I595 Express 595 Express id j id j Corridor Improvements Project Corridor Improvements Project September 14, 2011 Paul A. Lampley, P.E. I595 Project Manager

I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

II‐‐595 Express 595 Express id jid jCorridor Improvements ProjectCorridor Improvements Project

September 14, 2011Paul A. Lampley, P.E. I‐595 Project Manager 

Page 2: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

INTRODUCTIONSINTRODUCTIONS

• Paul Lampley FDOT Construction Project ManagerPaul Lampley, FDOT Construction Project Manager

• Kelley Hall, FDOT Project Engineer

• Ed Perez Oversight CEI Resident Engineer• Ed Perez, Oversight CEI Resident Engineer

• Melanie Sexton, Oversight CEI PIO 

Page 3: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

PROJECT VIDEO

Page 4: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

PROJECT LIMITS

To West Palm Beach

To

NaplesBroward Boulevard

Sunrise Boulevard

adRoad

Road

ngo Ro

ad

Davie Boulevard

W 136

 Avenu

e

University Drive

Pine

 Island

 Roa

Nob

 Hill R

Hiatus 

Flam

in

Davie Roa

d

Griffin Road

SW

Port Everglades

FLLAirport

Griffin Road

To MiamiTo MiamiProject Limits

I‐595 from I‐75/Sawgrass Expressway Interchange to East of the I‐95 Interchange

Page 5: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

PROJECT COMPONENTS

• Reversible Express Lanes– Direct Connect to Florida’s 

• Ramp Improvements– Auxiliary Lanes

Turnpike– Open Road Tolling

• S.R. 84 Continuous Connection

– Ramp Braids– Bypass Bridges

• Sound Barrier Walls• Turnpike Interchange• Broward County Greenway

Sound Barrier Walls• Express Bus Service

Page 6: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

TYPICAL SECTIONS

Page 7: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

INNOVATIONS

• 1st DBFOM Public Private Partnership (P3) in Florida

• 1st Availability Payment P3 in the US

INNOVATIONS

• 1 Availability Payment P3 in the US

• Reversible toll lanes (six lanes for the price of three)

• Congestion pricing

• State of the art emergency access and infrastructure

Fi i t• Fire suppression system 

• Emergency access gates

• 35‐year Operations and Maintenance35 year Operations and Maintenance 

• Direct connections to Florida’s Turnpike

• Oversight CEI

• Express Bus Service

• Shared‐use drainage  

Page 8: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

I‐595 TEAM ORGANIZATION

Design Management Construction/Operations Management

Concession Agreement

ConcessionaireDB Contract Financing Agreements

Design‐Build Contractor

LendersLenders

Design‐Build Contractor

gal A

dvice Technical Advisor

Design Subcontractor

Counsel

Technical and

 Le

CEI O&M 

Page 9: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

CONSTRUCTION OVERSIGHT OPTIONS

• No Owner Oversight

CONSTRUCTION OVERSIGHT OPTIONS

• No Owner Oversight

• Independent Engineer

• Oversight Construction, Engineering and Inspection

• Traditional Construction, Engineering and Inspection

Page 10: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

DESIGN ZONES

10

Page 11: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

CONSTRUCTION SEGMENTS

SEGMENT ABegan November 2010

SEGMENT BBegan November 2010

SEGMENT CBegan February 2010

SEGMENT EScheduled to Begin February 2011

11SEGMENT DBegan June 2010

Page 12: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

PROJECT ADMINISTRATION

• Design Submittals (1445 to date)

– 536 structural submittals

PROJECT ADMINISTRATION

536  structural submittals– 559 roadway and other disciplines submittals– 350 Shop Drawings

• Audits• Audits– Construction Audits

• 678 Construction audits completed on I‐595

• Construction Average Audit Rating is 94.3%

• 88 In‐Depth Proficiency reviews conducted

– O&M Audits

• 106 O&M audits completed on I‐595 to date

• 100% of Audits Passed

– Materials– Materials

• 6128 samples have been taken with 19 failures

• 100 open samples (or, 1.6% open samples )

Page 13: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

EFFORTS TO ADVANCE THE PROJECT

• Over 140 Work at Risk Packages

EFFORTS TO ADVANCE THE PROJECT

Over 140 Work at Risk Packages• 21‐day design review time • More workshops – less rigid communication 

t lprotocol• Defined Roles and Responsibilities for delegation 

of “Engineer”  • Empowering  the CCEI and EOR to make field 

decisions to keep project moving • Modified Shop Drawing approval processModified Shop Drawing approval process• Released packages with caveats

Page 14: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

EFFORTS TO ADVANCE THE PROJECT

• Coordination Workshops with FTE

EFFORTS TO ADVANCE THE PROJECT

• Coordination Workshops with FTE

• Weekly Coordination with SFWMD

• Allowed Release of Traffic Control Plans in PhasesAllowed Release of Traffic Control Plans in Phases

• Allowed daytime Lane Closures on SR 84 & SR 7

• RFI Process established

• Weekly Structures Comment Resolution meetings 

• Established Witness & Hold CCEI Process

• Streamlined Foundation Certification process

Page 15: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

EFFORTS TO ADVANCE THE PROJECT

D il W k h

EFFORTS TO ADVANCE THE PROJECT

• Daily Workshops

• Partnering with Contractors

• Partnering (OCEI and CCEI)• Partnering (OCEI and CCEI)

• Weekly Coordination meeting (OCEI and CCEI)

• Integrated CCEI into the OCEI audit processIntegrated CCEI into the OCEI audit process

• Weekly lane closure review (OCEI, CCEI, DUSA)

• Weekly Executive Progress MeetingWeekly Executive Progress Meeting

• Monthly Sr. Executives Meeting (FDOT and I595E) 

• Bimonthly Sr. Executives Meeting (FDOT, I595E, )DUSA, AECOM)

Page 16: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

EMPLOYMENT STATUS

• Over  160 companies

EMPLOYMENT STATUS

• Over  2326 employees

• DBE Participation (On track for 8.1% goal )08/09 9 0%– 08/09 ‐ 9.0%

– 09/10 ‐ 9.2% 

– 10/11 ‐ 8.7%  

• Trainees:  118 planned, 60 Graduated, 18 more actively enrolled  

Page 17: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

PROJECT SCHEDULE / STATUSPROJECT SCHEDULE / STATUS

As of August 31, 2011 the project is:

ll h d l

g , p j• 33% Complete / Cost• 36% Complete / Time

Overall Schedule:• Execution of Agreement March 3, 2009

• NTP 1 March 3, 2009,

• Advance Construction Activities June 15, 2009

• NTP 2 (Take over O&M) July 31, 2009

M j C i F b 26 2010• Major Construction Feb. 26, 2010

• Interim Milestones (50% Contract Time) Sept. 2011

• Interim Milestones (75% Contract Time)  Dec. 2012

• Substantial Completion March 2014

• Final Acceptance June 2014

Page 18: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

CONSTRUCTION SCHEDULE

• All Five Construction Segments under Construction

CONSTRUCTION SCHEDULE

g– “C”: Bergeron Land Development (started Feb. 2010), 42% Complete

– “D”: Ranger Construction (started May 2010), 38% Complete

– “A/B”: Prince Contracting (started Nov. 2010), 24% CompleteA/B : Prince Contracting (started Nov. 2010), 24% Complete

– “E”: Ranger Construction (started April 2011), 13% Complete

– Overall 33% Complete

• Corridor Wide Construction– Bridges: Dragados/Baker Joint Venture

– Bridges: GLF Construction

– MSE Walls: Bonn J Contracting

– Sheetpile/Pile Driving: Ebsary Foundation

Page 19: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

OPERATIONS & MAINTENANCE

• Traffic Management Center (TMC) S ff d 24/7 365 d

OPERATIONS & MAINTENANCE

– Staffed 24/7 – 365 days

– Manage/ Monitor Traffic Cameras & Incidents on I‐595

– Coordinate with Local Agencies• FHP / Fire Rescue / Local Authorities / BSO

• Road Ranger Services– Operate 24/7 – 365 daysOperate 24/7  365 days

– Responding to an average of 1200 incidents/month 

– Responding in less than 5 minutes

S I id t R V hi l (SIRV) O ti• Severe Incident Response Vehicle (SIRV) Operations• Rapid Incident Scene Clearance (RISC) Operations

Page 20: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

PAYMENTS TO CONCESSIONAIRE

I‐595 Express Payment Structure

PAYMENTS TO CONCESSIONAIRE

$250

$300 I‐595 Express Payment Structure  

FinalSCHEDULED

CONSTRUCTION

$150

$200

217

s (M

illions) Maximum Milestones Payment

Availability

COMPLETION

$100

$150124

7195

123

4

Paym

ents

$0

$50

2014 2015 2016 2017 2018 2019 2020 2044

20

6450

2014 2015 2016 2017 2018 2019 2020 2044

Year

Page 21: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

P3 BENEFITS

• Innovative ideas (35 year term)

P3 BENEFITS

• Possible private equity

• Access to global capital marketsg p

• Transfer of appropriate risk

• Long term relationships• Long term relationships

• Can provide “stability” in pricing

• Contract outlines the “deal”

Page 22: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

PROJECT SUCCESSES

• Co‐location

PROJECT SUCCESSES

Co location• Community Outreach• EEO/OJT/DBE• EEO/OJT/DBE• O&MAd d C t ti A ti iti• Advanced Construction Activities 

Page 23: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

P3 CHALLENGES

• Loss of control or perceived loss of control

P3 CHALLENGES

Loss of control or perceived loss of control– Day to Day Management

– Setting toll rates, performance standards, g , p ,etc.

• “Cherry picking” by the private sector

• Learning curve in negotiating and managing P3s

• “Real” transfer of risk (will cost real money)

• Long term relationships

Page 24: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

PROJECT CHALLENGES

• Communications

PROJECT CHALLENGES

Communications• Procurement vs. Implementation TeamTeam

• Aggressive Schedule• Teamwork• Teamwork• FDOT in Oversight Role

Page 25: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

LESSONS LEARNED

• Pick the right projects

LESSONS LEARNED

Pick the right projects• Be flexible in procurement, contracting, and 

finance process• Secure government and community 

stakeholders’ support• Be patient and start at the right time• Secure outside experts with P3 experience• Be transparent and have an interactive process• Be flexible, clear, consistent and persistent

Page 26: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

BEST PRACTICES• Established project specific Business Plan 

• Materials: Established a well defined process for

BEST PRACTICES

• Materials: Established a well‐defined process for quality control and quality assurance

• Co‐location:  FDOT, Concessionaire, Contractor,  dDesigner, and OCEI

• O&M: Performance Based Program

• Customer service: PIO on both the concessionaire and FDOT side

• Proper balance of performance and prescriptiveProper balance of performance and prescriptive requirements

• Appropriate Risk allocation

• Audits to verify project performance 

Page 27: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

FUTURE RECOMMENDATIONS

• Develop contract specifications tailored to Public‐Private Partnerships  (DBFOM)

FUTURE RECOMMENDATIONS

• Roles and Responsibilities of engineer delegates 

• Develop project administration procedures (CPAM) specific to Public‐Private Partnerships (DBFOM)specific to Public Private Partnerships (DBFOM)

• Develop a materials model specifically for Public‐Private Partnerships  (DBFOM)

• Develop guidelines for shop drawing approval authority

• Establish construction phase performance metrics, similar to the current O&M metrics

• Develop an audit process for design reviewsDevelop an audit process for design reviews

• Develop guidance in PPM and Design Standards 

Page 28: I 595 Express Corridor Improvements Project...PROJECT SCHEDULE / STATUS As of August 31, 2011 the project is: ll hdl pj • 33% Complete / Cost • 36% Complete / Time Overa Schedule:

Thank You!Thank You!