONC
ASPH PARKING
ASPH
ASPH PARKING
GRAVEL
OPEN STORAGE
OPEN STORAGE
ASPH
ASPH
ASPH PARKINGCONC
ASPH
CONC
RAMP
A/
C
A/
C
A/
C
CO
NC
DIRT PARKING
FO
J.W.
J.W.
C.B.
Delaware Department of Transportation
JULY 28, 2003& KAHL
RUMMEL, KLEPPER
PLAN SCALE
0 50 100 200
N
15’ L
AN
E
15’ LANE
PLAN LEGEND
APPROXIMATE EXISTING RIGHT OF WAY
PROPOSED ROADWAY PAVEMENT
EXISTING ROADWAY PAVEMENT
REMOVE EXISITING PAVEMENT
PROPOSED OVERLAY
TAPER600
’
896
ISSUES:
COMMENTS:
9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes
95
I NTERSTATE
AT ABUTMENT
MAY BE REQUIRED
RETAINING WALL
TO TOLL PLAZA
DS=30 mph
SE=6.0%
R=275’
EXIST. R/W
DS=30 mph
SE=6.0%
R=300’
24’ - 2 LANES
R=14000’
SE=NC
DS=EXIS
T. R/W
EXIST. R
/W
BRIDGE
EXISTING
WIDEN
TO WILMIN
GTON
SINGLE L
ANE1000’
TWO LANE DROP250
0’
TAPER LENGTH300’
TWO LANES600’
ACCELERATION LENGTH1400’
POT Sta 20+00.00
20
25
PC Sta 2
5+31.88
30
PT
Sta 30
+38.7
6
PO
T
Sta 31+62.0
0
ISSUE 5 - NB I-95 Acceleration Lane
Option 1 - Combine Ramps
barrier separation , auxiliary lane and shoulder
- Provides desirable acceleration and lane drop lengths by extending
- Corrects vertical "dip" at approach to Christina Creek Bridge
- Reduced shoulder for 25(+/-) ft could prevent widening of Christina Creek Bridge
DS=25 mph
SE=6.0%
R=200’ (EXIST)
R=3000’
SE=
DS=
DS=45 mph
SE=RC
R=6000’
R=5068’
SE=
DS=
A A
B N/A
F F
C B
CC
I-95 / SR 896 Interchange Improvements
Christina Creek Bridge
1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at
2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility
3. SB SR 896 - Weave between I-95 Ramps
4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896
5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95
10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance
NO BUILD PROPOSED
MERGE
NO BUILD PROPOSED
MERGENO BUILD PROPOSED
WEAVE
NO BUILD PROPOSED
MAINLINE
NO BUILD PROPOSED
MAINLINE
one conflict point on the mainline
- Combines both I-95 Northbound Ramps into single freeway entrance, eliminating
- Shifts ramp location under SR 896 overpass between south abutment and pier
than 2,250-2,400 pc/h through the merge
- The HCM indicates it is unlikely that two-lane on-ramps can accommodate more
Iss5opt1.dgn
(No longer under consideration)
7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting
2015 PM PEAK
2015 PM PEAK
2015 PM PEAK
2015 PM PEAK
2015 PM PEAK
- Merging volume is within 50 vehicles of capacity (2015)
- The two-lane ramp will have 4,090 pc/h in design year (2015)
(No longer under consideration)
6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements
8. SB I-95 - Rutting at the Welsh Tract Road Bridge
CHRISTINA CREEK
SR 896 N
B
SR 896 SB
I-95 NB
I-95 SB
PARK
IRON HILL
INDUSTRIAL PARK
DIAMOND STREET
RR TR
AC
K
CH
APEL STR
EET
BRIDGE
EXISTING
WIDEN
BARRIER
CONSTRUCT
BRIDGE
EXISTING
WIDEN
PO
T Sta 70+00.0
0
70
PC Sta 73+85.0
0
75
PCC Sta 77+38.0
0
PT
Sta 7
9+5
6.9
1
80 85
PC
Sta 8
6+05.4
3
90
PC
C
Sta 93
+91.5
1
95
PR
C
Sta 96
+14.4
8
PR
C
Sta 98
+29.8
3
100
PT
Sta 10
1+74.8
6
105
110
115
120
PO
T
Sta 12
3+29.8
3
SIGN
MH
GUY
DECK
DECK
SIGN
C
SIGN
CONC
C.B.
C.B.
C.B.
RIP-RAP
RIP-RAP
CONCASPH CONC
CONC
CONCASPH
ASPH
ASPH
SIGNSIGN
MH
CONC
ASPH
SIGN
SIGN
ASPH
BRUSH
MH
CONC
ASPH
ASPH
I -
95
RAMP
CONCI - 95 RAMP
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
I - 95
RA
MP
CO
LL
EG
E
AV
EN
UE S
OU
TH
DE - 896
SIGN
SIGN
SIGN
DIDIDIDI
MH
SIGN
SIGN
C.B.
C.B.
C.B.
C.B.
C.B.
MH
MH
C.B.
DI
SIGN
CONC
CONC
CONCCONC ASPH
ASPH
ASPH
ASPH
C.B.
SIGN
DI
DI
DI
DI
SIGN
SIGN
DI
DI
DIDI
DI
DI
C.B.
SIGN
DI
DIDI
C.B.
DI
DI
MH
MH
DI
DI
SIGN
SIGN
CONC
CONC
ASPH
ASPHASPH
ASPH
SIGN
CONC
ASPH
ASPH
SIGN
DI
SIGN
SIGN
POOLDECK
C.B.
C.B.
MH
CONC
ASPH
C.B.
RIP-RAP
C.B.
C.B.C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
CONC DITCH
CO
NC
CO
LLE
GE
AV
EN
UE S
OU
TH
NB
L
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
CO
NC
CONC
CO
NC
WALL
ASPH
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL
ASPH
CO
NC
CONC
CONC DITCH
CONC DITCH
DENSE TREES
DAM
CANOPY
CA
NO
PY
TRANS
RIP-RAP
RIP-RAP
CONC ASPH PARKING
ASPH PARKING
C.B.
CHRIS
TIN
A RIV
ER
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
CHRIS
TIN
A RIV
ER
DENSE TREES
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
DE - 986
C.B.
CO
NC
C.B.
FO
FO
FO
C.B.
C.B.
J.W.
J.W.
J.W.
GMKR
MH
S
VENT
C.B.
J.W.
EV
EV
EV
EV
G
S
PL
PL
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
ER
W
&
DA
ERW & DA
ERW & DA
ERW
& DA
ERW & DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
ERW &
DA
ERW &DA
ERW &DA
ERW &DA
ER
W
&D
A
ER
W
&
DA
ER
W
&
DA
ERW &
DA
ERW &
DA
ER
W
&
DA
ER
W
&
DA
ERW
& DA
ERW
& DA
ER
W
&
DA
ERW
& DA
ERW & DA
ERW & DA
ERW & DA
--
--
ER
W
&
DA
PL
PL
PL
PL
O/
H
SIG
N
C.B.
MH
CONC
DI
DI
SIGN
SIGN
SIGN
BILLBOARD
AC
AC
AC
AC
AC
AC
CONC
C
C
C
C
CC
CONC
ASPH
RAMP
TANK
DECK
TANK
TANK
TANK
TANK
TANK
CONC
CONCCONC
TANK
TANK
TANKTANK
TANK
CONC
C.B.
GATE
CONC
C.B.
TANK
TR
TR
SIGN
C.B.
SIGN
MH
GATE
TANK
TRANS
CONC
MH
DI
DI
DI
DI
RAMP
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
BIL
LB
OA
RD
GATE
ASPH PARKING
OPEN STORAGE
OPEN STORAGE
ASPH
ASPH
ASPH PARKING
A/
C
A/
C
A/
C
CO
NC
FO
J.W.
J.W.
C.B.
PC
Sta 10
+00.0
0
10
15
PC
C
Sta 18
+91.6
2
20
PC
C
Sta 21+
88.3
1
25
PC
C Sta 28+27.7
4
30
PT St
a 31
+19.
58
PLAN LEGEND
APPROXIMATE EXISTING RIGHT OF WAY
PROPOSED ROADWAY PAVEMENT
EXISTING ROADWAY PAVEMENT
REMOVE EXISITING PAVEMENT
PROPOSED OVERLAY
N
896
DS=50 mph
SE=6.0%
R=835’
DS=60 mph
SE=6.0%
R=1500’
DS=50 mph
SE=5.9%
R=1000’
EXIST.100’
95
I NTERSTATE
EXIST. R/W
EXIST. R/W
EXIST. R
/W
TO TOLL PLAZA
TO WIL
MINGTON
EXIST. R/W
RAMPA/C
CONC
MH
POOLCONC
CS
W
CO
NC
C.B.
CANOPY
TR
c
c
CONC
ASPH PARKING
Delaware Department of Transportation
JULY 28, 2003& KAHL
RUMMEL, KLEPPER
PLAN SCALE
0 50 100 200
ISSUES:
COMMENTS:
ISSUE 10 - SB I-95 Ramp Geometry
- Improves the Geometry of the existing SB I-95 ramp onto NB SR 896
EXISTING DECELARATION LENGTH790’
I-95 / SR 896 Interchange Improvements
9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes
Christina Creek Bridge
1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at
2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility
3. SB SR 896 - Weave between I-95 Ramps
4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896
5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95
10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance
(No longer under consideration)
7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting
- Increases merging length onto NB SR 896 by 75 ft
Option 1 - Improve Ramp Geometry
- Improved ramp geometry should improve merge condition onto NB SR 896
this area
- Moves ramp gore closer to SB I-95 loop ramp. Vehicles queue onto shoulder in
(No longer under consideration)
6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements
8. SB I-95 - Rutting at the Welsh Tract Road Bridge
Iss10opt1.dgn
INDUSTRIAL PARK
DIAMOND STREET
PARK
IRON HILL
I-95 NB
I-95 SB
SR 896 SB
SR 896 N
B
CHRISTINA CREEK
C.B.
C.B.
SIGN
SIGN
DIDIDIDI
MH
SIGN
SIGN
C.B.
C.B.
C.B.
C.B.
C.B.
MH
C.B.
DI
SIGN
CONC
C.B.
DI
DI
DI
DI
SIGN
SIGN
DI
DI
DIDI
DI
DI
C.B.
DI
DIDI
C.B.
DI
DI
SIGN ASPH
SIGN
POOLDECK
CONC DITCH
CO
NC
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
CO
NC
CONC
ASPH
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL
ASPH
CO
NC
CONC
CONC DITCH
CONC DITCH
DENSE TREES
C.B.
C.B.
C.B.
C.B.
C.B.
CHRIS
TIN
A RIV
ER
DENSE TREES
FO
FO
FO
C.B.
J.W.
S
C.B.
J.W.
EV
EV
EV
EV
S
--
--
--
--
ERW & DA
ER
W
&
DA
ERW
& DA
ERW & DA
92041
72.81
N
PLAN LEGEND
APPROXIMATE EXISTING RIGHT OF WAY
PROPOSED ROADWAY PAVEMENT
EXISTING ROADWAY PAVEMENT
PROPOSED OVERLAY
REMOVE EXISITING PAVEMENT
81828384858687
PC
Sta 87
+4
2.1
1
88
PC
C
Sta 88
+63.7
2
89
90
PC
C Sta 90+06.7
2
91
92
93
94
95 96
97
PCC Sta 97+2
2.5
4
98
PT St
a 98
+93.
54
99
100
101
102
103
104
POT St
a 10
4+27.
77
12’ SHOULDER
15’ LANE
896
DS = 25 mph
SE = 6.0%
R = 210’
DS = 35 mph
SE = 6.0%
R = 400’
DS = 35 mph
SE = 5.4%
R = 600’ (Exist.)
TO WILMINGTON
TO TOLL PLAZA
Exist. R/W
DS = 35 mph
SE = 5.0%
R = 700 (Exist.)
Exist. R/W
95
I NTERSTATE
Delaware Department of Transportation
JULY 28, 2003& KAHL
RUMMEL, KLEPPER
PLAN SCALE
0 25 100
ISSUES:
COMMENTS:
9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes
ISSUE 2 - SB I-95 Ramp Flat Grade
I-95 / SR 896 Interchange Improvements
2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility
3. SB SR 896 - Weave between I-95 Ramps
4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896
5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95
10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance
Christina Creek Bridge
1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at
- Reconstructs existing loop ramp
- Removes existing flat grade at location of previous ramp toll facility
(Existing - 10 mph; Option 1 - 20 mph; Option 2 - 25 mph)
- Improves ramp geometry and design speed
GUTTER
CURB AND
PROPOSED
Iss2opt2.dgn
(No longer under consideration)
7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting
Option 2 - Improve Ramp Alignment
50
(No longer under consideration)
6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements
8. SB I-95 - Rutting at the Welsh Tract Road Bridge
I-95 SB
I-95 NB
SR 896 N
B
SR 896 SB
CHRISTINA CREEK
RAMP
RAMPA/C
CONC
MH
SIGN
RAMP
CONC
CSW
RAMP
MH
POOLCONC
SIGN
SIG
N
F.H.
SIGN
MH
GUY
DECK
DECK
SIGN
C
SIGN
CONC
CONC
F.H.
SIGN
SIGN
CS
W
CS
W
C.B.
C.B.
C.B.
RIP-RAP
RIP-RAP
CO
NC
ASPH PARKING
C.B.
CONCASPH
ASPH
CONC
CONC
CONC
CONCASPH
ASPH
ASPH
SIGNSIGN
RIP-RAP
CONC
ASPH
O/H
SIGN
MH
CONC
ASPH
SIGN
SIGN
CONCASPH
ASPHCONC
ASPH
BRUSH
SIGN
SIGN
MH
CONC
ASPH
ASPH
CO
LL
EG
E
AV
EN
UE
SO
UT
H
DE - 896
C.B.
C.B.
C.B.
C.B.
I -
95
RAMP
CONCI - 95 RAMP
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
I - 95
RA
MP
CO
LL
EG
E
AV
EN
UE S
OU
TH
DE - 896
C.B.
SIGN
SIGN
SIGN
DIDIDIDI
MH
SIGN
SIGN
C.B.
C.B.
C.B.
C.B.
C.B.
MH
MH
C.B.
DI
SIGN
CONC
CONC
CONCCONC ASPH
ASPH
ASPH
ASPH
C.B.
SIGN
DI
DI
DI
DI
SIGN
SIGN
DI
DI
DIDI
DI
DI
C.B.
SIGN
DI
DIDI
C.B.
DI
DI
MH
MH
DI
DI
SIGN
SIGN
CONC
CONC
ASPH
ASPHASPH
ASPH
SIGN
CONC
ASPH
ASPH
SIGN
DI
SIGN
SIGN
POOLDECK
C.B.
C.B.
MH
CONC
ASPH
C.B.
RIP-RAP
C.B.
C.B.C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
CONC DITCH
CO
NC
CO
LLE
GE
AV
EN
UE S
OU
TH
NB
L
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
CO
NC
CONC
CO
NC
WALL
ASPH
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL
ASPH
CO
NC
CONC
CONC DITCH
CONC DITCH
DENSE TREES
DAM
CANOPY
TR
TR
TR
TR
TR
POOL
CANOPY
CA
NO
PY
CANOPY
CANOPY
TRANS
CONC
RIP-RAP
RIP-RAP
c
c
CONC
CONC
ASPH PARKING
UNPAVED PARKING
ASPH PARKING
ASPH PARKING
ASPH PARKING
CONC ASPH PARKING
ASPH PARKING
C.B.
CHRIS
TIN
A RIV
ER
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
CHRIS
TIN
A RIV
ER
DENSE TREES
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
DE - 986
ASPH PARKING
C.B.
C.B.
ASPH PARKING
ASPH PARKING
C.B.
CO
NC
C.B.
FO
FO
FO
C.B.
C.B.
J.W.
J.W.
J.W.
J.W.
J.W.
J.W.
J.W.
GMKR
MH
MH
MH
S
D
VENT
C.B.
J.W.
EV
EV
EV
EV
EV
G
S
PL
PL
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
ERW & DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW
& DA
ERW & DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
ERW &
DA
ERW &DA
ERW &DA
ERW &DA
ER
W
&D
A
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ERW &
DA
ERW &
DA
ERW & DA
ER
W
&
DA
ER
W
&
DA
ERW
& DA
ERW
& DA
ER
W
&
DA
ERW
& DA
ERW
& DA
ER
W
&
DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
--
--
--
ER
W
&
DA
PL
PL
PL
PL
C.B.
C.B.
O/
H
SIG
N
C.B.
MH
CONC
DI
DI
SIGN
SIGN
SIGN
BILLBOARD
AC
AC
AC
AC
AC
AC
CONC
C
C
C
C
CC
CONC
ASPH
RAMP
TANK
DECK
TANK
TANK
TANK
TANK
TANK
CONC
CONCCONC
TANK
TANK
TANKTANK
TANK
CONC
C.B.
GATE
CONC
C.B.
TANK
TR
TR
SIGN
C.B.
SIGN
MH
GATE
TANK
TRANS
CONC
MH
DI
DI
DI
DI
RAMP
92041
72.81
92061
106.88
92062
72.89
93041
63.26
93061
63.00
93062
64.10
93063
63.65
93064
91.14
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
BIL
LB
OA
RD
GATE
GATE
MH
MH
SIGN
SIGN
MH
MH
MH
MH
LAMPLAMP
LAMP
SIGNSIGN
GATE
GATE
C.B.
SIGN
SIGN
C.B.
TANK
MH
SIGN
SIGN
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
BIL
LB
OA
RD
GATE
TR
GATE
C.B.
C.B.
RIP-RAP
RIP-RAP
GATE
MH
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
SIGN
SIGN
BIL
LB
OA
RD
TR
GA
TE
GATE
F.H.
CONC
CONC
ASPH PARKING LOT
SIGN
CONC
MH
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
JOHN F.
KENNEDY MEMORIAL
HIGHWAY
JOHN F.
KENNEDY MEMORIAL
HIGHWAY
CONC
CH
AP
EL
ST
RE
ET
BROOKHILL DRIVE
DIRT PARKING
DIRT PARKING
TRAILER
ASPH PARKING
ASPH PARKING
CONC
ASPH PARKING
ASPH PARKING
CONC
RA
MP
TRAILER
TRAILER
DIRT PARKING
C
ASPH PARKING
DIRT P
ARKING
ASPH PARKING
CONC
CONC
ASPH PARKING
CS
W
ASPH
ASPH
CS
W
CS
W
TRANS GRAVEL
ASPH PARKING
ASPH
CONC
ASPH PARKING
ASPH
ASPH PARKING
GRAVEL
OPEN STORAGE
OPEN STORAGE
ASPH
ASPH
ASPH PARKINGCONC
ASPH
CONC
RAMP
A/
C
A/
C
A/
C
CO
NC
DIRT PARKING
FO
J.W.
J.W.
C.B.
N
PLAN LEGEND
APPROXIMATE EXISTING RIGHT OF WAY
PROPOSED ROADWAY PAVEMENT
EXISTING ROADWAY PAVEMENT
REMOVE EXISITING PAVEMENT
PROPOSED OVERLAY896
REMOVED
TO BE
BRIDGE
EXIST. EXIST. R/W
TO TOLL PLAZA
BRIDGE
EXISTING
WIDEN
SIGN
OVERHEAD
REPLACE
EXIST. R
/W
EXIST. R/W
TAPER LENGTH300’
TWO-LANE E
XIT2500’
EXIST. R/W
TO WILMIN
GTON
BRIDGE
EXISTING
WIDEN
95
I NTERSTATE
TAPER300
’
Delaware Department of Transportation
JULY 28, 2003& KAHL
RUMMEL, KLEPPER
PLAN SCALE
0 50 100 200
ISSUES:
COMMENTS:
DECELERATION L
ENGTH600
’
DECELERATION L
ENGTH130
0’
AD
B B
F
F
CC
I-95 / SR 896 Interchange Improvements
ISSUE 3 - SB SR 896 Weave
- Improves the geometry of the SB I-95 to NB SR 896 off-ramp
9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes
Christina Creek Bridge
1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at
2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility
3. SB SR 896 - Weave between I-95 Ramps
4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896
5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95
8. SB I-95 - Rutting at the Welsh Tract Road Bridge
10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance
(No longer under consideration)
6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements
(No longer under consideration)
7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting
intersection on SR 896 that operates at LOS D
- Improves SB I-95 mainline operations, but creates a new signalized
- New signal will provide gaps for NB I-95 to NB SR 896 ramp
- New signal provides a phase for NB SR 896 to SB I-95 movement
2015 PM PEAK
NO BUILD PROPOSED
MAINLINE
INTERSECTION
2015 PM PEAK
NO BUILD PROPOSED
N/A
2015 PM PEAK
NO BUILD PROPOSED
WEAVE
N/A
2015 PM PEAK
NO BUILD PROPOSED
DIVERGE
N/A
2015 PM PEAK
NO BUILD PROPOSED
DIVERGE
2015 PM PEAK
NO BUILD PROPOSED
MAINLINE
Iss3opt2.dgn
BRIDGE
EXISTING
WIDEN
BRIDGE
EXISTING
WIDEN
D
PIKE
BALTIMORE
TO OLD
3RD LANE
CONSTRUCT
PC
Sta 20
+00.0
0
20
PC
C
Sta 23
+02.3
0
25
30
PRC St
a 33
+64.
6835
PT St
a 37
+09.
40
POT
Sta
38+3
6.15
PO
T
Sta 9
+00.0
0
10
15
20
25
30
PC
Sta 30
+00.0
0
35
40
PR
C
Sta 4
0+52.5
3
PR
C
Sta 4
2+00.8
8
PT
Sta 4
3+3
9.2
7
4550
PC
Sta 5
3+64.8
3
55
PC
C
Sta 56
+02.3
1
PC
C Sta 57+01.21
60
PC
C Sta 61+
00.6
9
PT
Sta 63
+5
5.8
7
CURVE 4
R=350’
SE=6.0%
DS=30 mph
CURVE 3
R=190’
SE=6.0%
DS=25 mph
CURVE 1
R=650’
SE=6.0%
DS=45 mph
CURVE 2
R=380’
SE=6.0%
DS=35 mph
BARRIER
CONSTRUCT
BRIDGE
EXISTING
WIDEN
- Eliminates SB SR 896 weave between I-95 ramps due to metering by new signal
- Eliminates flat grade at previous toll facility (Issue 2)
- NB SR 896 is not controlled by signal (always green)
"PARTIAL"
NEW SIGNAL
- Provides over 2000 ft of two-lane storage capacity for SB I-95 to SB SR 896 Ramp
Option 2 - Combine SB I-95 Off Ramps
Construct Double Loop Ramp
I-95 NB
I-95 SB
CHRISTINA CREEK
SR 896 N
B
SR 896 SB
INDUSTRIAL PARK
DIAMOND STREET
RR TR
AC
K
CH
APEL STR
EET
PARK
IRON HILL
CONCASPH CONC
CONC
CONCASPH
ASPH
ASPH
SIGNSIGN
MH
CONC
ASPH
SIGN
SIGN
ASPH
BRUSH
MH
CONC
ASPH
ASPH
I -
95
RAMP
CONCI - 95 RAMP
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
I - 95
RA
MP
CO
LL
EG
E
AV
EN
UE S
OU
TH
DE - 896
SIGN
SIGN
SIGN
DIDI
MH
C.B.
DI
SIGN
CONC
CONC
CONCCONC ASPH
ASPH
ASPH
ASPH
C.B.
DI
DI DI
DI
DIDI
C.B.
DI
DI
MH
MH
DI
DI
SIGN
SIGN
CONC
CONC
ASPH
ASPHASPH
ASPH
SIGN
CONC
ASPH
ASPH
SIGN
DI
SIGN
CONC DITCH
CO
NC
CO
LLE
GE
AV
EN
UE S
OU
TH
NB
L
CONC
CO
NC
WALL
ASPH
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL
ASPH
CO
NC
C.B.
J.W.
J.W.
GMKR
MH
VENT
EV
G
--
--
--
--
ER
W
&
DA
ERW &
DA
ERW
& DA
ERW
& DA
ER
W
&
DA
ERW
& DA
N
PLAN LEGEND
APPROXIMATE EXISTING RIGHT OF WAY
PROPOSED ROADWAY PAVEMENT
EXISTING ROADWAY PAVEMENT
REMOVE EXISITING PAVEMENT
STOP
AHEAD
STOP
STOP
LEFT TURN
R=50’
R=500’
R=500’
1’ offset)
offset +
(12’ Lane + 1’
Total Width 14’
2’
8’
R=150’
R=150’
R=50’
PROPOSED OVERLAY
2’ MEDIAN CURB
2’ MEDIAN CURB
15’ L
ANE
10’ S
HOULDER
4’ SHOULDER
896
Iron Hill Park
Exist. R/W
TO WILMINGTON
95
I NTERSTATE
ISSUES:
COMMENTS:
Delaware Department of Transportation
JULY 28, 2003& KAHL
RUMMEL, KLEPPER
PLAN SCALE
0 25 10050
ISSUE 4 - Left Turn Onto NB SR 896
I-95 / SR 896 Interchange Improvements
Christina Creek Bridge
1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at
2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility
3. SB SR 896 - Weave between I-95 Ramps
4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896
5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95
of two stage condition
- Delineators could be added to channelizing island to enhance visibility
- Improved signing along ramp to better identify left turn condition
- Provides better lane width definition along approach leg of ramp
Signal Warrant
- Signal Warrant Analysis was performed in August 2002
not be a substantial reason to justify signal installation
Since the intersection does not meet any of the other warrants, Warrant 6 may
- Signal Warrant 6 - Coordinated Signal System was the only warrant met.
the intersection
to the intersection and of angle collisions involving left turns from
- Recent accident history of rear-end collisions on the weaving segment prior
Eliminate Ramp
movement:
- FHWA recommended the following process to remove the NB I-95 to NB SR 896 Ramp
- Full report should be prepared and submitted to Delaware FHWA Office
9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes
8. SB I-95 - Rutting at the Welsh Tract Road Bridge
10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance
(No longer under consideration)
6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements
(No longer under consideration)
7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting
Option 2 - Provide Left Turn Channelization
allowing for a two-stage gap acceptance
- Improves left turn channelization and separation from NB SR 896
be inadequate when there is traffic in the auxiliary lane (NB I-95 loop ramp)
north (oncoming SB SR 896 through traffic) is not improved and may
- Sight distance for vehicles stopped at the end of the ramp looking
AM; 15 vehicles PM)
- Relatively low volume of vehicles turning left from the ramp (9 vehicles
operates at LOS E during the AM peak and LOS F during the PM peak
- Capacity Analysis indicated that the left turn from the unsignalized intersection
- There was one reported fatality involving an accident with a left turning vehicle
redesign of the interchange
- Recommendations included geometric improvements at the intersection and/or a
Tuckers Association
- Issue should be presented to local MPO, the public and possibly the National
- Delaware FHWA would take issue to FHWA Headquarters and possibly AASHTO
safety issues
- Concern of the national implications created by closing a ramp due to
Iss4opt2.dgn
finding an alternate solution for the ramp
- FHWA has suggested gaining approval may be difficult. Therefore we recommend
(0
MP
H to 35
MP
H)
260’
the existing bridge
- Can extend median acceleration lane to provide additional length without widening
I-95 NB
SR 896 N
B
SR 896 SB
RAMP
RAMPA/C
CONC
MH
SIGN
RAMP
CONC
CSW
RAMP
MH
POOLCONC
SIGN
SIG
N
F.H.
SIGN
MH
GUY
DECK
DECK
SIGN
C
SIGN
CONC
CONC
F.H.
SIGN
SIGN
CS
W
CS
W
C.B.
C.B.
C.B.
RIP-RAP
RIP-RAP
CO
NC
ASPH PARKING
C.B.
CONCASPH
ASPH
CONC
CONC
CONC
CONCASPH
ASPH
ASPH
SIGNSIGN
RIP-RAP
CONC
ASPH
O/H
SIGN
MH
CONC
ASPH
SIGN
SIGN
CONCASPH
ASPHCONC
ASPH
BRUSH
SIGN
SIGN
MH
CONC
ASPH
ASPH
CO
LL
EG
E
AV
EN
UE
SO
UT
H
DE - 896
C.B.
C.B.
C.B.
C.B.
I -
95
RAMP
CONCI - 95 RAMP
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
I - 95
RA
MP
CO
LL
EG
E
AV
EN
UE S
OU
TH
DE - 896
C.B.
SIGN
SIGN
SIGN
DIDIDIDI
MH
SIGN
SIGN
C.B.
C.B.
C.B.
C.B.
C.B.
MH
MH
C.B.
DI
SIGN
CONC
CONC
CONCCONC ASPH
ASPH
ASPH
ASPH
C.B.
SIGN
DI
DI
DI
DI
SIGN
SIGN
DI
DI
DIDI
DI
DI
C.B.
SIGN
DI
DIDI
C.B.
DI
DI
MH
MH
DI
DI
SIGN
SIGN
CONC
CONC
ASPH
ASPHASPH
ASPH
SIGN
CONC
ASPH
ASPH
SIGN
DI
SIGN
SIGN
POOLDECK
C.B.
C.B.
MH
CONC
ASPH
C.B.
RIP-RAP
C.B.
C.B.C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
CONC DITCH
CO
NC
CO
LLE
GE
AV
EN
UE S
OU
TH
NB
L
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
CO
NC
CONC
CO
NC
WALL
ASPH
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL
ASPH
CO
NC
CONC
CONC DITCH
CONC DITCH
DENSE TREES
DAM
CANOPY
TR
TR
TR
TR
TR
POOL
CANOPY
CA
NO
PY
CANOPY
CANOPY
TRANS
CONC
RIP-RAP
RIP-RAP
c
c
CONC
CONC
ASPH PARKING
UNPAVED PARKING
ASPH PARKING
ASPH PARKING
ASPH PARKING
CONC ASPH PARKING
ASPH PARKING
C.B.
CHRIS
TIN
A RIV
ER
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
CHRIS
TIN
A RIV
ER
DENSE TREES
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
DE - 986
ASPH PARKING
C.B.
C.B.
ASPH PARKING
ASPH PARKING
C.B.
CO
NC
C.B.
FO
FO
FO
C.B.
C.B.
J.W.
J.W.
J.W.
J.W.
J.W.
J.W.
J.W.
GMKR
MH
MH
MH
S
D
VENT
C.B.
J.W.
EV
EV
EV
EV
EV
G
S
PL
PL
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
ERW & DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW
& DA
ERW & DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
ERW &
DA
ERW &DA
ERW &DA
ERW &DA
ER
W
&D
A
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ERW &
DA
ERW &
DA
ERW & DA
ER
W
&
DA
ER
W
&
DA
ERW
& DA
ERW
& DA
ER
W
&
DA
ERW
& DA
ERW
& DA
ER
W
&
DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
--
--
--
ER
W
&
DA
PL
PL
PL
PL
C.B.
C.B.
O/
H
SIG
N
C.B.
MH
CONC
DI
DI
SIGN
SIGN
SIGN
BILLBOARD
AC
AC
AC
AC
AC
AC
CONC
C
C
C
C
CC
CONC
ASPH
RAMP
TANK
DECK
TANK
TANK
TANK
TANK
TANK
CONC
CONCCONC
TANK
TANK
TANKTANK
TANK
CONC
C.B.
GATE
CONC
C.B.
TANK
TR
TR
SIGN
C.B.
SIGN
MH
GATE
TANK
TRANS
CONC
MH
DI
DI
DI
DI
RAMP
92041
72.81
92061
106.88
92062
72.89
93041
63.26
93061
63.00
93062
64.10
93063
63.65
93064
91.14
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
BIL
LB
OA
RD
GATE
GATE
MH
MH
SIGN
SIGN
MH
MH
MH
MH
LAMPLAMP
LAMP
SIGNSIGN
GATE
GATE
C.B.
SIGN
SIGN
C.B.
TANK
MH
SIGN
SIGN
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
BIL
LB
OA
RD
GATE
TR
GATE
C.B.
C.B.
RIP-RAP
RIP-RAP
GATE
MH
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
SIGN
SIGN
BIL
LB
OA
RD
TR
GA
TE
GATE
F.H.
CONC
CONC
ASPH PARKING LOT
SIGN
CONC
MH
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
JOHN F.
KENNEDY MEMORIAL
HIGHWAY
JOHN F.
KENNEDY MEMORIAL
HIGHWAY
CONC
CH
AP
EL
ST
RE
ET
BROOKHILL DRIVE
DIRT PARKING
DIRT PARKING
TRAILER
ASPH PARKING
ASPH PARKING
CONC
ASPH PARKING
ASPH PARKING
CONC
RA
MP
TRAILER
TRAILER
DIRT PARKING
C
ASPH PARKING
DIRT P
ARKING
ASPH PARKING
CONC
CONC
ASPH PARKING
CS
W
ASPH
ASPH
CS
W
CS
W
TRANS GRAVEL
ASPH PARKING
ASPH
CONC
ASPH PARKING
ASPH
ASPH PARKING
GRAVEL
OPEN STORAGE
OPEN STORAGE
ASPH
ASPH
ASPH PARKINGCONC
ASPH
CONC
RAMP
A/
C
A/
C
A/
C
CO
NC
DIRT PARKING
FO
J.W.
J.W.
C.B.
PO
T Sta 70+00.0
0
70
PC Sta 71+
65.3
0
PCC Sta 7
4+9
4.3
0
75
PC
C
Sta 77
+39.10
PT
Sta 7
8+5
5.1
0
80 85
PC
Sta 8
6+69.4
5
90
95
PT
Sta 98
+75.1
9
N
PLAN LEGEND
APPROXIMATE EXISTING RIGHT OF WAY
PROPOSED ROADWAY PAVEMENT
EXISTING ROADWAY PAVEMENT
REMOVE EXISITING PAVEMENT
PROPOSED OVERLAY
896
DS= 70 mph
SE= NC
R = 14000’
CHRISTINA CREEK
95
I NTERSTATE
EXIST. R/W
EXIST. R
/W
EXIST. R
/W
TO WILMIN
GTON
TO TOLL PLAZA
ACCELARATION LENGTH
1420’
TAPER LENGTH600’
Delaware Department of Transportation
JULY 28, 2003& KAHL
RUMMEL, KLEPPER
PLAN SCALE
0 50 100 200
ISSUES:
COMMENTS:
9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes
ISSUE 5 - NB I-95 Acceleration Lane
DS=
SE=
R=200’(Exist)
DS=
SE=
R=340’(Exist)
DS=
SE=
R=600’(Exist)
DS=
SE=
R=5000’(Exist)
DS= 60 mph
SE= 3.8%
R=4000’
R=5068’(Exist)
SE= 3.7%
DS= 70 mph
I-95 / SR 896 Interchange Improvements
Christina Creek Bridge
1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at
2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility
3. SB SR 896 - Weave between I-95 Ramps
4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896
5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95
8. SB I-95 - Rutting at the Welsh Tract Road Bridge
10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance
PC
Sta 2
0+00.0
0
20
PC
C
Sta 23
+00.0
0
25
30
PR
C
Sta 31+
94.2
0
35 PT
Sta 37
+61.8
5
40
45
PO
T
Sta 4
7+61.
85
Option 2 - Extend Existing Acceleration Lane
(No longer under consideration)
6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements
(No longer under consideration)
7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting
- Corrects vertical "dip" at approach to Christina Creek Bridge
- Construct barrier between ramps
Iss5opt2.dgn
BARRIER
CONSTRUCT
TAPER LENGTH600’
- Longer merge - better density and lane use along I-95
(25 mph to 70 mph)
- Extends existing acceleration lane length to AASHTO 1,420 ft. required
2213’
ACCELERATION L
ENGTH
SR 896 SB
SR 896 N
B
I-95 NB
I-95 SB
PARK
IRON HILL
INDUSTRIAL PARK
DIAMOND STREET
CH
APEL STR
EET
RR TR
AC
KBRIDGE
EXISTING
WIDEN
SIGN
SIG
N
F.H.
SIGN
MH
GUY
DECK
DECK
SIGN
C
SIGN
CONC
CONC
F.H.
SIGN
C.B.
C.B.
C.B.
RIP-RAP
RIP-RAP
CONCASPH
ASPH
CONC
CONC
CONC
CONCASPH
ASPH
ASPH
SIGNSIGN
RIP-RAP
CONC
ASPH
O/H
SIGN
MH
CONC
ASPH
SIGN
SIGN
CONCASPH
ASPHCONC
ASPH
BRUSH
SIGN
SIGN
MH
CONC
ASPH
ASPH
CO
LL
EG
E
AV
EN
UE
SO
UT
H
DE - 896
C.B.
C.B.
C.B.
C.B.
I -
95
RAMP
CONCI - 95 RAMP
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
I - 95
RA
MP
CO
LL
EG
E
AV
EN
UE S
OU
TH
DE - 896
SIGN
SIGN
SIGN
DIDIDIDI
MH
SIGN
SIGN
C.B.
C.B.
C.B.
C.B.
C.B.
MH
MH
C.B.
DI
SIGN
CONC
CONC
CONCCONC ASPH
ASPH
ASPH
ASPH
C.B.
SIGN
DI
DI
DI
DI
SIGN
SIGN
DI
DI
DIDI
DI
DI
C.B.
SIGN
DI
DIDI
C.B.
DI
DI
MH
MH
DI
DI
SIGN
SIGN
CONC
CONC
ASPH
ASPHASPH
ASPH
SIGN
CONC
ASPH
ASPH
SIGN
DI
SIGN
SIGN
POOLDECK
C.B.
C.B.
MH
CONC
ASPH
C.B.
RIP-RAP
C.B.
C.B.C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
CONC DITCH
CO
NC
CO
LLE
GE
AV
EN
UE S
OU
TH
NB
L
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
CO
NC
CONC
CO
NC
WALL
ASPH
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL
JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL
ASPH
CO
NC
CONC
CONC DITCH
CONC DITCH
DENSE TREES
DAM
POOL
CANOPY
CA
NO
PY
CANOPY
CANOPY
TRANS
RIP-RAP
RIP-RAP
ASPH PARKING
ASPH PARKING
CONC ASPH PARKING
ASPH PARKING
C.B.
CHRIS
TIN
A RIV
ER
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
CHRIS
TIN
A RIV
ER
DENSE TREES
CO
LLE
GE
AV
EN
UE S
OU
TH S
BL
DE - 986
ASPH PARKING
C.B.
C.B.
ASPH PARKING
CO
NC
C.B.
FO
FO
FO
C.B.
C.B.
J.W.
J.W.
J.W.
J.W.
J.W.
J.W.
J.W.
GMKR
MH
MH
MH
S
D
VENT
C.B.
J.W.
EV
EV
EV
EV
EV
G
S
PL
PL
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
ERW & DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW
& DA
ERW & DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
ERW &
DA
ERW &DA
ERW &DA
ERW &DA
ER
W
&D
A
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ERW &
DA
ERW &
DA
ERW & DA
ER
W
&
DA
ER
W
&
DA
ERW
& DA
ERW
& DA
ER
W
&
DA
ERW
& DA
ERW
& DA
ER
W
&
DA
ER
W
&
DA
ER
W
&
DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
ERW & DA
--
--
ER
W
&
DA
PL
PL
PL
PL
C.B.
C.B.
O/
H
SIG
N
C.B.
MH
CONC
DI
DI
SIGN
SIGN
SIGN
BILLBOARD
AC
AC
AC
AC
AC
AC
CONC
C
C
C
C
CC
CONC
ASPH
RAMP
TANK
DECK
TANK
TANK
TANK
TANK
TANK
CONC
CONCCONC
TANK
TANK
TANKTANK
TANK
CONC
C.B.
GATE
CONC
C.B.
TANK
TR
TR
SIGN
C.B.
SIGN
MH
GATE
TANK
TRANS
CONC
MH
DI
DI
DI
DI
RAMP
92041
72.81
92061
106.88
92062
72.89
93041
63.26
93061
63.00
93062
64.10
93063
63.65
93064
91.14
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
BIL
LB
OA
RD
GATE
GATE
MH
MH
SIGN
SIGN
MH
MH
MH
MH
LAMPLAMP
LAMP
SIGNSIGN
GATE
GATE
C.B.
SIGN
SIGN
C.B.
TANK
MH
SIGN
SIGN
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
BIL
LB
OA
RD
GATE
TR
GATE
C.B.
C.B.
RIP-RAP
RIP-RAP
GATE
MH
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
BIL
LB
OA
RD
BRUSH
TR
GATE
GA
TE
GATE
F.H.
GATE
CONC
CONC
DIRT PARKING LOT
ASPH PARKING LOT
CONCCONC
SIGN
CONC
MH
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
C.B.
GATE
GATE
GATE
SIGN
SIGN
F.H.
CSW
ASPH
ASPH
CSW
GATE
GATE
OPEN STORAGE
GRAVEL
GRAVEL
OPEN STORAGE
SIGN
ASPH
ASPH
JOHN F.
KENNEDY MEMORIAL
HIGHWAY
JOHN F.
KENNEDY MEMORIAL
HIGHWAY
I - 95
SBL
I - 95
NBL
CONC
CH
AP
EL
ST
RE
ET
GRAVEL
GRAVEL
OPEN STORAGE
SIGN
CSW
ASPH PARKING
ASPH PARKING
BROOKHILL DRIVE
DIRT PARKING
DIRT PARKING
TRAILER
ASPH PARKING
ASPH PARKING
CONC
CONC
ASPH
GRAVEL
OPEN STORAGE
ASPH PARKING
ASPH PARKING
ASPH PARKING
CONC
RA
MP
TRAILER
TRAILER
DIRT PARKING
C
ASPH PARKING
DIRT P
ARKING
ASPH PARKING
CONC
CONC
ASPH PARKING
CS
W
ASPH
ASPH
CS
W
CS
W
TRANS GRAVEL
ASPH PARKING
ASPH
CONC
ASPH PARKING
ASPH
ASPH PARKING
GRAVEL
OPEN STORAGE
OPEN STORAGE
ASPH
ASPH
ASPH PARKINGCONC
ASPH
CONC
RAMP
A/
C
A/
C
A/
C
CO
NC
DIRT PARKING
FO
J.W.
J.W.
C.B.
N
CHRISTINA CREEK
896
RR TR
AC
K
PARK
IRON HILL
PLAN LEGEND
APPROXIMATE EXISTING RIGHT OF WAY
PROPOSED ROADWAY PAVEMENT
EXISTING ROADWAY PAVEMENT
REMOVE EXISITING PAVEMENT
PROPOSED OVERLAY
TO WILMIN
GTON
TO TOLL PLAZA
Delaware Department of Transportation
JULY 28, 2003& KAHL
RUMMEL, KLEPPER
PLAN SCALE
0 50 100 200
ISSUES:
COMMENTS:
ISSUE 3 - SB SR 896 Weave
95
I NTERSTATE
B
F
F
C
I-95 / SR 896 Interchange Improvements
N/A
2015 PM PEAK
NO BUILD PROPOSED
WEAVE
2015 PM PEAK
NO BUILD PROPOSED
DIVERGE
N/A
2015 PM PEAK
NO BUILD PROPOSED
DIVERGE
Iss3opt3.dgn
N/A
10
15
20
25
30
PC
Sta 33
+4
2.5
5
PT
Sta 34
+93.4
5
35
40
45
PC
Sta 4
7+93.4
5
50
PT Sta 52+73.0
7
55
60
PO
T Sta 62+75.8
8
Flyover
Option 3 - Eliminate SB I-95 to SB 896
B
2015 PM PEAK
NO BUILD PROPOSED
MAINLINE
PO
T Sta 70+00.0
0
70
PC Sta 71+
65.3
0
PCC Sta 7
4+9
4.3
0
75
PC
C
Sta 77
+39.10
PT
Sta 7
8+5
5.1
0
80 85
PC
Sta 8
6+69.4
5
90
95
PT
Sta 98
+75.1
9
DS=
SE=
R=600’(Exist)
DS=
SE=
R=340’(Exist)
DS=
SE=
R=200’(Exist)
TAPER LENGTH300’
AD
2015 PM PEAK
NO BUILD PROPOSED
MAINLINE
C
TWO-LANE E
XIT2800’
DECELERATION L
ANE130
0’
TAPER300
’
TAPER300
’
DECELERATION L
ANE600
’
POT Sta 20+00.00
20
PC Sta 2
2+85.51
25
PC
C Sta 28+63.5
1
30
PT
Sta 33
+53.6
4
35
40 PC
Sta 4
1+88.18
45
PT
Sta 4
7+17.9
5
50
55
PO
T
Sta 57
+17.9
5
DS=40 mph
SE=6.0%
R=525’
D - Eliminates SB SR 896 weave between I-95 ramps
9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes
Christina Creek Bridge
1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at
2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility
3. SB SR 896 - Weave between I-95 Ramps
4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896
5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95
10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance
(No longer under consideration)
7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting
intersection on SR 896 that operates at LOS D
- Improves SB I-95 mainline operations, but creates a new signalized
- Eliminates vertical "dip" at approach to Christina Creek bridge
- Provides nearly 550 ft. of three-lane storage capacity off I-95
- Eliminates geometric issues with SB I-95 ramp to NB SR 896 off-ramp
- New signal will provide phase for NB I-95 to NB SR 896 ramp
WEAVING L
ENGTH600’
(NBR)
ACCELARATION LENGTH
1420’
(NBR)TAPER LENGTH
600’
INTERSECTION
2015 AM PEAK
NO BUILD PROPOSED
N/A
2015 AM PEAK
NO BUILD PROPOSED
2015 AM PEAK
NO BUILD PROPOSED
MERGE
B B
MERGE
C C
at previous toll facility (Issue 2)
- Eliminates SB I-95 loop-ramp to SB SR 896 and eliminates flat grade
- Lengthens acceleration from SR 896 loop-ramp to NB I-95
(No longer under consideration)
6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements
8. SB I-95 - Rutting at the Welsh Tract Road Bridge
INDUSTRIAL PARK
DIAMOND STREET
I-95 SB
I-95 NB
SR 896 N
B
SR 896 SB
STRUCTURE
BRIDGE
PROPOSED
DS=55 mph
SE=6.0%
R=1065’
STRUCTURE
BRIDGE
PROPOSED
WALL
BY RETAINING
SUPPORTED
FILL
WALL
BY RETAINING
SUPPORTED
FILL
EXIST. R
/W
EXIST. R
/W
EXIST. R/W
DS=45 mph
SE=6.0%
R=700’
DS=70 mph
SE=NC
R=14000’
DS=60 mph
SE=6.0%
R=1355’
DS= 60 mph
SE= 3.8%
R=4000’
DS=70 mph
SE=5.3%
R=3000’
BRIDGE
EXISTING
WIDEN
NEW SIGNAL
BARRIER
CONSTRUCT
(1,200)
2,020
(2,010)
2,850
(2,920)
1,730
1,610
(2,100)
30
(30)
50
(40)
670
10
(20)
40
(30)
(70)
X
X
1,610
(1070)
3,630
(2,370)
50
(50)
(2,460)
1,430
(1,920)
1,770
N
I-95 SBR
I-95 NBR
896
I-95 SB
I-95 NB
TO TOLL PLAZA
TO WILMINGTON
896
95
I NTERSTATE
ISSUES:
COMMENTS:
9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes
Delaware Department of Transportation
JULY 28, 2003& KAHL
RUMMEL, KLEPPER
PLAN SCALE
ISSUE 5 - NB I-95 Acceleration Lane
NOT TO SCALE
NO BUILD PROPOSED
MAINLINE
NO BUILD PROPOSED
N/AF
WEAVE
NO BUILD PROPOSED
N/A
MERGE
INTERSECTION
NO BUILD PROPOSED
N/A F
40
NO BUILD PROPOSED
NO BUILD PROPOSED
MERGE
MAINLINE
F
F
AA
BC
CC
I-95 / SR 896 Interchange Improvements
Christina Creek Bridge
1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at
2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility
3. SB SR 896 - Weave between I-95 Ramps
4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896
5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95
8. SB I-95 - Rutting at the Welsh Tract Road Bridge
10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance
2013 AM PEAK
2015 AM PEAK
2015 AM PEAK
2015 AM PEAK
2015 AM PEAK
2015 AM PEAK
80
1,260
(1,070)
(1,300)
B
NOTE: TRAFFIC VOLUMES ARE PEAK HOUR AM (PM) FOR YEAR 2015
- This configuration eliminates the weave along SB SR 896
develops the SB I-95 to SB SR 896 ramp as the second through lane on SB SR 896
- Requires converting the left through lane on SB SR 896 to a left turn lane and
- A new signal would be installed along SR 896 (LOS F)
from NB I-95 to NB SR 896
- A phase could be added to the signal to provide time for the left turn
the NB SR 896 to SB I-95 left turn
- Queue length on SB SR 896 would be approximately 1,260 feet, possibly blocking
approximately 4,090 pc/h during the 2015 AM peak
- The combined volumes on the NB I-95 on-ramp from SB and NB SR 896 is
than 2,250 to 2,400 pc/h through a merge
- The HCM states that it is unlikely that two-lane on-ramps can accommodate more
southbound left turns to move through the inersection
- Congestion and slow moving traffic on the on-ramp meters the ability for
Option 3 - Eliminate SB 896 Ramp Onto NB I-95
Iss5opt3.dgn
(No longer under consideration)
6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements
(No longer under consideration)
7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting