25
I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA PSPE Presentation, December 3, 2015

I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

I-676 (Vine Expressway) Bridge Reconstruction Project 22nd - 18th Streets Philadelphia, PA

PSPE Presentation, December 3, 2015

Page 2: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

PHILADELPHIA, PA

PROJECT LOCATION 22nd – 18th Streets

N

Location Map

Page 3: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

General Project Overview

Franklin Institute

Barnes Foundation

Construction Stage 1 – Jan 2015 to July 2017 **Parkway Centennial Celebration Summer 2017**

Construction Stage 2 – July 2017 to Nov 2019

Scope-of-Work at NTP…Replace 7 Structurally Deficient Bridge Superstructures

Scope-of-Work Expands… Reconstruction 2000 Block of Parkway, Shakespeare Park Expansion, Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter Street Realignment & Improvements, 22nd Street Roadway, Ramp & Signals

Page 4: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Engineering Challenges & Solutions - The Final Design Process Client: PennDOT / AECOM, Consultant Project Manager

Design Team: Pennoni (prime consultant) w/ 8 subconsultants Ammann & Whitney Arrow Land Solutions Vector Corrosion ASC Group AGES Chilton Engineering Bergmaier Communications LRSLAstudio

Final Design…Sept 2013 – Aug 2014…major challenges included: Accelerated final design schedule, PS&E Submission Sept 2014 Public outreach (40+ stakeholders, 100+ meetings) World Meeting of Families, final design plans revised (July 2014) for Papal Mass on the Parkway Bridge superstructure replacements over an interstate highway Reuse of existing bridge abutments Utility coordination Sculpture protection & relocation Extensive architectural treatments Extensive landscaping…more than 10,000 new trees, shrubs, ornamental grasses, perennials and bulbs Maintenance & protection of expressway and local street traffic during construction Traffic signal upgrades, ADA ramps, expressway/roadway lighting, drainage improvements……………..….

NTP for Construction, Jan 26, 2015 Contractor: Buckley & Company $65.4 Million

Page 5: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Engineering Challenge – World Meeting of Families Stage 1 – Phase 1 Construction Plan Presented to City / WMOF Task Force (July 2014)

Page 6: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Engineering Solutions – World Meeting of Families Construction Footprint for WMOF (September 2015)

Special Provisions for WMOF

a00311 Road User Liquidated Damages (RULD)

c90100 Project Milestones

e00200 Coordination with Law Enforcement Agencies During Construction

e00300 Restricted Use of Temporary Construction Easements and Staging Areas until October 1, 2015

Item 9624-0014 Security Fence Screening

Item 9000-0180 Demobilization for the World Meeting of Families No change to construction schedule…to make up the time, activities at multiple locations

were combined for simultaneous construction

Page 7: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

13’-10”

Engineering Challenges – Existing Bridges

• 7 bridges – 2 span, non-composite prestressed concrete adjacent box beams

• Bridge superstructures rated as structurally deficient / require replacement

• Center piers heavily deteriorated / require replacement

• Bridge abutments in fair condition / high chloride ion contamination

• Minimum vertical clearance 13’-10”

Page 8: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

• As-built Site Survey

• Determine Base Flood Elevation (BFE)

• Structural & Mechanical Inspection/Evaluation

• Design Plans

• Local & State Approvals

• Contract Bidding/Construction Estimates/Local Building Permits

• Construction

14’-6”

Engineering Solutions – Proposed Bridges

• Single span steel plate girders selected eliminating piers and improving clearance to 14’-6”

• Abutments retrofitted and repaired, electrochemical chloride ion extraction proposed

Page 9: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Engineering Challenges & Solutions – Major Utilities

PECO

Verizon / AT&T

PGW

Philadelphia Streets Department

Veolia Steam

Philadelphia Water Department

Franklin Institute

Page 10: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Engineering Challenges & Solutions – Vehicular/Pedestrian Safety Parkway / 20th Street / Winter Street Intersection

• Intersection within the boundaries of Fairmount Park • Serves the city museum district • Intersection accommodates 45,400 (VPD) + pedestrians

20

th S

tre

et

Winter Street

Page 11: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Detoured: • 18th Street (2,600) • 19th Street (4,600) • Family Court • Free Library

Staged Construction: • 22nd Street (10,200) • 21st Street (4,600) • 20th Street (Parkway 23,600; Vine St. 10,600; 20th St. 8,800; Winter St. 2,400)

Approximate Average Daily Traffic (ADT) shown in parenthesis

Engineering Challenges & Solutions – Local Street Traffic Control

Franklin Institute

Page 12: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Existing Conditions, EB & WB: • 3’ Shoulders, 3 - 12’ lanes

Long Term : • 0’ Shoulders, 3 - 11’ lanes,

7’ Work Zone each abutment

Short Term: • Overnight full closures,

Mon-Sun, 12 – 5am

• Single lane closures, Mon-Sun, 10pm – 6am

• Double lane closures, Mon-Sun, 11pm – 5am

Engineering Challenges & Solutions – Expressway Traffic Control

Page 13: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Engineering Challenges & Solutions – Art Preservation / Aesthetics Sculptures Civil War Memorials Francisco DiMiranda Statue*** Shakespeare Memorial General Pennypacker Monument ***Sculpture to be relocated

Aesthetic Treatments – Benjamin Franklin Parkway Design Guidelines • Exposed Aggregate Concrete Sidewalks • Brick Sidewalks / Banding • Granite Paving • Granite Veneer (planters) / Coping / Stair Treads / Caps • Granite Planter Curbs (re-use) • Tinted Concrete / Formliners • Decorative Fence (new & refurbished)

Key stakeholder coordination included…City, Fairmount Park, Office of Arts & Art Commission

Page 14: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Project Rendering 19th – 18th Street

Family Court

Vine St.

18

th S

t.

19

th S

t.

Page 15: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Project Rendering – Family Court Park

Page 16: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Project Rendering 20th - 19th Street

Free Library

20

th S

t.

Vine St.

19

th S

t.

Page 17: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Project Rendering – Shakespeare Park

Page 18: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Project Rendering – Vine Street Sidewalk

Page 19: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Project Rendering 21st – 20th Street

20

th S

t.

Winter Street

21

st S

t.

Franklin Institute

Page 20: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Project Rendering – Winter Street Plaza

Page 21: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Construction Photographs December 2015

Standing on 18th Street looking west

Family Court Bridge

Page 22: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Construction Photographs December 2015

Partially demolished Free Library Bridge

Partially demolished 19th Street Bridge

Page 23: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Construction Photographs December 2015

Construction site east of 20th Street

Parkway traffic control

Page 24: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Project Benefits to Delaware Valley Region

Interstate System Provides: • Freedom of travel, cross-country mobility • Congestion relief on local streets • Fast movement of goods and services • Defense highway system

Importance of Engineering Profession to Society

Maintaining our roads and bridges is critical to our way of life!!!

• Restored structural integrity of I-676 bridges from 22nd – 18th Street • Improved vertical clearance on expressway • Created additional park/green space • More than a bridge project…streetscape/beautification of center city for all to enjoy

Page 25: I-676 (Vine Expressway) Bridge Reconstruction Project 22nd ... · Vine Street Sidewalk Construction, Logan Circle Sidewalk Reconstruction, Extensive Landscape Improvements, Winter

Questions

20

th S

tre

et

19

th S

tre

et

18

th S

tre

et

Winter Street

22

nd S

tre

et

21

st S

t.

I-676

PROJECT WEBSITE…bridgesover676.com

Free Library Family Court