Welcome
I-91 Charter Oak Bridge Project
Public Information Meetings June, 2019
CTDOT, District 1:
Donald L. Ward, P.E. – District Engineer
Mohammed H. Bishtawi, P. E. – Asst. District Engineer
James Vincenzo, P.E. – Supervising Engineer
Juan Ruiz – Project Engineer
CTDOT, Highway Design:
Sebastian Cannamela, P. E. – Project Manager
Meredith Andrews, P. E. – Project Engineer
Federal Highway Administration
Robert Ramirez, P.E. – Traffic and Operations Engineer
Consultants
Michael Solie, P.E. – Resident Engineer, Louis Berger WSP
Ginger Manning – Public Information Officer, AECOM
Relocation of Interstate-91 (I-91) northbound (NB) Exit 29 and Widening of I-91 NB and Route 5/15 NB
to I-84 eastbound (EB). (State Project No. 63-703):
This portion of the Project will address safety concerns associated with congestion and operational
failures in Hartford and East Hartford at Exit 29 on I-91 NB, which connects to Route 5/15 NB, Route 2,
and I-84 EB.
Resurfacing, Bridge & Safety Improvements on I-91 (State Project No. 159-191):
This portion of the Project includes improvements to extend the service life of the pavement and bridges
(milling/paving & subsurface concrete repairs) between the Elm St. overpass in Wethersfield and the
new Exit 29 off-ramp in Hartford.
The I-91 Charter Oak Bridge Project includes two projects designed to reduce congestion and improve safety in Hartford, East Hartford, and Wethersfield:
Contract Highlights:
Contract Administered by CTDOT District 1
Construction Inspection – Louis Berger (WSP)
Contract Awarded to O&G /BHD, Joint Venture
Estimated Construction Cost - $213 million
Notice to Proceed – April 1, 2019
Maintenance and Protection of Traffic Goals:
Utilize Four Major Stages of Construction
Maintain all Existing Lanes During Peak Periods
Make use of Off-Peak Lane Closures for Short-
Duration Work (e.g. erection of beams)
Maintain Minimum Vertical Clearances for Bridges
Inform the Public of Construction Closures/
Detours and Impacts
Website: i-91CharterOakBridge.com
Page 2 Project 63-703: I-91 NB Exit 29 at the Charter Oak Bridge
Existing Conditions – There is congestion on I-91 NB; queueing in the right lane of I-91 NB has been observed
to extend as far as approximately 1.4 miles due to the following conditions:
I-91 NB Exit 29 off-ramp has a single lane configuration, steep vertical grade with a significant volume of
heavy vehicles (11%). Traffic volumes are near capacity, at approximately 23,400 vehicles per day.
I-91 NB mainline experiences approximately 68,600 vehicles per day (vpd), and is also at, or near, capacity.
The lane-drop from four, to three lanes, at Exit 27 contributes to the congestion.
Traffic on the northbound (approximately 44,400 vpd) portion of the Charter Oak Bridge experiences heavy
weaving of vehicles entering from the I-91 NB off-ramp and continues to Route 15/I-84, with vehicles from
Route 15 traveling to Route 2 and Route 5, via the Exit 90 off-ramp.
Existing I-91 NB Exit 29
Improvements Include
Relocate I-91 Northbound Exit 29
Provide Two Lanes
Provide New Bridge (5 spans, 880’ long)
Widen I-91 Northbound
Extend Four-lane Section from Exit 27 to
Exit 29
Widen Route 15 Northbound
Provide Three Lanes from Charter Oak
Bridge to the Silver Lane Underpass
Charter Oak Bridge
Page 2
Project 159-191 — Resurfacing, Bridge & Safety Improvements on Interstate 91
LEGEND
Full-depth pavement reconstruction
Milling and Overlay
Proposed Bridge/widening
Project 63-703 — Visualization
Left: This graphic
depicts the future
configuration of the I-91
NB Exit 29, and shows the
location of the existing
ramp. The new ramp will
be a major diverge, and
bridge over Route 5/15
before entering NB Route
5/15, and over the Charter
Oak Bridge.
Below: Map with plans
for construction and future
conditions.
Facing north, I-91 and
Wethersfield Cove
Includes improvements to extend the service life of the pavement and bridges (milling/paving & subsurface
concrete repairs) between the Elm St. overpass in Wethersfield and the new Exit 29 off-ramp in Hartford.
Improvements Include
Concrete Pavement Repairs
Bituminous Concrete Resurfacing
Median Reconstruction
Bridge Repairs/Improvements
Scour Remediation for Bridge No. 01460 over
Wethersfield Cove
Roadside Protection and Safety Improvements
Drainage Improvements
Overhead Signing Upgrades
Illumination Upgrades
Existing I-91 NB
Exit 29 one-lane
off ramp
New I-91 NB Exit 29
two-lane off ramp
Charter Oak Bridge
Completion
5/26/2022
Start
4/1/2019 Construction Duration: 38 Months
Keep Informed
Stage Construction and Timeline
Lower Roadways
Under Bridges
Widen
I-91 NB
Construct New
Exit 29 Ramp
Remove Existing Exit 29 Ramp; Widen 5 Spans
& Restripe Remaining Charter Oak Bridge
Project 63-703
Signing/Roadside
Safety & Drainage
Upgrades
Proposed Improvements in
Wethersfield along I-91 to be
Competed in First 2 Seasons
Median Reconstruction
& Concrete Pavement
Repairs
Project 159-191
Website: i-91CharterOakBridge.com
Receive Email Updates — Sign Up on Our Website.
Email Us: [email protected]
To view a Virtual Tour of the Project, use the QR code, on
Right, or the Following Link: http://vtour.123bim.com/EHMU
Facing northeast, I-91, Route 5/15
and the Charter Oak Bridge.