I-49 North Segment K Project Segmental Concrete Girder Design 2013 Louisiana Transportation Conference Session 58 Craig Finley, P.E., Finley Engineering Group, Inc., Tallahassee, FL Durk Krone, P.E., TRC Engineers, Inc., Baton Rouge, LA I-220 at Russell Road I-49 over MLK Drive Ramp SE Ramp EN Ramp WN

I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

  • Upload
    voxuyen

  • View
    220

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

I-49 North Segment K Project – Segmental Concrete Girder Design

2013 Louisiana Transportation Conference – Session 58

Craig Finley, P.E., Finley Engineering Group, Inc., Tallahassee, FL

Durk Krone, P.E., TRC Engineers, Inc., Baton Rouge, LA

I-220 at Russell Road

I-49 over MLK Drive

Ramp SE

Ramp EN

Ramp WN

Page 2: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

AGENDA

2

• Site Location

• Corridor

• Project Team

• Timeline for Development of Segment K

• Site Plan – Bridges to be Designed in Segmental

• Segmental Design

• Project Specific Design Features

• Segmental Construction Details

• Closing Remarks & Questions

Page 3: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

ARKANSAS

SITE LOCATION

3

185 MILES TO

DALLAS, TX

T

E

X

A

S

M

I

S

S

I

S

S

I

P

P

I

PROJECT

SITE

LAFAYETTE BATON

ROUGE

NEW

ORLEANS

Page 4: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

CORRIDOR

4

SEGMENTS A – J

ALL UNDER

CONSTRUCTION

OR COMPLETED

SEGMENT K

Page 5: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

PROJECT TEAM

5

• Louisiana DOTD – Baton Rouge, LA o Joachim C. Umeozulu, P.E. – Project Manager

o Paul Vaught, III, P.E. – Bridge Design Project Manager

• TRC Engineers – Baton Rouge, LA o Durk Krone, P.E. – Principal / Project Manager

o Michael Paul, P.E. – Deputy Project Manager

• Finley Engineering Group – Tallahassee, FL o Craig Finley, P.E. – Project Principal

o Jerry Pfuntner, S.E., P.E. – Project Manager / Designer

• Touchstone Architects – Tallahassee, FL o Bradley Touchstone, AIA - Principal

• NTB Associates – Shreveport, LA o Paul Rossini, PLS – President/CEO

o Dexter Grogan, P.E. – Bridge Design

• AFJM, Inc. – Shreveport, LA o E.L. “Skip” James, Jr. – Director of Transportation

o Elba Hamilton, P.E. – Project Engineer

BRIDGE

DESIGN

ROADWAY DESIGN

Page 6: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

TIMELINE FOR DEVELOPMENT OF SEGMENT K

DATE

JUNE 6, 2006

MAY 25, 2007

AUGUST 2, 2010

JULY 7, 2011

JANUARY 5, 2012

JANUARY 2, 2013

EVENT

TRC received Notice-to-Proceed for Preliminary

Bridge Design

Project placed on-hold

Supplement No. 1 – Notice-to-Proceed

DOTD, ASBI, TRC – Discuss potential

implementation of segmental bridge construction

DOTD/TRC – Discussed the steps needed to

develop final plans for the implementation of

segmental bridge design for 3 ramp structures.

DOTD issued Advanced Notice-to-Proceed to TRC

6

Page 7: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

Site Plan – Bridges to be Designed in Segmental

7

I-220 at Russell Road

I-49 over MLK Drive

Ramp SE

Ramp EN

Ramp WN

Page 8: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

A SEGMENTAL BRIDGE

8

Is A Construction Technique…

….…with Design Implications

SEGMENTAL DESIGN

Page 9: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

SEGMENTAL DESIGN

9

• 3 Bridges, 700 Segments, 271,000 sf. Deck Area

• Span for Lengths 120’ to 260’, radius 550’ (Ramp WN)

• 3 Roadway Cross Sections 31.5’, 35.5’, and up to 52’ wide

• Pier Heights of 20’ to 90’

• Foundations and Access

• Aesthetics Without Cost

• Best Practices Approach

SEGMENTAL DESIGN CHALLENGES

Page 10: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

SEGMENTAL DESIGN

10

• Precast Segmental

• Balanced Cantilever, Erected by Cranes

• Combination of Haunched and Constant Depth Segments

• One Set of Casting Machines

• External Post-Tensioning with Diabolos

• Best Practices – Good Experience

SEGMENTAL DESIGN SOLUSTIONS

Page 11: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

PROJECT SPECIFIC DESIGN FEATURES

11

• Project Design Criteria

– LADOTD BDM with some “extras”

– Principal Stress Requirement 3f’c

– Shear – AASHTO LRFD and Segmental Guide Specifications

• Analysis Software

– 3-D Time Dependent

• Serviceability and Maintainability

• Tendon Replacement and Bearing Replacement

• Load Rating

FEATURES-SEGMENTAL DESIGN

Page 12: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

SEGMENTAL CONSTRUCTION DETAILS

12

Precast Segmental Construction

PRECASTING

Page 13: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

SEGMENTAL CONSTRUCTION DETAILS

13

Forms to Accommodate Width and Depth Differences

PRECASTING MACHINES

Page 14: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

SEGMENTAL CONSTRUCTION DETAILS

14

5 Segment Types – 1 Form Set

SEGMENT TYPES

Page 15: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

SEGMENTAL CONSTRUCTION DETAILS

15

Balanced Cantilever Construction

SEGMENT ERECTION

Page 16: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

SEGMENTAL CONSTRUCTION DETAILS

16

External Post-Tensioning and Diabolos

EXTERNAL PT

zzzz

Page 17: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

SEGMENTAL CONSTRUCTION DETAILS

17 COMPLETED BRIDGE

Page 18: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

CLOSING REMARKS & QUESTIONS

• Site Location

• Corridor

• Timeline for Development of Segment K

• Project Team

• Site Plan – Bridges to be Designed in Segmental

• Segmental Design

• Project Specific Design Features

• Segmental Construction Details

18

Page 19: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on

QUESTIONS

19

Page 20: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation

Results you can rely on 20

Durk Krone, P.E., Principal

TRC Engineers, Inc.

8550 United Plaza Boulevard, Suite 502

Baton Rouge, LA 70809

[email protected]

T: 225.216.7483

Follow us LinkedIn Twitter

www.trcsolutions.com

Craig Finley, Jr., P.E., Principal

Finley Engineering Group, Inc.

1589 Metropolitan Boulevard

Tallahassee, FL 32308-3776

[email protected]

T: 850.894.1600

Follow Us Like Us

www.finleyengineeringgroup.com

Speaker Information