12
SIGN SIGN MH DI DI ASPH ASPH ASPH ASPH SIGN CONC ASPH ASPH SIGN DI SIGN SIGN C. B. MH C. B. RIP-RAP C . B . C . B . C.B. C. B. C . B . C . B . C . B . C . B . C ON C D I T C H COLLEGE AVENUE SOUTH NBL DAM C. B. J.W. J.W. - - -- - - -- -- -- -- -- -- E R W & DA ERW & DA E R W & DA E R W & DA ERW & DA E R W & DA E R W & DA E R W & DA E R W & DA O/ H SI GN C. B. DI DI SIGN SIGN C . B . C . B . C . B . J.W. J . W. C . B . N PC St a 5+ 00. 00 5 6 7 8 9 PT St a 9+ 31 . 76 5 +50 6 +50 7 +50 8 +50 9 65 75 ELEV. 72.30 - 0 . 44 % - 0 . 26 % 72. 52 ELEV. 71.88 - 0 . 26 % - 0 . 51 % 70. 92 P.V.I. STA. 7+10.00 P.V.I. STA. 5+50.00 95 I N TE R S T A TE ISSUES: COMMENTS: 9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes Delaware Department of Transportation JULY 28, 2003 & KAHL RUMMEL, KLEPPER PLAN SCALE 0 25 100 50 - Corrects vertical "dip" at approach to Christina Creek Bridge lanes and ramp - New barrier installed to provide better separation between through - Existing inlets (2) need to be adjusted ISSUE 1 - Vertical "Dip" I-95 N.B. On-Ramp Option 1 - Adjust Vertical Profile T O WI L M I NG T ON TO TOLL PLAZA E X I S T . R / W PLAN LEGEND A PP R OX I M A TE E X I S T I NG R I GH T O F W AY P R O P O S E D R OAD W AY P AV E M E N T E X I S T I NG R OAD W AY P AV E M E N T REMOVE EXISITING PAVEMENT PROPOSED OVERLAY RAMP PROFILE EXISTING GRADE PROPOSED GRADE BARRIER CONSTRUCT LIMIT OF RECONSTRUCTION I-95 / SR 896 Interchange Improvements Christina Creek Bridge 1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at 2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility 3. SB SR 896 - Weave between I-95 Ramps 4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896 5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95 10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance SECTION A-A E X I S T I NG S L O P E SHLD. 6’ 3 % 3 % VARIES (3%-6%) SHOULDER SLOPE (N.T.S.) STA. 6+75 Iss1opt1.dgn A A H: 1"=50’, V: 1"=5’ PROFILE SCALE: OFFSET BARRIER CROSS SLOPE AND IN RAMP/SHOULDER IN GRADE MADE UP NOTE: DIFFERENCE SHLD. & LANES EXISTING I-95 CONSTRUCT PCC BARRIER CONCRETE ISLAND & REMOVE EXISTING (No longer under consideration) 7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting WIDTH LANE EXIST. MATCH WIDTH SHLDR. EXIST. MATCH (No longer under consideration) 6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements 8. SB I-95 - Rutting at the Welsh Tract Road Bridge C H R I S T I NA CR EE K I- 95 S B I- 95 N B

I-95 / SR 896 Interchange Improvementsbidcondocs.delaware.gov/DOT/DOT_15-1769I95and896Interchange... · Delaware Department of Transportation JULY 28, 2003 & KAHL ... AP R OX IM TE

  • Upload
    lecong

  • View
    217

  • Download
    3

Embed Size (px)

Citation preview

Page 1: I-95 / SR 896 Interchange Improvementsbidcondocs.delaware.gov/DOT/DOT_15-1769I95and896Interchange... · Delaware Department of Transportation JULY 28, 2003 & KAHL ... AP R OX IM TE

SIGN

SIGN

MH

DI

DI

ASPH

ASPHASPH

ASPH

SIGN

CONC

ASPH

ASPH

SIGN

DI

SIGN

SIGN

C.B.

MH

C.B.

RIP-RAP

C.B.

C.B.C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

CONC DITCH

CO

LLE

GE

AV

EN

UE S

OU

TH

NB

L

DAM

C.B.

J.W.

J.W.

--

--

--

--

--

--

--

--

--

ERW & DA

ER

W

&

DA

ERW & DA

ERW & DA

ER

W

&

DA

ERW &

DA

ERW &

DA

ERW & DA

ERW & DA

O/

H

SIG

N

C.B.

DI

DI

SIGN

SIGN

C.B.

C.B.

C.B.

J.W.

J.W.

C.B.

N

PC

Sta 5

+00.0

0

5 67

89

PT

Sta 9

+31.7

6

5 +50 6 +50 7 +50 8 +50 9

65

75

ELEV. 72.30

-0.44% -0.26%

72.5

2

ELEV. 71.88

-0.26% -0.51%

70.9

2

P.V.I. STA. 7+10.00

P.V.I. STA. 5+50.00

95

I NTERSTATE

ISSUES:

COMMENTS:

9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes

Delaware Department of Transportation

JULY 28, 2003& KAHL

RUMMEL, KLEPPER

PLAN SCALE

0 25 10050

- Corrects vertical "dip" at approach to Christina Creek Bridge

lanes and ramp

- New barrier installed to provide better separation between through

- Existing inlets (2) need to be adjusted

ISSUE 1 - Vertical "Dip" I-95 N.B. On-Ramp

Option 1 - Adjust Vertical Profile

TO WILMIN

GTON

TO TOLL PLAZA

EXIST. R

/W

PLAN LEGEND

APPROXIMATE EXISTING RIGHT OF WAY

PROPOSED ROADWAY PAVEMENT

EXISTING ROADWAY PAVEMENT

REMOVE EXISITING PAVEMENT

PROPOSED OVERLAY

RAMP PROFILE

EXISTING GRADE

PROPOSED GRADE

BARRIER

CONSTRUCT

LIMIT OF RECONSTRUCTION

I-95 / SR 896 Interchange Improvements

Christina Creek Bridge

1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at

2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility

3. SB SR 896 - Weave between I-95 Ramps

4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896

5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95

10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance

SECTION A-A

EXISTING SLOPE

SHLD.

6’

3% 3%

VARIES (3%-6%)

SHOULDER SLOPE

(N.T.S.)

STA. 6+75

Iss1opt1.dgn

A

A

H: 1"=50’, V: 1"=5’

PROFILE SCALE: OFFSET BARRIER

CROSS SLOPE AND

IN RAMP/SHOULDER

IN GRADE MADE UP

NOTE: DIFFERENCE

SHLD. & LANES

EXISTING I-95

CONSTRUCT PCC BARRIER

CONCRETE ISLAND &

REMOVE EXISTING

(No longer under consideration)

7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting

WIDTH

LANE

EXIST.

MATCH

WIDTH

SHLDR.

EXIST.

MATCH

(No longer under consideration)

6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements

8. SB I-95 - Rutting at the Welsh Tract Road Bridge

CHRISTINA CREEK

I-95 SB

I-95 NB

Page 2: I-95 / SR 896 Interchange Improvementsbidcondocs.delaware.gov/DOT/DOT_15-1769I95and896Interchange... · Delaware Department of Transportation JULY 28, 2003 & KAHL ... AP R OX IM TE

C.B.

C.B.

SIGN

SIGN

DIDIDIDI

MH

SIGN

SIGN

C.B.

C.B.

C.B.

C.B.

C.B.

MH

C.B.

DI

SIGN

CONC

C.B.

DI

DI

DI

DI

SIGN

SIGN

DI

DI

DIDI

DI

DI

C.B.

DI

DIDI

C.B.

DI

DI

SIGN ASPH

POOLDECK

CONC DITCH

CO

NC

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

CO

NC

CONC

ASPH

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL

ASPH

CO

NC

CONC

CONC DITCH

CONC DITCH

DENSE TREES

C.B.

C.B.

C.B.

C.B.

C.B.

CHRIS

TIN

A RIV

ER

DENSE TREES

FO

FO

FO

C.B.

J.W.

S

C.B.

J.W.

EV

EV

EV

EV

S

--

--

--

--

ERW & DA

ER

W

&

DA

ERW

& DA

ERW & DA

PLAN LEGEND

APPROXIMATE EXISTING RIGHT OF WAY

PROPOSED ROADWAY PAVEMENT

EXISTING ROADWAY PAVEMENT

828384858687

PC

Sta 87

+4

2.1

1

88

89

90

PC

C

Sta 90+39.11

91

PCC Sta 9

1+40.18

92

93

PT Sta 93+59.18

94

PC Sta 94+92.5

6

95

96

PC

C

Sta 96+72.9

6

97

PCC Sta 97+87.8

4

98

99

PT St

a 99

+63.

84

100

101

102

103

104

CROSS SLOPE

MATCH EXISTING

REMOVE EXISITING PAVEMENT

CROSS SLOPE

MATCH EXISTING

6.2

%

EX.

EX.

5.6

%

EX.5.

1%

5.4%

EX.

EX.

5.5

%

5.1

%E

X.

5.1

%

EX.

2.8%

EX.

N

PROPOSED OVERLAY

SUPERELEVATION

BEGIN 5%

15’ LA

NE

12’ SHOULDER

DS=35 mph

SE=5.4%

R=600’

CURVE 1

DS=25 mph

SE=5.8%

R=240’

CURVE 2

DS=20 mph

SE=5.8%

R=150’

CURVE 3

DS=25 mph

SE=5.8%

R=300’

CURVE 5

DS=35 mph

SE=5.0%

R=700’

CURVE 6

896

TO TOLL PLAZA

TO WILMINGTON

Exist. R/W

95

I NTERSTATE

ISSUES:

COMMENTS:

9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes

Delaware Department of Transportation

JULY 28, 2003& KAHL

RUMMEL, KLEPPER

PLAN SCALE

0 25 10050

ISSUE 2 - SB I-95 Ramp Flat Grade

Christina Creek Bridge

1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at

2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility

3. SB SR 896 - Weave between I-95 Ramps

4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896

5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95

10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance

I-95 / SR 896 Interchange Improvements

5.8

%

SUPERELEVATION

END 5.8%

5.8

%

EX.

5.4

%

DS=20 mph

SE=5.8%

R=150’

CURVE 4

CROSS SLOPE

MATCH EXISTING

- Removes existing flat grade at location of previous ramp toll facility

- Provides improved roadway delineation with removal of excess pavement width

- Superelevation of 5.8% maintained between Curve 2 and Curve 5

- Existing ramp geometry not improved outside of reconstructed area

design speed

- Increase superelevation of Curves 2,3,4 and 5 to achieve minimum 20 mph

(No longer under consideration)

7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting

Iss2opt1.dgn

SUPERELEVATION

BEGIN 5.8%

- Reconstructs existing pavement for 800 ft. (150 ft. new and 650 ft. mill and overlay)

Option 1 - Improve S/E with Existing Geometry

(No longer under consideration)

6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements

8. SB I-95 - Rutting at the Welsh Tract Road Bridge

I-95 SB

I-95 NB

SR 896 N

B

SR 896 SB

CHRISTINA CREEK

Page 3: I-95 / SR 896 Interchange Improvementsbidcondocs.delaware.gov/DOT/DOT_15-1769I95and896Interchange... · Delaware Department of Transportation JULY 28, 2003 & KAHL ... AP R OX IM TE

RAMP

RAMPA/C

CONC

MH

SIGN

RAMP

CONC

CSW

RAMP

MH

POOLCONC

SIGN

SIG

N

F.H.

SIGN

MH

GUY

DECK

DECK

SIGN

C

SIGN

CONC

CONC

F.H.

SIGN

SIGN

CS

W

CS

W

C.B.

C.B.

C.B.

RIP-RAP

RIP-RAP

CO

NC

ASPH PARKING

C.B.

CONCASPH

ASPH

CONC

CONC

CONC

CONCASPH

ASPH

ASPH

SIGNSIGN

RIP-RAP

CONC

ASPH

O/H

SIGN

MH

CONC

ASPH

SIGN

SIGN

CONCASPH

ASPHCONC

ASPH

BRUSH

SIGN

SIGN

MH

CONC

ASPH

ASPH

CO

LL

EG

E

AV

EN

UE

SO

UT

H

DE - 896

C.B.

C.B.

C.B.

C.B.

I -

95

RAMP

CONCI - 95 RAMP

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

I - 95

RA

MP

CO

LL

EG

E

AV

EN

UE S

OU

TH

DE - 896

C.B.

SIGN

SIGN

SIGN

DIDIDIDI

MH

SIGN

SIGN

C.B.

C.B.

C.B.

C.B.

C.B.

MH

MH

C.B.

DI

SIGN

CONC

CONC

CONCCONC ASPH

ASPH

ASPH

ASPH

C.B.

SIGN

DI

DI

DI

DI

SIGN

SIGN

DI

DI

DIDI

DI

DI

C.B.

SIGN

DI

DIDI

C.B.

DI

DI

MH

MH

DI

DI

SIGN

SIGN

CONC

CONC

ASPH

ASPHASPH

ASPH

SIGN

CONC

ASPH

ASPH

SIGN

DI

SIGN

SIGN

POOLDECK

C.B.

C.B.

MH

CONC

ASPH

C.B.

RIP-RAP

C.B.

C.B.C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

CONC DITCH

CO

NC

CO

LLE

GE

AV

EN

UE S

OU

TH

NB

L

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

CO

NC

CONC

CO

NC

WALL

ASPH

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL

ASPH

CO

NC

CONC

CONC DITCH

CONC DITCH

DENSE TREES

DAM

CANOPY

TR

TR

TR

TR

TR

POOL

CANOPY

CA

NO

PY

CANOPY

CANOPY

TRANS

CONC

RIP-RAP

RIP-RAP

c

c

CONC

CONC

ASPH PARKING

UNPAVED PARKING

ASPH PARKING

ASPH PARKING

ASPH PARKING

CONC ASPH PARKING

ASPH PARKING

C.B.

CHRIS

TIN

A RIV

ER

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

CHRIS

TIN

A RIV

ER

DENSE TREES

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

DE - 986

ASPH PARKING

C.B.

C.B.

ASPH PARKING

ASPH PARKING

C.B.

CO

NC

C.B.

FO

FO

FO

C.B.

C.B.

J.W.

J.W.

J.W.

J.W.

J.W.

J.W.

J.W.

GMKR

MH

MH

MH

S

D

VENT

C.B.

J.W.

EV

EV

EV

EV

EV

G

S

PL

PL

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

ERW & DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW

& DA

ERW & DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

ERW &

DA

ERW &DA

ERW &DA

ERW &DA

ER

W

&D

A

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ERW &

DA

ERW &

DA

ERW & DA

ER

W

&

DA

ER

W

&

DA

ERW

& DA

ERW

& DA

ER

W

&

DA

ERW

& DA

ERW

& DA

ER

W

&

DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

--

--

--

ER

W

&

DA

PL

PL

PL

PL

C.B.

C.B.

O/

H

SIG

N

C.B.

MH

CONC

DI

DI

SIGN

SIGN

SIGN

BILLBOARD

AC

AC

AC

AC

AC

AC

CONC

C

C

C

C

CC

CONC

ASPH

RAMP

TANK

DECK

TANK

TANK

TANK

TANK

TANK

CONC

CONCCONC

TANK

TANK

TANKTANK

TANK

CONC

C.B.

GATE

CONC

C.B.

TANK

TR

TR

SIGN

C.B.

SIGN

MH

GATE

TANK

TRANS

CONC

MH

DI

DI

DI

DI

RAMP

92041

72.81

92061

106.88

92062

72.89

93041

63.26

93061

63.00

93062

64.10

93063

63.65

93064

91.14

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

BIL

LB

OA

RD

GATE

GATE

MH

MH

SIGN

SIGN

MH

MH

MH

MH

LAMPLAMP

LAMP

SIGNSIGN

GATE

GATE

C.B.

SIGN

SIGN

C.B.

TANK

MH

SIGN

SIGN

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

BIL

LB

OA

RD

GATE

TR

GATE

C.B.

C.B.

RIP-RAP

RIP-RAP

GATE

MH

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

SIGN

SIGN

BIL

LB

OA

RD

TR

GA

TE

GATE

F.H.

CONC

CONC

ASPH PARKING LOT

SIGN

CONC

MH

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

JOHN F.

KENNEDY MEMORIAL

HIGHWAY

JOHN F.

KENNEDY MEMORIAL

HIGHWAY

CONC

CH

AP

EL

ST

RE

ET

BROOKHILL DRIVE

DIRT PARKING

DIRT PARKING

TRAILER

ASPH PARKING

ASPH PARKING

CONC

ASPH PARKING

ASPH PARKING

CONC

RA

MP

TRAILER

TRAILER

DIRT PARKING

C

ASPH PARKING

DIRT P

ARKING

ASPH PARKING

CONC

CONC

ASPH PARKING

CS

W

ASPH

ASPH

CS

W

CS

W

TRANS GRAVEL

ASPH PARKING

ASPH

CONC

ASPH PARKING

ASPH

ASPH PARKING

GRAVEL

OPEN STORAGE

OPEN STORAGE

ASPH

ASPH

ASPH PARKINGCONC

ASPH

CONC

RAMP

A/

C

A/

C

A/

C

CO

NC

DIRT PARKING

FO

J.W.

J.W.

C.B.

40

45

PC

Sta 49+69.6

3

50

PRC St

a 4+0

1.81

5

PT St

a 7+4

4.8

4

POT

Sta

8+71.59

PO

T

Sta 10

+00.0

0

10

15

20

PC

Sta 24

+4

7.7

9

25

30

35

PC

C

Sta 35

+00.0

0

40

PT Sta 40+63.5

0PC Sta 44+84.6

0

45

N

PLAN LEGEND

896

DS=30 mph

SE=6.0%

R=290’

EXIST. R/W

DS=30 mph

SE=6.0%

R=275’

TO TOLL PLAZA

DS=50 mph

SE=6.0%

R=835’

EXIST. R

/W

EXIST. R/W

TAPER LENGTH300’

TWO-LANE E

XIT2500’

EXIST. R/W

TO WILMIN

GTON

95

I NTERSTATE

PR

C

Sta 1+00.0

0

TAPER

150’

DS=70 mph

SE=3.8%

R=4932’

TAPER300

JULY 28, 2003& KAHL

RUMMEL, KLEPPER

ISSUES:

COMMENTS:

Option 1 - Eliminate SB I-95 to SB 896 Loop Ramp

DECELERATION LENGTH600’

DECELERATION L

ENGTH130

0’

R=610’(EXIST.)

SE=6.0%

DS=45 mph

AD

B B

F

F

CC

I-95 / SR 896 Interchange Improvements

- Eliminates SB SR 896 weave between I-95 ramps

at previous toll facility (Issue 2)

- Eliminates SB I-95 ramp to SB SR 896 and eliminates flat grade

ISSUE 3 - SB SR 896 Weave

Diamond Interchange

clear before stacking onto deceleration lane

Spillback detectors could be added to ramp to allow vehicles to

- Provides over 800 feet of three lane storage capacity off of I-95.

this would increase the project limits

- A barrier could be added to separate ramp queue from I-95. However,

- Improves the geometry of the SB I-95 to NB SR 896 off-ramp

9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes

Christina Creek Bridge

1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at

2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility

3. SB SR 896 - Weave between I-95 Ramps

4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896

5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95

8. SB I-95 - Rutting at the Welsh Tract Road Bridge

10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance

(No longer under consideration)

6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements

(No longer under consideration)

7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting

intersection on SR 896 that operates at LOS E

- Improves SB I-95 mainline operations, but creates a new signalized

- New signal will provide gaps for NB I-95 to NB SR 896 ramp

- New signal provides a phase for NB SR 896 to SB I-95 movement

2015 PM PEAK

NO BUILD PROPOSED

MAINLINE

INTERSECTION

2015 PM PEAK

NO BUILD PROPOSED

N/A

2015 PM PEAK

NO BUILD PROPOSED

WEAVE

N/A

2015 PM PEAK

NO BUILD PROPOSED

DIVERGE

N/A

2015 PM PEAK

NO BUILD PROPOSED

DIVERGE

2015 PM PEAK

NO BUILD PROPOSED

MAINLINE

E

APPROXIMATE EXISTING RIGHT OF WAY

PROPOSED ROADWAY PAVEMENT

EXISTING ROADWAY PAVEMENT

REMOVE EXISITING PAVEMENT

PROPOSED OVERLAY

RR TR

AC

K

REMOVED

TO BE

BRIDGE

EXIST.

CH

APEL STR

EETNEW SIGNAL

BRIDGE

EXISTING

WIDEN SIGN

OVERHEAD

REPLACE

INDUSTRIAL PARK

DIAMOND STREET

BRIDGE

EXISTING

WIDEN

Delaware Department of Transportation

PLAN SCALE

0 50 100 200

Iss3opt1.dgn

BRIDGE

EXISTING

WIDEN

BRIDGE

EXISTING

WIDEN

PIKE

BALTIMORE

TO OLD

3RD LANE

CONSTRUCT

SR 896 N

B

SR 896 SB

I-95 SB

I-95 NB

CHRISTINA CREEK

PARK

IRON HILL

Page 4: I-95 / SR 896 Interchange Improvementsbidcondocs.delaware.gov/DOT/DOT_15-1769I95and896Interchange... · Delaware Department of Transportation JULY 28, 2003 & KAHL ... AP R OX IM TE

CONCASPH CONC

CONC

CONCASPH

ASPH

ASPH

SIGNSIGN

MH

CONC

ASPH

SIGN

SIGN

ASPH

BRUSH

MH

CONC

ASPH

ASPH

I -

95

RAMP

CONCI - 95 RAMP

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

I - 95

RA

MP

CO

LL

EG

E

AV

EN

UE S

OU

TH

DE - 896

SIGN

SIGN

SIGN

DIDI

MH

C.B.

DI

SIGN

CONC

CONC

CONCCONC ASPH

ASPH

ASPH

ASPH

C.B.

DI

DI DI

DI

DIDI

C.B.

DI

DI

MH

MH

DI

DI

SIGN

SIGN

CONC

CONC

ASPH

ASPHASPH

ASPH

SIGN

CONC

ASPH

ASPH

SIGN

DI

SIGN

CONC DITCH

CO

NC

CO

LLE

GE

AV

EN

UE S

OU

TH

NB

L

CONC

CO

NC

WALL

ASPH

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL

ASPH

CO

NC

C.B.

J.W.

J.W.

GMKR

MH

VENT

EV

G

--

--

--

--

ER

W

&

DA

ERW &

DA

ERW

& DA

ERW

& DA

ER

W

&

DA

ERW

& DA

N

PLAN LEGEND

APPROXIMATE EXISTING RIGHT OF WAY

PROPOSED ROADWAY PAVEMENT

EXISTING ROADWAY PAVEMENT

REMOVE EXISITING PAVEMENT

STOP

AHEAD

STOP

STOP

LEFT TURN

R=50’

R=500’

R=500’

1’ offset)

offset +

(12’ Lane + 1’

Total Width 14’

2’

8’

R=150’

R=150’

R=50’

PROPOSED OVERLAY

2’ MEDIAN CURB

2’ MEDIAN CURB

15’ L

ANE

10’ S

HOULDER

4’ SHOULDER

896

Iron Hill Park

TO WILMINGTON

95

I NTERSTATE

ISSUES:

COMMENTS:

Delaware Department of Transportation

JULY 28, 2003& KAHL

RUMMEL, KLEPPER

PLAN SCALE

0 25 10050

ISSUE 4 - Left Turn Onto NB SR 896

I-95 / SR 896 Interchange Improvements

Christina Creek Bridge

1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at

2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility

3. SB SR 896 - Weave between I-95 Ramps

4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896

5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95

of two stage condition

- Delineators could be added to channelizing island to enhance visibility

- Improved signing along ramp to better identify left turn condition

- Provides better lane width definition along approach leg of ramp

Signal Warrant

- Signal Warrant Analysis was performed in August 2002

not be a substantial reason to justify signal installation

Since the intersection does not meet any of the other warrants, Warrant 6 may

- Signal Warrant 6 - Coordinated Signal System was the only warrant met.

the intersection

to the intersection and of angle collisions involving left turns from

- Recent accident history of rear-end collisions on the weaving segment prior

Eliminate Ramp

movement:

- FHWA recommended the following process to remove the NB I-95 to NB SR 896 Ramp

- Full report should be prepared and submitted to Delaware FHWA Office

9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes

8. SB I-95 - Rutting at the Welsh Tract Road Bridge

10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance

(No longer under consideration)

6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements

(No longer under consideration)

7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting

Option 1 - Provide Left Turn Channelization

allowing for a two-stage gap acceptance

- Improves left turn channelization and separation from NB SR 896

be inadequate when there is traffic in the auxiliary lane (NB I-95 loop ramp)

north (oncoming SB SR 896 through traffic) is not improved and may

- Sight distance for vehicles stopped at the end of the ramp looking

AM; 15 vehicles PM)

- Relatively low volume of vehicles turning left from the ramp (9 vehicles

operates at LOS E during the AM peak and LOS F during the PM peak

- Capacity Analysis indicated that the left turn from the unsignalized intersection

- There was one reported fatality involving an accident with a left turning vehicle

redesign of the interchange

- Recommendations included geometric improvements at the intersection and/or a

Tuckers Association

- Issue should be presented to local MPO, the public and possibly the National

- Delaware FHWA would take issue to FHWA Headquarters and possibly AASHTO

safety issues

- Concern of the national implications created by closing a ramp due to

Iss4opt1.dgn

finding an alternate solution for the ramp

- FHWA has suggested gaining approval may be difficult. Therefore we recommend

(0

MP

H to 35

MP

H)

260’

the existing bridge

- Can extend median acceleration lane to provide additional length without widening

I-95 NB

SR 896 SB

SR 896 N

B

Exist. R/W

Page 5: I-95 / SR 896 Interchange Improvementsbidcondocs.delaware.gov/DOT/DOT_15-1769I95and896Interchange... · Delaware Department of Transportation JULY 28, 2003 & KAHL ... AP R OX IM TE

RAMP

RAMPA/C

CONC

MH

SIGN

RAMP

CONC

CSW

RAMP

MH

POOLCONC

SIGN

SIG

N

F.H.

SIGN

MH

GUY

DECK

DECK

SIGN

C

SIGN

CONC

CONC

F.H.

SIGN

SIGN

CS

W

CS

W

C.B.

C.B.

C.B.

RIP-RAP

RIP-RAP

CO

NC

ASPH PARKING

C.B.

CONCASPH

ASPH

CONC

CONC

CONC

CONCASPH

ASPH

ASPH

SIGNSIGN

RIP-RAP

CONC

ASPH

O/H

SIGN

MH

CONC

ASPH

SIGN

SIGN

CONCASPH

ASPHCONC

ASPH

BRUSH

SIGN

SIGN

MH

CONC

ASPH

ASPH

CO

LL

EG

E

AV

EN

UE

SO

UT

H

DE - 896

C.B.

C.B.

C.B.

C.B.

I -

95

RAMP

CONCI - 95 RAMP

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

I - 95

RA

MP

CO

LL

EG

E

AV

EN

UE S

OU

TH

DE - 896

C.B.

SIGN

SIGN

SIGN

DIDIDIDI

MH

SIGN

SIGN

C.B.

C.B.

C.B.

C.B.

C.B.

MH

MH

C.B.

DI

SIGN

CONC

CONC

CONCCONC ASPH

ASPH

ASPH

ASPH

C.B.

SIGN

DI

DI

DI

DI

SIGN

SIGN

DI

DI

DIDI

DI

DI

C.B.

SIGN

DI

DIDI

C.B.

DI

DI

MH

MH

DI

DI

SIGN

SIGN

CONC

CONC

ASPH

ASPHASPH

ASPH

SIGN

CONC

ASPH

ASPH

SIGN

DI

SIGN

SIGN

POOLDECK

C.B.

C.B.

MH

CONC

ASPH

C.B.

RIP-RAP

C.B.

C.B.C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

CONC DITCH

CO

NC

CO

LLE

GE

AV

EN

UE S

OU

TH

NB

L

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

CO

NC

CONC

CO

NC

WALL

ASPH

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL

ASPH

CO

NC

CONC

CONC DITCH

CONC DITCH

DENSE TREES

DAM

CANOPY

TR

TR

TR

TR

TR

POOL

CANOPY

CA

NO

PY

CANOPY

CANOPY

TRANS

CONC

RIP-RAP

RIP-RAP

c

c

CONC

CONC

ASPH PARKING

UNPAVED PARKING

ASPH PARKING

ASPH PARKING

ASPH PARKING

CONC ASPH PARKING

ASPH PARKING

C.B.

CHRIS

TIN

A RIV

ER

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

CHRIS

TIN

A RIV

ER

DENSE TREES

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

DE - 986

ASPH PARKING

C.B.

C.B.

ASPH PARKING

ASPH PARKING

C.B.

CO

NC

C.B.

FO

FO

FO

C.B.

C.B.

J.W.

J.W.

J.W.

J.W.

J.W.

J.W.

J.W.

GMKR

MH

MH

MH

S

D

VENT

C.B.

J.W.

EV

EV

EV

EV

EV

G

S

N

PL

PL

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

ERW & DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW

& DA

ERW & DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

ERW &

DA

ERW &DA

ERW &DA

ERW &DA

ER

W

&D

A

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ERW &

DA

ERW &

DA

ERW & DA

ER

W

&

DA

ER

W

&

DA

ERW

& DA

ERW

& DA

ER

W

&

DA

ERW

& DA

ERW

& DA

ER

W

&

DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

--

--

--

ER

W

&

DA

PL

PL

PL

PL

C.B.

C.B.

O/

H

SIG

N

C.B.

MH

CONC

DI

DI

SIGN

SIGN

SIGN

BILLBOARD

AC

AC

AC

AC

AC

AC

CONC

C

C

C

C

CC

CONC

ASPH

RAMP

TANK

DECK

TANK

TANK

TANK

TANK

TANK

CONC

CONCCONC

TANK

TANK

TANKTANK

TANK

CONC

C.B.

GATE

CONC

C.B.

TANK

TR

TR

SIGN

C.B.

SIGN

MH

GATE

TANK

TRANS

CONC

MH

DI

DI

DI

DI

RAMP

92041

72.81

92061

106.88

92062

72.89

93041

63.26

93061

63.00

93062

64.10

93063

63.65

93064

91.14

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

BIL

LB

OA

RD

GATE

GATE

MH

MH

SIGN

SIGN

MH

MH

MH

MH

LAMPLAMP

LAMP

SIGNSIGN

GATE

GATE

C.B.

SIGN

SIGN

C.B.

TANK

MH

SIGN

SIGN

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

BIL

LB

OA

RD

GATE

TR

GATE

C.B.

C.B.

RIP-RAP

RIP-RAP

GATE

MH

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

SIGN

SIGN

BIL

LB

OA

RD

TR

GA

TE

GATE

F.H.

CONC

CONC

ASPH PARKING LOT

SIGN

CONC

MH

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

JOHN F.

KENNEDY MEMORIAL

HIGHWAY

JOHN F.

KENNEDY MEMORIAL

HIGHWAY

CONC

CH

AP

EL

ST

RE

ET

BROOKHILL DRIVE

DIRT PARKING

DIRT PARKING

TRAILER

ASPH PARKING

ASPH PARKING

CONC

ASPH PARKING

ASPH PARKING

CONC

RA

MP

TRAILER

TRAILER

DIRT PARKING

C

ASPH PARKING

DIRT P

ARKING

ASPH PARKING

CONC

CONC

ASPH PARKING

CS

W

ASPH

ASPH

CS

W

CS

W

TRANS GRAVEL

ASPH PARKING

ASPH

CONC

ASPH PARKING

ASPH

ASPH PARKING

GRAVEL

OPEN STORAGE

OPEN STORAGE

ASPH

ASPH

ASPH PARKINGCONC

ASPH

CONC

RAMP

A/

C

A/

C

A/

C

CO

NC

DIRT PARKING

FO

J.W.

J.W.

C.B.

Delaware Department of Transportation

JULY 28, 2003& KAHL

RUMMEL, KLEPPER

PLAN SCALE

0 50 100 200

N

15’ L

AN

E

15’ LANE

PLAN LEGEND

APPROXIMATE EXISTING RIGHT OF WAY

PROPOSED ROADWAY PAVEMENT

EXISTING ROADWAY PAVEMENT

REMOVE EXISITING PAVEMENT

PROPOSED OVERLAY

TAPER600

896

ISSUES:

COMMENTS:

9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes

95

I NTERSTATE

AT ABUTMENT

MAY BE REQUIRED

RETAINING WALL

TO TOLL PLAZA

DS=30 mph

SE=6.0%

R=275’

EXIST. R/W

DS=30 mph

SE=6.0%

R=300’

24’ - 2 LANES

R=14000’

SE=NC

DS=EXIS

T. R/W

EXIST. R

/W

BRIDGE

EXISTING

WIDEN

TO WILMIN

GTON

SINGLE L

ANE1000’

TWO LANE DROP250

0’

TAPER LENGTH300’

TWO LANES600’

ACCELERATION LENGTH1400’

POT Sta 20+00.00

20

25

PC Sta 2

5+31.88

30

PT

Sta 30

+38.7

6

PO

T

Sta 31+62.0

0

ISSUE 5 - NB I-95 Acceleration Lane

Option 1 - Combine Ramps

barrier separation , auxiliary lane and shoulder

- Provides desirable acceleration and lane drop lengths by extending

- Corrects vertical "dip" at approach to Christina Creek Bridge

- Reduced shoulder for 25(+/-) ft could prevent widening of Christina Creek Bridge

DS=25 mph

SE=6.0%

R=200’ (EXIST)

R=3000’

SE=

DS=

DS=45 mph

SE=RC

R=6000’

R=5068’

SE=

DS=

A A

B N/A

F F

C B

CC

I-95 / SR 896 Interchange Improvements

Christina Creek Bridge

1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at

2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility

3. SB SR 896 - Weave between I-95 Ramps

4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896

5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95

10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance

NO BUILD PROPOSED

MERGE

NO BUILD PROPOSED

MERGENO BUILD PROPOSED

WEAVE

NO BUILD PROPOSED

MAINLINE

NO BUILD PROPOSED

MAINLINE

one conflict point on the mainline

- Combines both I-95 Northbound Ramps into single freeway entrance, eliminating

- Shifts ramp location under SR 896 overpass between south abutment and pier

than 2,250-2,400 pc/h through the merge

- The HCM indicates it is unlikely that two-lane on-ramps can accommodate more

Iss5opt1.dgn

(No longer under consideration)

7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting

2015 PM PEAK

2015 PM PEAK

2015 PM PEAK

2015 PM PEAK

2015 PM PEAK

- Merging volume is within 50 vehicles of capacity (2015)

- The two-lane ramp will have 4,090 pc/h in design year (2015)

(No longer under consideration)

6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements

8. SB I-95 - Rutting at the Welsh Tract Road Bridge

CHRISTINA CREEK

SR 896 N

B

SR 896 SB

I-95 NB

I-95 SB

PARK

IRON HILL

INDUSTRIAL PARK

DIAMOND STREET

RR TR

AC

K

CH

APEL STR

EET

BRIDGE

EXISTING

WIDEN

BARRIER

CONSTRUCT

BRIDGE

EXISTING

WIDEN

PO

T Sta 70+00.0

0

70

PC Sta 73+85.0

0

75

PCC Sta 77+38.0

0

PT

Sta 7

9+5

6.9

1

80 85

PC

Sta 8

6+05.4

3

90

PC

C

Sta 93

+91.5

1

95

PR

C

Sta 96

+14.4

8

PR

C

Sta 98

+29.8

3

100

PT

Sta 10

1+74.8

6

105

110

115

120

PO

T

Sta 12

3+29.8

3

Page 6: I-95 / SR 896 Interchange Improvementsbidcondocs.delaware.gov/DOT/DOT_15-1769I95and896Interchange... · Delaware Department of Transportation JULY 28, 2003 & KAHL ... AP R OX IM TE

SIGN

MH

GUY

DECK

DECK

SIGN

C

SIGN

CONC

C.B.

C.B.

C.B.

RIP-RAP

RIP-RAP

CONCASPH CONC

CONC

CONCASPH

ASPH

ASPH

SIGNSIGN

MH

CONC

ASPH

SIGN

SIGN

ASPH

BRUSH

MH

CONC

ASPH

ASPH

I -

95

RAMP

CONCI - 95 RAMP

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

I - 95

RA

MP

CO

LL

EG

E

AV

EN

UE S

OU

TH

DE - 896

SIGN

SIGN

SIGN

DIDIDIDI

MH

SIGN

SIGN

C.B.

C.B.

C.B.

C.B.

C.B.

MH

MH

C.B.

DI

SIGN

CONC

CONC

CONCCONC ASPH

ASPH

ASPH

ASPH

C.B.

SIGN

DI

DI

DI

DI

SIGN

SIGN

DI

DI

DIDI

DI

DI

C.B.

SIGN

DI

DIDI

C.B.

DI

DI

MH

MH

DI

DI

SIGN

SIGN

CONC

CONC

ASPH

ASPHASPH

ASPH

SIGN

CONC

ASPH

ASPH

SIGN

DI

SIGN

SIGN

POOLDECK

C.B.

C.B.

MH

CONC

ASPH

C.B.

RIP-RAP

C.B.

C.B.C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

CONC DITCH

CO

NC

CO

LLE

GE

AV

EN

UE S

OU

TH

NB

L

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

CO

NC

CONC

CO

NC

WALL

ASPH

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL

ASPH

CO

NC

CONC

CONC DITCH

CONC DITCH

DENSE TREES

DAM

CANOPY

CA

NO

PY

TRANS

RIP-RAP

RIP-RAP

CONC ASPH PARKING

ASPH PARKING

C.B.

CHRIS

TIN

A RIV

ER

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

CHRIS

TIN

A RIV

ER

DENSE TREES

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

DE - 986

C.B.

CO

NC

C.B.

FO

FO

FO

C.B.

C.B.

J.W.

J.W.

J.W.

GMKR

MH

S

VENT

C.B.

J.W.

EV

EV

EV

EV

G

S

PL

PL

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

ER

W

&

DA

ERW & DA

ERW & DA

ERW

& DA

ERW & DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

ERW &

DA

ERW &DA

ERW &DA

ERW &DA

ER

W

&D

A

ER

W

&

DA

ER

W

&

DA

ERW &

DA

ERW &

DA

ER

W

&

DA

ER

W

&

DA

ERW

& DA

ERW

& DA

ER

W

&

DA

ERW

& DA

ERW & DA

ERW & DA

ERW & DA

--

--

ER

W

&

DA

PL

PL

PL

PL

O/

H

SIG

N

C.B.

MH

CONC

DI

DI

SIGN

SIGN

SIGN

BILLBOARD

AC

AC

AC

AC

AC

AC

CONC

C

C

C

C

CC

CONC

ASPH

RAMP

TANK

DECK

TANK

TANK

TANK

TANK

TANK

CONC

CONCCONC

TANK

TANK

TANKTANK

TANK

CONC

C.B.

GATE

CONC

C.B.

TANK

TR

TR

SIGN

C.B.

SIGN

MH

GATE

TANK

TRANS

CONC

MH

DI

DI

DI

DI

RAMP

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

BIL

LB

OA

RD

GATE

ASPH PARKING

OPEN STORAGE

OPEN STORAGE

ASPH

ASPH

ASPH PARKING

A/

C

A/

C

A/

C

CO

NC

FO

J.W.

J.W.

C.B.

PC

Sta 10

+00.0

0

10

15

PC

C

Sta 18

+91.6

2

20

PC

C

Sta 21+

88.3

1

25

PC

C Sta 28+27.7

4

30

PT St

a 31

+19.

58

PLAN LEGEND

APPROXIMATE EXISTING RIGHT OF WAY

PROPOSED ROADWAY PAVEMENT

EXISTING ROADWAY PAVEMENT

REMOVE EXISITING PAVEMENT

PROPOSED OVERLAY

N

896

DS=50 mph

SE=6.0%

R=835’

DS=60 mph

SE=6.0%

R=1500’

DS=50 mph

SE=5.9%

R=1000’

EXIST.100’

95

I NTERSTATE

EXIST. R/W

EXIST. R/W

EXIST. R

/W

TO TOLL PLAZA

TO WIL

MINGTON

EXIST. R/W

RAMPA/C

CONC

MH

POOLCONC

CS

W

CO

NC

C.B.

CANOPY

TR

c

c

CONC

ASPH PARKING

Delaware Department of Transportation

JULY 28, 2003& KAHL

RUMMEL, KLEPPER

PLAN SCALE

0 50 100 200

ISSUES:

COMMENTS:

ISSUE 10 - SB I-95 Ramp Geometry

- Improves the Geometry of the existing SB I-95 ramp onto NB SR 896

EXISTING DECELARATION LENGTH790’

I-95 / SR 896 Interchange Improvements

9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes

Christina Creek Bridge

1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at

2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility

3. SB SR 896 - Weave between I-95 Ramps

4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896

5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95

10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance

(No longer under consideration)

7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting

- Increases merging length onto NB SR 896 by 75 ft

Option 1 - Improve Ramp Geometry

- Improved ramp geometry should improve merge condition onto NB SR 896

this area

- Moves ramp gore closer to SB I-95 loop ramp. Vehicles queue onto shoulder in

(No longer under consideration)

6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements

8. SB I-95 - Rutting at the Welsh Tract Road Bridge

Iss10opt1.dgn

INDUSTRIAL PARK

DIAMOND STREET

PARK

IRON HILL

I-95 NB

I-95 SB

SR 896 SB

SR 896 N

B

CHRISTINA CREEK

Page 7: I-95 / SR 896 Interchange Improvementsbidcondocs.delaware.gov/DOT/DOT_15-1769I95and896Interchange... · Delaware Department of Transportation JULY 28, 2003 & KAHL ... AP R OX IM TE

C.B.

C.B.

SIGN

SIGN

DIDIDIDI

MH

SIGN

SIGN

C.B.

C.B.

C.B.

C.B.

C.B.

MH

C.B.

DI

SIGN

CONC

C.B.

DI

DI

DI

DI

SIGN

SIGN

DI

DI

DIDI

DI

DI

C.B.

DI

DIDI

C.B.

DI

DI

SIGN ASPH

SIGN

POOLDECK

CONC DITCH

CO

NC

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

CO

NC

CONC

ASPH

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL

ASPH

CO

NC

CONC

CONC DITCH

CONC DITCH

DENSE TREES

C.B.

C.B.

C.B.

C.B.

C.B.

CHRIS

TIN

A RIV

ER

DENSE TREES

FO

FO

FO

C.B.

J.W.

S

C.B.

J.W.

EV

EV

EV

EV

S

--

--

--

--

ERW & DA

ER

W

&

DA

ERW

& DA

ERW & DA

92041

72.81

N

PLAN LEGEND

APPROXIMATE EXISTING RIGHT OF WAY

PROPOSED ROADWAY PAVEMENT

EXISTING ROADWAY PAVEMENT

PROPOSED OVERLAY

REMOVE EXISITING PAVEMENT

81828384858687

PC

Sta 87

+4

2.1

1

88

PC

C

Sta 88

+63.7

2

89

90

PC

C Sta 90+06.7

2

91

92

93

94

95 96

97

PCC Sta 97+2

2.5

4

98

PT St

a 98

+93.

54

99

100

101

102

103

104

POT St

a 10

4+27.

77

12’ SHOULDER

15’ LANE

896

DS = 25 mph

SE = 6.0%

R = 210’

DS = 35 mph

SE = 6.0%

R = 400’

DS = 35 mph

SE = 5.4%

R = 600’ (Exist.)

TO WILMINGTON

TO TOLL PLAZA

Exist. R/W

DS = 35 mph

SE = 5.0%

R = 700 (Exist.)

Exist. R/W

95

I NTERSTATE

Delaware Department of Transportation

JULY 28, 2003& KAHL

RUMMEL, KLEPPER

PLAN SCALE

0 25 100

ISSUES:

COMMENTS:

9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes

ISSUE 2 - SB I-95 Ramp Flat Grade

I-95 / SR 896 Interchange Improvements

2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility

3. SB SR 896 - Weave between I-95 Ramps

4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896

5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95

10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance

Christina Creek Bridge

1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at

- Reconstructs existing loop ramp

- Removes existing flat grade at location of previous ramp toll facility

(Existing - 10 mph; Option 1 - 20 mph; Option 2 - 25 mph)

- Improves ramp geometry and design speed

GUTTER

CURB AND

PROPOSED

Iss2opt2.dgn

(No longer under consideration)

7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting

Option 2 - Improve Ramp Alignment

50

(No longer under consideration)

6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements

8. SB I-95 - Rutting at the Welsh Tract Road Bridge

I-95 SB

I-95 NB

SR 896 N

B

SR 896 SB

CHRISTINA CREEK

Page 8: I-95 / SR 896 Interchange Improvementsbidcondocs.delaware.gov/DOT/DOT_15-1769I95and896Interchange... · Delaware Department of Transportation JULY 28, 2003 & KAHL ... AP R OX IM TE

RAMP

RAMPA/C

CONC

MH

SIGN

RAMP

CONC

CSW

RAMP

MH

POOLCONC

SIGN

SIG

N

F.H.

SIGN

MH

GUY

DECK

DECK

SIGN

C

SIGN

CONC

CONC

F.H.

SIGN

SIGN

CS

W

CS

W

C.B.

C.B.

C.B.

RIP-RAP

RIP-RAP

CO

NC

ASPH PARKING

C.B.

CONCASPH

ASPH

CONC

CONC

CONC

CONCASPH

ASPH

ASPH

SIGNSIGN

RIP-RAP

CONC

ASPH

O/H

SIGN

MH

CONC

ASPH

SIGN

SIGN

CONCASPH

ASPHCONC

ASPH

BRUSH

SIGN

SIGN

MH

CONC

ASPH

ASPH

CO

LL

EG

E

AV

EN

UE

SO

UT

H

DE - 896

C.B.

C.B.

C.B.

C.B.

I -

95

RAMP

CONCI - 95 RAMP

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

I - 95

RA

MP

CO

LL

EG

E

AV

EN

UE S

OU

TH

DE - 896

C.B.

SIGN

SIGN

SIGN

DIDIDIDI

MH

SIGN

SIGN

C.B.

C.B.

C.B.

C.B.

C.B.

MH

MH

C.B.

DI

SIGN

CONC

CONC

CONCCONC ASPH

ASPH

ASPH

ASPH

C.B.

SIGN

DI

DI

DI

DI

SIGN

SIGN

DI

DI

DIDI

DI

DI

C.B.

SIGN

DI

DIDI

C.B.

DI

DI

MH

MH

DI

DI

SIGN

SIGN

CONC

CONC

ASPH

ASPHASPH

ASPH

SIGN

CONC

ASPH

ASPH

SIGN

DI

SIGN

SIGN

POOLDECK

C.B.

C.B.

MH

CONC

ASPH

C.B.

RIP-RAP

C.B.

C.B.C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

CONC DITCH

CO

NC

CO

LLE

GE

AV

EN

UE S

OU

TH

NB

L

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

CO

NC

CONC

CO

NC

WALL

ASPH

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL

ASPH

CO

NC

CONC

CONC DITCH

CONC DITCH

DENSE TREES

DAM

CANOPY

TR

TR

TR

TR

TR

POOL

CANOPY

CA

NO

PY

CANOPY

CANOPY

TRANS

CONC

RIP-RAP

RIP-RAP

c

c

CONC

CONC

ASPH PARKING

UNPAVED PARKING

ASPH PARKING

ASPH PARKING

ASPH PARKING

CONC ASPH PARKING

ASPH PARKING

C.B.

CHRIS

TIN

A RIV

ER

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

CHRIS

TIN

A RIV

ER

DENSE TREES

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

DE - 986

ASPH PARKING

C.B.

C.B.

ASPH PARKING

ASPH PARKING

C.B.

CO

NC

C.B.

FO

FO

FO

C.B.

C.B.

J.W.

J.W.

J.W.

J.W.

J.W.

J.W.

J.W.

GMKR

MH

MH

MH

S

D

VENT

C.B.

J.W.

EV

EV

EV

EV

EV

G

S

PL

PL

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

ERW & DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW

& DA

ERW & DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

ERW &

DA

ERW &DA

ERW &DA

ERW &DA

ER

W

&D

A

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ERW &

DA

ERW &

DA

ERW & DA

ER

W

&

DA

ER

W

&

DA

ERW

& DA

ERW

& DA

ER

W

&

DA

ERW

& DA

ERW

& DA

ER

W

&

DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

--

--

--

ER

W

&

DA

PL

PL

PL

PL

C.B.

C.B.

O/

H

SIG

N

C.B.

MH

CONC

DI

DI

SIGN

SIGN

SIGN

BILLBOARD

AC

AC

AC

AC

AC

AC

CONC

C

C

C

C

CC

CONC

ASPH

RAMP

TANK

DECK

TANK

TANK

TANK

TANK

TANK

CONC

CONCCONC

TANK

TANK

TANKTANK

TANK

CONC

C.B.

GATE

CONC

C.B.

TANK

TR

TR

SIGN

C.B.

SIGN

MH

GATE

TANK

TRANS

CONC

MH

DI

DI

DI

DI

RAMP

92041

72.81

92061

106.88

92062

72.89

93041

63.26

93061

63.00

93062

64.10

93063

63.65

93064

91.14

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

BIL

LB

OA

RD

GATE

GATE

MH

MH

SIGN

SIGN

MH

MH

MH

MH

LAMPLAMP

LAMP

SIGNSIGN

GATE

GATE

C.B.

SIGN

SIGN

C.B.

TANK

MH

SIGN

SIGN

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

BIL

LB

OA

RD

GATE

TR

GATE

C.B.

C.B.

RIP-RAP

RIP-RAP

GATE

MH

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

SIGN

SIGN

BIL

LB

OA

RD

TR

GA

TE

GATE

F.H.

CONC

CONC

ASPH PARKING LOT

SIGN

CONC

MH

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

JOHN F.

KENNEDY MEMORIAL

HIGHWAY

JOHN F.

KENNEDY MEMORIAL

HIGHWAY

CONC

CH

AP

EL

ST

RE

ET

BROOKHILL DRIVE

DIRT PARKING

DIRT PARKING

TRAILER

ASPH PARKING

ASPH PARKING

CONC

ASPH PARKING

ASPH PARKING

CONC

RA

MP

TRAILER

TRAILER

DIRT PARKING

C

ASPH PARKING

DIRT P

ARKING

ASPH PARKING

CONC

CONC

ASPH PARKING

CS

W

ASPH

ASPH

CS

W

CS

W

TRANS GRAVEL

ASPH PARKING

ASPH

CONC

ASPH PARKING

ASPH

ASPH PARKING

GRAVEL

OPEN STORAGE

OPEN STORAGE

ASPH

ASPH

ASPH PARKINGCONC

ASPH

CONC

RAMP

A/

C

A/

C

A/

C

CO

NC

DIRT PARKING

FO

J.W.

J.W.

C.B.

N

PLAN LEGEND

APPROXIMATE EXISTING RIGHT OF WAY

PROPOSED ROADWAY PAVEMENT

EXISTING ROADWAY PAVEMENT

REMOVE EXISITING PAVEMENT

PROPOSED OVERLAY896

REMOVED

TO BE

BRIDGE

EXIST. EXIST. R/W

TO TOLL PLAZA

BRIDGE

EXISTING

WIDEN

SIGN

OVERHEAD

REPLACE

EXIST. R

/W

EXIST. R/W

TAPER LENGTH300’

TWO-LANE E

XIT2500’

EXIST. R/W

TO WILMIN

GTON

BRIDGE

EXISTING

WIDEN

95

I NTERSTATE

TAPER300

Delaware Department of Transportation

JULY 28, 2003& KAHL

RUMMEL, KLEPPER

PLAN SCALE

0 50 100 200

ISSUES:

COMMENTS:

DECELERATION L

ENGTH600

DECELERATION L

ENGTH130

0’

AD

B B

F

F

CC

I-95 / SR 896 Interchange Improvements

ISSUE 3 - SB SR 896 Weave

- Improves the geometry of the SB I-95 to NB SR 896 off-ramp

9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes

Christina Creek Bridge

1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at

2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility

3. SB SR 896 - Weave between I-95 Ramps

4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896

5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95

8. SB I-95 - Rutting at the Welsh Tract Road Bridge

10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance

(No longer under consideration)

6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements

(No longer under consideration)

7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting

intersection on SR 896 that operates at LOS D

- Improves SB I-95 mainline operations, but creates a new signalized

- New signal will provide gaps for NB I-95 to NB SR 896 ramp

- New signal provides a phase for NB SR 896 to SB I-95 movement

2015 PM PEAK

NO BUILD PROPOSED

MAINLINE

INTERSECTION

2015 PM PEAK

NO BUILD PROPOSED

N/A

2015 PM PEAK

NO BUILD PROPOSED

WEAVE

N/A

2015 PM PEAK

NO BUILD PROPOSED

DIVERGE

N/A

2015 PM PEAK

NO BUILD PROPOSED

DIVERGE

2015 PM PEAK

NO BUILD PROPOSED

MAINLINE

Iss3opt2.dgn

BRIDGE

EXISTING

WIDEN

BRIDGE

EXISTING

WIDEN

D

PIKE

BALTIMORE

TO OLD

3RD LANE

CONSTRUCT

PC

Sta 20

+00.0

0

20

PC

C

Sta 23

+02.3

0

25

30

PRC St

a 33

+64.

6835

PT St

a 37

+09.

40

POT

Sta

38+3

6.15

PO

T

Sta 9

+00.0

0

10

15

20

25

30

PC

Sta 30

+00.0

0

35

40

PR

C

Sta 4

0+52.5

3

PR

C

Sta 4

2+00.8

8

PT

Sta 4

3+3

9.2

7

4550

PC

Sta 5

3+64.8

3

55

PC

C

Sta 56

+02.3

1

PC

C Sta 57+01.21

60

PC

C Sta 61+

00.6

9

PT

Sta 63

+5

5.8

7

CURVE 4

R=350’

SE=6.0%

DS=30 mph

CURVE 3

R=190’

SE=6.0%

DS=25 mph

CURVE 1

R=650’

SE=6.0%

DS=45 mph

CURVE 2

R=380’

SE=6.0%

DS=35 mph

BARRIER

CONSTRUCT

BRIDGE

EXISTING

WIDEN

- Eliminates SB SR 896 weave between I-95 ramps due to metering by new signal

- Eliminates flat grade at previous toll facility (Issue 2)

- NB SR 896 is not controlled by signal (always green)

"PARTIAL"

NEW SIGNAL

- Provides over 2000 ft of two-lane storage capacity for SB I-95 to SB SR 896 Ramp

Option 2 - Combine SB I-95 Off Ramps

Construct Double Loop Ramp

I-95 NB

I-95 SB

CHRISTINA CREEK

SR 896 N

B

SR 896 SB

INDUSTRIAL PARK

DIAMOND STREET

RR TR

AC

K

CH

APEL STR

EET

PARK

IRON HILL

Page 9: I-95 / SR 896 Interchange Improvementsbidcondocs.delaware.gov/DOT/DOT_15-1769I95and896Interchange... · Delaware Department of Transportation JULY 28, 2003 & KAHL ... AP R OX IM TE

CONCASPH CONC

CONC

CONCASPH

ASPH

ASPH

SIGNSIGN

MH

CONC

ASPH

SIGN

SIGN

ASPH

BRUSH

MH

CONC

ASPH

ASPH

I -

95

RAMP

CONCI - 95 RAMP

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

I - 95

RA

MP

CO

LL

EG

E

AV

EN

UE S

OU

TH

DE - 896

SIGN

SIGN

SIGN

DIDI

MH

C.B.

DI

SIGN

CONC

CONC

CONCCONC ASPH

ASPH

ASPH

ASPH

C.B.

DI

DI DI

DI

DIDI

C.B.

DI

DI

MH

MH

DI

DI

SIGN

SIGN

CONC

CONC

ASPH

ASPHASPH

ASPH

SIGN

CONC

ASPH

ASPH

SIGN

DI

SIGN

CONC DITCH

CO

NC

CO

LLE

GE

AV

EN

UE S

OU

TH

NB

L

CONC

CO

NC

WALL

ASPH

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL

ASPH

CO

NC

C.B.

J.W.

J.W.

GMKR

MH

VENT

EV

G

--

--

--

--

ER

W

&

DA

ERW &

DA

ERW

& DA

ERW

& DA

ER

W

&

DA

ERW

& DA

N

PLAN LEGEND

APPROXIMATE EXISTING RIGHT OF WAY

PROPOSED ROADWAY PAVEMENT

EXISTING ROADWAY PAVEMENT

REMOVE EXISITING PAVEMENT

STOP

AHEAD

STOP

STOP

LEFT TURN

R=50’

R=500’

R=500’

1’ offset)

offset +

(12’ Lane + 1’

Total Width 14’

2’

8’

R=150’

R=150’

R=50’

PROPOSED OVERLAY

2’ MEDIAN CURB

2’ MEDIAN CURB

15’ L

ANE

10’ S

HOULDER

4’ SHOULDER

896

Iron Hill Park

Exist. R/W

TO WILMINGTON

95

I NTERSTATE

ISSUES:

COMMENTS:

Delaware Department of Transportation

JULY 28, 2003& KAHL

RUMMEL, KLEPPER

PLAN SCALE

0 25 10050

ISSUE 4 - Left Turn Onto NB SR 896

I-95 / SR 896 Interchange Improvements

Christina Creek Bridge

1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at

2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility

3. SB SR 896 - Weave between I-95 Ramps

4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896

5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95

of two stage condition

- Delineators could be added to channelizing island to enhance visibility

- Improved signing along ramp to better identify left turn condition

- Provides better lane width definition along approach leg of ramp

Signal Warrant

- Signal Warrant Analysis was performed in August 2002

not be a substantial reason to justify signal installation

Since the intersection does not meet any of the other warrants, Warrant 6 may

- Signal Warrant 6 - Coordinated Signal System was the only warrant met.

the intersection

to the intersection and of angle collisions involving left turns from

- Recent accident history of rear-end collisions on the weaving segment prior

Eliminate Ramp

movement:

- FHWA recommended the following process to remove the NB I-95 to NB SR 896 Ramp

- Full report should be prepared and submitted to Delaware FHWA Office

9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes

8. SB I-95 - Rutting at the Welsh Tract Road Bridge

10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance

(No longer under consideration)

6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements

(No longer under consideration)

7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting

Option 2 - Provide Left Turn Channelization

allowing for a two-stage gap acceptance

- Improves left turn channelization and separation from NB SR 896

be inadequate when there is traffic in the auxiliary lane (NB I-95 loop ramp)

north (oncoming SB SR 896 through traffic) is not improved and may

- Sight distance for vehicles stopped at the end of the ramp looking

AM; 15 vehicles PM)

- Relatively low volume of vehicles turning left from the ramp (9 vehicles

operates at LOS E during the AM peak and LOS F during the PM peak

- Capacity Analysis indicated that the left turn from the unsignalized intersection

- There was one reported fatality involving an accident with a left turning vehicle

redesign of the interchange

- Recommendations included geometric improvements at the intersection and/or a

Tuckers Association

- Issue should be presented to local MPO, the public and possibly the National

- Delaware FHWA would take issue to FHWA Headquarters and possibly AASHTO

safety issues

- Concern of the national implications created by closing a ramp due to

Iss4opt2.dgn

finding an alternate solution for the ramp

- FHWA has suggested gaining approval may be difficult. Therefore we recommend

(0

MP

H to 35

MP

H)

260’

the existing bridge

- Can extend median acceleration lane to provide additional length without widening

I-95 NB

SR 896 N

B

SR 896 SB

Page 10: I-95 / SR 896 Interchange Improvementsbidcondocs.delaware.gov/DOT/DOT_15-1769I95and896Interchange... · Delaware Department of Transportation JULY 28, 2003 & KAHL ... AP R OX IM TE

RAMP

RAMPA/C

CONC

MH

SIGN

RAMP

CONC

CSW

RAMP

MH

POOLCONC

SIGN

SIG

N

F.H.

SIGN

MH

GUY

DECK

DECK

SIGN

C

SIGN

CONC

CONC

F.H.

SIGN

SIGN

CS

W

CS

W

C.B.

C.B.

C.B.

RIP-RAP

RIP-RAP

CO

NC

ASPH PARKING

C.B.

CONCASPH

ASPH

CONC

CONC

CONC

CONCASPH

ASPH

ASPH

SIGNSIGN

RIP-RAP

CONC

ASPH

O/H

SIGN

MH

CONC

ASPH

SIGN

SIGN

CONCASPH

ASPHCONC

ASPH

BRUSH

SIGN

SIGN

MH

CONC

ASPH

ASPH

CO

LL

EG

E

AV

EN

UE

SO

UT

H

DE - 896

C.B.

C.B.

C.B.

C.B.

I -

95

RAMP

CONCI - 95 RAMP

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

I - 95

RA

MP

CO

LL

EG

E

AV

EN

UE S

OU

TH

DE - 896

C.B.

SIGN

SIGN

SIGN

DIDIDIDI

MH

SIGN

SIGN

C.B.

C.B.

C.B.

C.B.

C.B.

MH

MH

C.B.

DI

SIGN

CONC

CONC

CONCCONC ASPH

ASPH

ASPH

ASPH

C.B.

SIGN

DI

DI

DI

DI

SIGN

SIGN

DI

DI

DIDI

DI

DI

C.B.

SIGN

DI

DIDI

C.B.

DI

DI

MH

MH

DI

DI

SIGN

SIGN

CONC

CONC

ASPH

ASPHASPH

ASPH

SIGN

CONC

ASPH

ASPH

SIGN

DI

SIGN

SIGN

POOLDECK

C.B.

C.B.

MH

CONC

ASPH

C.B.

RIP-RAP

C.B.

C.B.C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

CONC DITCH

CO

NC

CO

LLE

GE

AV

EN

UE S

OU

TH

NB

L

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

CO

NC

CONC

CO

NC

WALL

ASPH

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL

ASPH

CO

NC

CONC

CONC DITCH

CONC DITCH

DENSE TREES

DAM

CANOPY

TR

TR

TR

TR

TR

POOL

CANOPY

CA

NO

PY

CANOPY

CANOPY

TRANS

CONC

RIP-RAP

RIP-RAP

c

c

CONC

CONC

ASPH PARKING

UNPAVED PARKING

ASPH PARKING

ASPH PARKING

ASPH PARKING

CONC ASPH PARKING

ASPH PARKING

C.B.

CHRIS

TIN

A RIV

ER

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

CHRIS

TIN

A RIV

ER

DENSE TREES

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

DE - 986

ASPH PARKING

C.B.

C.B.

ASPH PARKING

ASPH PARKING

C.B.

CO

NC

C.B.

FO

FO

FO

C.B.

C.B.

J.W.

J.W.

J.W.

J.W.

J.W.

J.W.

J.W.

GMKR

MH

MH

MH

S

D

VENT

C.B.

J.W.

EV

EV

EV

EV

EV

G

S

PL

PL

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

ERW & DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW

& DA

ERW & DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

ERW &

DA

ERW &DA

ERW &DA

ERW &DA

ER

W

&D

A

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ERW &

DA

ERW &

DA

ERW & DA

ER

W

&

DA

ER

W

&

DA

ERW

& DA

ERW

& DA

ER

W

&

DA

ERW

& DA

ERW

& DA

ER

W

&

DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

--

--

--

ER

W

&

DA

PL

PL

PL

PL

C.B.

C.B.

O/

H

SIG

N

C.B.

MH

CONC

DI

DI

SIGN

SIGN

SIGN

BILLBOARD

AC

AC

AC

AC

AC

AC

CONC

C

C

C

C

CC

CONC

ASPH

RAMP

TANK

DECK

TANK

TANK

TANK

TANK

TANK

CONC

CONCCONC

TANK

TANK

TANKTANK

TANK

CONC

C.B.

GATE

CONC

C.B.

TANK

TR

TR

SIGN

C.B.

SIGN

MH

GATE

TANK

TRANS

CONC

MH

DI

DI

DI

DI

RAMP

92041

72.81

92061

106.88

92062

72.89

93041

63.26

93061

63.00

93062

64.10

93063

63.65

93064

91.14

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

BIL

LB

OA

RD

GATE

GATE

MH

MH

SIGN

SIGN

MH

MH

MH

MH

LAMPLAMP

LAMP

SIGNSIGN

GATE

GATE

C.B.

SIGN

SIGN

C.B.

TANK

MH

SIGN

SIGN

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

BIL

LB

OA

RD

GATE

TR

GATE

C.B.

C.B.

RIP-RAP

RIP-RAP

GATE

MH

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

SIGN

SIGN

BIL

LB

OA

RD

TR

GA

TE

GATE

F.H.

CONC

CONC

ASPH PARKING LOT

SIGN

CONC

MH

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

JOHN F.

KENNEDY MEMORIAL

HIGHWAY

JOHN F.

KENNEDY MEMORIAL

HIGHWAY

CONC

CH

AP

EL

ST

RE

ET

BROOKHILL DRIVE

DIRT PARKING

DIRT PARKING

TRAILER

ASPH PARKING

ASPH PARKING

CONC

ASPH PARKING

ASPH PARKING

CONC

RA

MP

TRAILER

TRAILER

DIRT PARKING

C

ASPH PARKING

DIRT P

ARKING

ASPH PARKING

CONC

CONC

ASPH PARKING

CS

W

ASPH

ASPH

CS

W

CS

W

TRANS GRAVEL

ASPH PARKING

ASPH

CONC

ASPH PARKING

ASPH

ASPH PARKING

GRAVEL

OPEN STORAGE

OPEN STORAGE

ASPH

ASPH

ASPH PARKINGCONC

ASPH

CONC

RAMP

A/

C

A/

C

A/

C

CO

NC

DIRT PARKING

FO

J.W.

J.W.

C.B.

PO

T Sta 70+00.0

0

70

PC Sta 71+

65.3

0

PCC Sta 7

4+9

4.3

0

75

PC

C

Sta 77

+39.10

PT

Sta 7

8+5

5.1

0

80 85

PC

Sta 8

6+69.4

5

90

95

PT

Sta 98

+75.1

9

N

PLAN LEGEND

APPROXIMATE EXISTING RIGHT OF WAY

PROPOSED ROADWAY PAVEMENT

EXISTING ROADWAY PAVEMENT

REMOVE EXISITING PAVEMENT

PROPOSED OVERLAY

896

DS= 70 mph

SE= NC

R = 14000’

CHRISTINA CREEK

95

I NTERSTATE

EXIST. R/W

EXIST. R

/W

EXIST. R

/W

TO WILMIN

GTON

TO TOLL PLAZA

ACCELARATION LENGTH

1420’

TAPER LENGTH600’

Delaware Department of Transportation

JULY 28, 2003& KAHL

RUMMEL, KLEPPER

PLAN SCALE

0 50 100 200

ISSUES:

COMMENTS:

9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes

ISSUE 5 - NB I-95 Acceleration Lane

DS=

SE=

R=200’(Exist)

DS=

SE=

R=340’(Exist)

DS=

SE=

R=600’(Exist)

DS=

SE=

R=5000’(Exist)

DS= 60 mph

SE= 3.8%

R=4000’

R=5068’(Exist)

SE= 3.7%

DS= 70 mph

I-95 / SR 896 Interchange Improvements

Christina Creek Bridge

1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at

2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility

3. SB SR 896 - Weave between I-95 Ramps

4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896

5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95

8. SB I-95 - Rutting at the Welsh Tract Road Bridge

10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance

PC

Sta 2

0+00.0

0

20

PC

C

Sta 23

+00.0

0

25

30

PR

C

Sta 31+

94.2

0

35 PT

Sta 37

+61.8

5

40

45

PO

T

Sta 4

7+61.

85

Option 2 - Extend Existing Acceleration Lane

(No longer under consideration)

6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements

(No longer under consideration)

7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting

- Corrects vertical "dip" at approach to Christina Creek Bridge

- Construct barrier between ramps

Iss5opt2.dgn

BARRIER

CONSTRUCT

TAPER LENGTH600’

- Longer merge - better density and lane use along I-95

(25 mph to 70 mph)

- Extends existing acceleration lane length to AASHTO 1,420 ft. required

2213’

ACCELERATION L

ENGTH

SR 896 SB

SR 896 N

B

I-95 NB

I-95 SB

PARK

IRON HILL

INDUSTRIAL PARK

DIAMOND STREET

CH

APEL STR

EET

RR TR

AC

KBRIDGE

EXISTING

WIDEN

Page 11: I-95 / SR 896 Interchange Improvementsbidcondocs.delaware.gov/DOT/DOT_15-1769I95and896Interchange... · Delaware Department of Transportation JULY 28, 2003 & KAHL ... AP R OX IM TE

SIGN

SIG

N

F.H.

SIGN

MH

GUY

DECK

DECK

SIGN

C

SIGN

CONC

CONC

F.H.

SIGN

C.B.

C.B.

C.B.

RIP-RAP

RIP-RAP

CONCASPH

ASPH

CONC

CONC

CONC

CONCASPH

ASPH

ASPH

SIGNSIGN

RIP-RAP

CONC

ASPH

O/H

SIGN

MH

CONC

ASPH

SIGN

SIGN

CONCASPH

ASPHCONC

ASPH

BRUSH

SIGN

SIGN

MH

CONC

ASPH

ASPH

CO

LL

EG

E

AV

EN

UE

SO

UT

H

DE - 896

C.B.

C.B.

C.B.

C.B.

I -

95

RAMP

CONCI - 95 RAMP

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

I - 95

RA

MP

CO

LL

EG

E

AV

EN

UE S

OU

TH

DE - 896

SIGN

SIGN

SIGN

DIDIDIDI

MH

SIGN

SIGN

C.B.

C.B.

C.B.

C.B.

C.B.

MH

MH

C.B.

DI

SIGN

CONC

CONC

CONCCONC ASPH

ASPH

ASPH

ASPH

C.B.

SIGN

DI

DI

DI

DI

SIGN

SIGN

DI

DI

DIDI

DI

DI

C.B.

SIGN

DI

DIDI

C.B.

DI

DI

MH

MH

DI

DI

SIGN

SIGN

CONC

CONC

ASPH

ASPHASPH

ASPH

SIGN

CONC

ASPH

ASPH

SIGN

DI

SIGN

SIGN

POOLDECK

C.B.

C.B.

MH

CONC

ASPH

C.B.

RIP-RAP

C.B.

C.B.C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

CONC DITCH

CO

NC

CO

LLE

GE

AV

EN

UE S

OU

TH

NB

L

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

CO

NC

CONC

CO

NC

WALL

ASPH

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 SBL

JOHN F. KENNEDY MEMORIAL HIGHWAY I-95 NBL

ASPH

CO

NC

CONC

CONC DITCH

CONC DITCH

DENSE TREES

DAM

POOL

CANOPY

CA

NO

PY

CANOPY

CANOPY

TRANS

RIP-RAP

RIP-RAP

ASPH PARKING

ASPH PARKING

CONC ASPH PARKING

ASPH PARKING

C.B.

CHRIS

TIN

A RIV

ER

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

CHRIS

TIN

A RIV

ER

DENSE TREES

CO

LLE

GE

AV

EN

UE S

OU

TH S

BL

DE - 986

ASPH PARKING

C.B.

C.B.

ASPH PARKING

CO

NC

C.B.

FO

FO

FO

C.B.

C.B.

J.W.

J.W.

J.W.

J.W.

J.W.

J.W.

J.W.

GMKR

MH

MH

MH

S

D

VENT

C.B.

J.W.

EV

EV

EV

EV

EV

G

S

PL

PL

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

ERW & DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW

& DA

ERW & DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

ERW &

DA

ERW &DA

ERW &DA

ERW &DA

ER

W

&D

A

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ERW &

DA

ERW &

DA

ERW & DA

ER

W

&

DA

ER

W

&

DA

ERW

& DA

ERW

& DA

ER

W

&

DA

ERW

& DA

ERW

& DA

ER

W

&

DA

ER

W

&

DA

ER

W

&

DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

ERW & DA

--

--

ER

W

&

DA

PL

PL

PL

PL

C.B.

C.B.

O/

H

SIG

N

C.B.

MH

CONC

DI

DI

SIGN

SIGN

SIGN

BILLBOARD

AC

AC

AC

AC

AC

AC

CONC

C

C

C

C

CC

CONC

ASPH

RAMP

TANK

DECK

TANK

TANK

TANK

TANK

TANK

CONC

CONCCONC

TANK

TANK

TANKTANK

TANK

CONC

C.B.

GATE

CONC

C.B.

TANK

TR

TR

SIGN

C.B.

SIGN

MH

GATE

TANK

TRANS

CONC

MH

DI

DI

DI

DI

RAMP

92041

72.81

92061

106.88

92062

72.89

93041

63.26

93061

63.00

93062

64.10

93063

63.65

93064

91.14

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

BIL

LB

OA

RD

GATE

GATE

MH

MH

SIGN

SIGN

MH

MH

MH

MH

LAMPLAMP

LAMP

SIGNSIGN

GATE

GATE

C.B.

SIGN

SIGN

C.B.

TANK

MH

SIGN

SIGN

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

BIL

LB

OA

RD

GATE

TR

GATE

C.B.

C.B.

RIP-RAP

RIP-RAP

GATE

MH

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

SIGN

SIGN

SIGN

SIGN

SIGN

SIGN

BIL

LB

OA

RD

BRUSH

TR

GATE

GA

TE

GATE

F.H.

GATE

MAIL

MAIL

CONC

CONC

DIRT PARKING LOT

ASPH PARKING LOT

CONCCONC

SIGN

CONC

MH

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

C.B.

GATE

GATE

GATE

MAIL

MAIL

SIGN

SIGN

F.H.

CSW

ASPH

ASPH

CSW

GATE

GATE

OPEN STORAGE

GRAVEL

GRAVEL

OPEN STORAGE

SIGN

ASPH

ASPH

JOHN F.

KENNEDY MEMORIAL

HIGHWAY

JOHN F.

KENNEDY MEMORIAL

HIGHWAY

I - 95

SBL

I - 95

NBL

CONC

CH

AP

EL

ST

RE

ET

GRAVEL

GRAVEL

OPEN STORAGE

SIGN

CSW

ASPH PARKING

ASPH PARKING

BROOKHILL DRIVE

DIRT PARKING

DIRT PARKING

TRAILER

ASPH PARKING

ASPH PARKING

CONC

CONC

ASPH

GRAVEL

OPEN STORAGE

ASPH PARKING

ASPH PARKING

ASPH PARKING

CONC

RA

MP

TRAILER

TRAILER

DIRT PARKING

C

ASPH PARKING

DIRT P

ARKING

ASPH PARKING

CONC

CONC

ASPH PARKING

CS

W

ASPH

ASPH

CS

W

CS

W

TRANS GRAVEL

ASPH PARKING

ASPH

CONC

ASPH PARKING

ASPH

ASPH PARKING

GRAVEL

OPEN STORAGE

OPEN STORAGE

ASPH

ASPH

ASPH PARKINGCONC

ASPH

CONC

RAMP

A/

C

A/

C

A/

C

CO

NC

DIRT PARKING

FO

J.W.

J.W.

C.B.

N

CHRISTINA CREEK

896

RR TR

AC

K

PARK

IRON HILL

PLAN LEGEND

APPROXIMATE EXISTING RIGHT OF WAY

PROPOSED ROADWAY PAVEMENT

EXISTING ROADWAY PAVEMENT

REMOVE EXISITING PAVEMENT

PROPOSED OVERLAY

TO WILMIN

GTON

TO TOLL PLAZA

Delaware Department of Transportation

JULY 28, 2003& KAHL

RUMMEL, KLEPPER

PLAN SCALE

0 50 100 200

ISSUES:

COMMENTS:

ISSUE 3 - SB SR 896 Weave

95

I NTERSTATE

B

F

F

C

I-95 / SR 896 Interchange Improvements

N/A

2015 PM PEAK

NO BUILD PROPOSED

WEAVE

2015 PM PEAK

NO BUILD PROPOSED

DIVERGE

N/A

2015 PM PEAK

NO BUILD PROPOSED

DIVERGE

Iss3opt3.dgn

N/A

10

15

20

25

30

PC

Sta 33

+4

2.5

5

PT

Sta 34

+93.4

5

35

40

45

PC

Sta 4

7+93.4

5

50

PT Sta 52+73.0

7

55

60

PO

T Sta 62+75.8

8

Flyover

Option 3 - Eliminate SB I-95 to SB 896

B

2015 PM PEAK

NO BUILD PROPOSED

MAINLINE

PO

T Sta 70+00.0

0

70

PC Sta 71+

65.3

0

PCC Sta 7

4+9

4.3

0

75

PC

C

Sta 77

+39.10

PT

Sta 7

8+5

5.1

0

80 85

PC

Sta 8

6+69.4

5

90

95

PT

Sta 98

+75.1

9

DS=

SE=

R=600’(Exist)

DS=

SE=

R=340’(Exist)

DS=

SE=

R=200’(Exist)

TAPER LENGTH300’

AD

2015 PM PEAK

NO BUILD PROPOSED

MAINLINE

C

TWO-LANE E

XIT2800’

DECELERATION L

ANE130

0’

TAPER300

TAPER300

DECELERATION L

ANE600

POT Sta 20+00.00

20

PC Sta 2

2+85.51

25

PC

C Sta 28+63.5

1

30

PT

Sta 33

+53.6

4

35

40 PC

Sta 4

1+88.18

45

PT

Sta 4

7+17.9

5

50

55

PO

T

Sta 57

+17.9

5

DS=40 mph

SE=6.0%

R=525’

D - Eliminates SB SR 896 weave between I-95 ramps

9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes

Christina Creek Bridge

1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at

2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility

3. SB SR 896 - Weave between I-95 Ramps

4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896

5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95

10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance

(No longer under consideration)

7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting

intersection on SR 896 that operates at LOS D

- Improves SB I-95 mainline operations, but creates a new signalized

- Eliminates vertical "dip" at approach to Christina Creek bridge

- Provides nearly 550 ft. of three-lane storage capacity off I-95

- Eliminates geometric issues with SB I-95 ramp to NB SR 896 off-ramp

- New signal will provide phase for NB I-95 to NB SR 896 ramp

WEAVING L

ENGTH600’

(NBR)

ACCELARATION LENGTH

1420’

(NBR)TAPER LENGTH

600’

INTERSECTION

2015 AM PEAK

NO BUILD PROPOSED

N/A

2015 AM PEAK

NO BUILD PROPOSED

2015 AM PEAK

NO BUILD PROPOSED

MERGE

B B

MERGE

C C

at previous toll facility (Issue 2)

- Eliminates SB I-95 loop-ramp to SB SR 896 and eliminates flat grade

- Lengthens acceleration from SR 896 loop-ramp to NB I-95

(No longer under consideration)

6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements

8. SB I-95 - Rutting at the Welsh Tract Road Bridge

INDUSTRIAL PARK

DIAMOND STREET

I-95 SB

I-95 NB

SR 896 N

B

SR 896 SB

STRUCTURE

BRIDGE

PROPOSED

DS=55 mph

SE=6.0%

R=1065’

STRUCTURE

BRIDGE

PROPOSED

WALL

BY RETAINING

SUPPORTED

FILL

WALL

BY RETAINING

SUPPORTED

FILL

EXIST. R

/W

EXIST. R

/W

EXIST. R/W

DS=45 mph

SE=6.0%

R=700’

DS=70 mph

SE=NC

R=14000’

DS=60 mph

SE=6.0%

R=1355’

DS= 60 mph

SE= 3.8%

R=4000’

DS=70 mph

SE=5.3%

R=3000’

BRIDGE

EXISTING

WIDEN

NEW SIGNAL

BARRIER

CONSTRUCT

Page 12: I-95 / SR 896 Interchange Improvementsbidcondocs.delaware.gov/DOT/DOT_15-1769I95and896Interchange... · Delaware Department of Transportation JULY 28, 2003 & KAHL ... AP R OX IM TE

(1,200)

2,020

(2,010)

2,850

(2,920)

1,730

1,610

(2,100)

30

(30)

50

(40)

670

10

(20)

40

(30)

(70)

X

X

1,610

(1070)

3,630

(2,370)

50

(50)

(2,460)

1,430

(1,920)

1,770

N

I-95 SBR

I-95 NBR

896

I-95 SB

I-95 NB

TO TOLL PLAZA

TO WILMINGTON

896

95

I NTERSTATE

ISSUES:

COMMENTS:

9. I-95 - Compatibility of New Toll Plaza Location with Highway Speed EZ Pass Lanes

Delaware Department of Transportation

JULY 28, 2003& KAHL

RUMMEL, KLEPPER

PLAN SCALE

ISSUE 5 - NB I-95 Acceleration Lane

NOT TO SCALE

NO BUILD PROPOSED

MAINLINE

NO BUILD PROPOSED

N/AF

WEAVE

NO BUILD PROPOSED

N/A

MERGE

INTERSECTION

NO BUILD PROPOSED

N/A F

40

NO BUILD PROPOSED

NO BUILD PROPOSED

MERGE

MAINLINE

F

F

AA

BC

CC

I-95 / SR 896 Interchange Improvements

Christina Creek Bridge

1. NB SR 896 Ramp to NB I-95 - Vertical "Dip" Immediately Before Approach Slab at

2. SB I-95 Ramp to SB SR 896 - Flat Grade at Location of Previous Ramp Toll Facility

3. SB SR 896 - Weave between I-95 Ramps

4. NB I-95 Ramp to NB SR 896 - Improve Left Turn onto NB SR 896

5. SB SR 896 Ramp to NB I-95 - Improve Acceleration Lane Length onto I-95

8. SB I-95 - Rutting at the Welsh Tract Road Bridge

10. SB I-95 Ramp to NB SR 896 - Ramp Geometry and Weaving Distance

2013 AM PEAK

2015 AM PEAK

2015 AM PEAK

2015 AM PEAK

2015 AM PEAK

2015 AM PEAK

80

1,260

(1,070)

(1,300)

B

NOTE: TRAFFIC VOLUMES ARE PEAK HOUR AM (PM) FOR YEAR 2015

- This configuration eliminates the weave along SB SR 896

develops the SB I-95 to SB SR 896 ramp as the second through lane on SB SR 896

- Requires converting the left through lane on SB SR 896 to a left turn lane and

- A new signal would be installed along SR 896 (LOS F)

from NB I-95 to NB SR 896

- A phase could be added to the signal to provide time for the left turn

the NB SR 896 to SB I-95 left turn

- Queue length on SB SR 896 would be approximately 1,260 feet, possibly blocking

approximately 4,090 pc/h during the 2015 AM peak

- The combined volumes on the NB I-95 on-ramp from SB and NB SR 896 is

than 2,250 to 2,400 pc/h through a merge

- The HCM states that it is unlikely that two-lane on-ramps can accommodate more

southbound left turns to move through the inersection

- Congestion and slow moving traffic on the on-ramp meters the ability for

Option 3 - Eliminate SB 896 Ramp Onto NB I-95

Iss5opt3.dgn

(No longer under consideration)

6. I-95 / SR 896 Ramps - Physical Condition of Ramp Pavements

(No longer under consideration)

7. I-95 / SR 896 Interchange - Adequacy of Existing Lighting