I-95 HOV/HOT Lanes Project Update

Update

Fairfax County Transportation CommitteeFairfax County Transportation CommitteeSeptember 20, 2011September 20, 2011

Page 2: I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011

The Title Would be Placed Here

Relief & new choices on I-95

Concurrent package of improvements:

• I-95 HOV/HOT Lanes Provide new choices, add capacity, extend and improve performance of existing HOV

• Department of Rail and Public Transportation Transit improvements Maximize benefit of growing HOT Lanes network by expanding bus service, Park & Ride lots

• VDOT Seminary HOV/Transit ramp Link HOV lanes on I-395 to growing Mark Center

• Seminary/Duke I-395 Auxiliary lanesImproved traffic movement on the regular lanes

Page 3: I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011

The Title Would be Placed Here•Environmental Assessment

•Draft NEPA document approved for public release by FHWA

•Interchange Justification Report

•Draft IJR report being finalized

•Technical Requirements

•Preliminary Design for Design Public Hearing

Since March Transportation Committee Briefing

Page 4: I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011

The Title Would be Placed Here

Key Milestones

• Combined Design Public Hearing, NEPA and Transit Study Information Meeting

• September 26th (Woodbridge)• September 28th (Springfield) • September 29th (Stafford)

• Finalize Environmental Document

• Finalize Interchange Justification Report

• Commercial Close

• Financial Close

• Construction as early as 2012

• Construction approximately 3 years

Page 5: I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011

The Title Would be Placed Herewww.virginiahotlanes.com

[email protected]

Regional Project and Traffic Information www.vamegaprojects.com

WWW.511 VIRGINIA.ORG

Project Information Resources

Page 6: I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011

The Title Would be Placed Here

Auxiliary lane

Page 7: I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011

The Title Would be Placed Here

Mark Center HOV/Transit Ramp

• Delivered concurrently with HOV/HOT Lanes

• Links Seminary Road to I-395• Ramp restricted to

HOV/transit• No anticipated impact on

Winkler Nature Preserve• Environmental, traffic

studies begin 2011• Construction as early as

2013

Page 8: I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011

The Title Would be Placed Here

Short & Intermediate TermImprovements