I-485 Express LanesSTIP Project I-5507 | Mecklenburg County
About the project Timeline*
• Between 2007 and 2013, the Fast Lanes Study examined existing and planned major highways throughout a 10-county area and identified corridors that could benefit most from implementing express lanes to help manage congestion during peak travel periods. The findings of this study recommended additional analysis on I-485 in southern Mecklenburg County. (see the project timeline to the right)
• The I-485 Express Lanes project will add one express lane in each direction along I-485 between I-77 and U.S. 74 (Independence Boulevard). The project will also add one general purpose (GP) lane in each direction between Rea Road and Providence Road.
• In coordination with other projects in southern Mecklenburg County (see map on next page), this project will serve as part of a larger network of express lanes offering drivers the option of more reliable travel times.
• Construction will begin in summer 2019 and the express lanes are scheduled to open to traffic in fall 2022. Additional information about the construction schedule is on page 4.
• To minimize the duration of construction along the project corridor, three other projects will be constructed at the same time as the I-485 Express Lanes – the Ballantyne Commons Parkway bridge widening, a new interchange at Weddington Road, and John Street interchange improvements. (see map on next page)
2007 City of Charlotte in coordination with several local, regional and state agencies initiated Fast Lanes Study
2013 NCDOT Initiated Preliminary Design and Environmental Studies
2014 Charlotte Regional Transportation Planning Organization (CRTPO) and NCDOT included I-485 Express Lanes project in the 2040 Metropolitan Transportation Plan (MTP) and 2016-2025 State Transportation Improvement Program (STIP)
2015 I-485 Public Meeting #1
2018 July: I-485 Public Meeting #2
August: Environmental Document Approved
September: Design-Build Contract Awarded
2021 Summer: New Interchange at Weddington Rd Anticipated to Open to Traffic
Fall: Third GP lane between Rea Rd & Providence Rd Anticipated to Open to Traffic
2022 Fall: Express Lanes between I-77 & U.S. 74 Anticipated to Open to Traffic
Winter 2019/2020 Conduct Noise Wall Balloting
2019 June: Public Meeting #3
Summer: Begin Right-of-Way Acquisition and Construction
Fall: Recommend Noise Wall Locations
publicinput.com/I-485-CharlotteScan to visit the project website
For more information on the project:
@NCTurnpike 1-800-254-0498
Summer 2019
Potential Noise Wall Locations
Right-of-Way Process
2
The initial noise study for the I-485 Express Lanes (called a Traffic Noise Report) was completed in 2018 and identified 21 locations that preliminarily met the criteria for noise walls in accordance with the NCDOT Traffic Noise Policy.
As part of the final design for the project, these preliminary noise wall locations are being re-evaluated based on additional roadway design information and elevation data. The results of the final design noise analysis, which will be documented in a Design Noise Report, will determine the locations, heights and lengths of the noise walls recommended for construction. The Design Noise Report will be complete this fall, after which all property owners and tenants who are benefited by a wall will be asked to vote on the barrier. This is called balloting. At that time, NCDOT will contact property owners and tenants
74
BY-PASS
TOLL
Charlotte
Matthews
Sardis Rd
Pineville-Matthews Rd
Providence Rd
John St
Rea Rd
Johnston Rd
Weddington Rd
Sou
th B
lvd
Indian Trail
LakeParkPineville
Mint Hill
South Carolina
W Arrowood Rd
Monroe Expressway
I-5507: Add ExpressLanes Along I-485
Note: Existing and Extended GeneralPurpose Lanes Will Not Be Tolled
U-6103: Add Express Lanes Along U.S. 74
U-2509B: Add Express Lanes and General Purpose Lanes
Along U.S. 74
U-2509A: Add Connectivity of Parallel Roads
I-5718: Add ExpressLanes Along I-77
77
485
485
277
16
51
27
49
160
74
74
485
John St Interchange Improvements
Future Charlotte Regional Express Lanes
Replacement of Ballantyne Commons Pkwy Bridge
publicinput.com/I-485-Charlotte
NCDOT worked to minimize impacts to homes and businesses during the final design process, but there are some areas where private property will need to be acquired either by permanent right-of-way or by easement. NCDOT treats all property owners fairly, explains legal rights, pays just compensation in exchange for property rights, and furnishes relocation assistance, if needed. All impacted property owners will be contacted individually by a NCDOT right-of-way agent or by a right-of-way consulting firm representing NCDOT as the project progresses.
New Weddington Rd Interchange
who are eligible to vote and explain the balloting process. Recommended noise walls that pass the balloting process will be included in construction plans.
485
485
GENERALPURPOSE
LANES
GENERALPURPOSE
LANES
GENERALPURPOSE
LANES
EXPRESSLANESENTRY
EXPRESSLANESEXIT
MEDIAN
MEDIAN
EXPRESSLANE
EXPRESSLANE
EXPRESSLANE
NEW
NEW NEW
485
Providence Road to U.S. 74
NEW
I-77 to Providence RoadI-485 Express Lanes Typical Sections Rendering
Note: Typical section for I-485 West of Providence Road3publicinput.com/I-485-Charlotte
EXPRESSLANE
GENERALPURPOSE
LANES
GENERALPURPOSE
LANES
GENERALPURPOSE
LANES
Access Point
Wes
ting
hous
e B
lvd
South Blvd
Sou
th
Car
olin
a
Johnston Rd
Providence Rd
Pine
ville
-Mat
thew
s Rd
John S
t
Weddington Rd
I-485
Exp
ress
Lan
es C
onst
ruct
ion
Sch
edul
e*
End
have
n Ln
Elmst
one
Dr
Elm Ln
Elm
Ln
Brid
ge a
ntic
ipat
ed
to b
e cl
osed
fro
m F
all
2019
to
Fall 2
020
Rea Rd
Elm Ln16
51
Exte
nsio
n of
thi
rd G
ener
al P
urpo
se
Lane
fro
m R
ea R
d to
Pro
vide
nce
Rd
anti
cipa
ted
to o
pen
in F
all 20
21
New
Wed
ding
ton
Rd
inte
rcha
nge
anti
cipa
ted
to o
pen
in S
umm
er 2
021
John
St
inte
rcha
nge
impr
ovem
ents
an
tici
pate
d to
ope
n
in S
umm
er 2
021
Con
stru
ctio
n of
Exp
ress
Lan
es f
rom
I-77
to
U.S
. 74 w
ill b
egin
in S
umm
er 2
019
.Th
e Ex
pres
s La
nes
are
anti
cipa
ted
to o
pen
to t
raff
ic in
Fal
l 20
22.
Not
e: E
xist
ing
and
Exte
nded
Gen
eral
Pu
rpos
e La
nes
Will
Not
Be
Tolled
* D
ates
sho
wn
are
subj
ect
to c
hang
e
Rodn
ey S
t
Royshall
Dr
Wes
ting
hous
e Blv
d
Rod
ney
St
betw
een
Wes
ting
hous
e B
lvd
and
Roy
shal
l D
r an
tici
pate
dto
be
clos
ed f
rom
S
prin
g 20
20 t
o Fa
ll 2
020
Rec
onst
ruct
ion
of
Bal
lant
yne
Com
mon
s
Pkw
y B
ridge
ant
icip
ated
to
occu
r fr
om W
inte
r 20
19to
Sum
mer
20
20.
No
lane
s w
ill b
e cl
osed
du
ring
cons
truc
tion
.
GP
GP
4 publicinput.com/I-485-Charlotte