I-405 Peak-Use Shoulder Lane Project Overview AASHTO STSMO Systems Operations Strategies Focus Group May 16, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR 167 Program Karl Westby, PhD. Traffic Manager WSDOT I-405/SR 167 Program

I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

I-405 Peak-Use Shoulder LaneProject Overview

AASHTO STSMO Systems Operations Strategies Focus GroupMay 16, 2017

Barrett Hanson, P.E.Design Manager

WSDOT I-405/SR 167 Program

Karl Westby, PhD.Traffic Manager

WSDOT I-405/SR 167 Program

Page 2: I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

I-405/SR 167 Corridor• 40-mile freight and commuter corridor• North-south alternative to I-5• One of the most congested routes in

Washington State• Home to fastest-growing population and

job centers in greater Seattle area

I-405 express toll lanes• Opened between Bellevue and Lynnwood

in Sept. 2015• Two-lane system between Bellevue

and Bothell• Single-lane system between Bothell

and Lynnwood• Extension of system funded between

Bellevue and Renton to connect with SR 167 high occupancy toll lanes

Project Setting

2

Page 3: I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

Challenge: High Demand, Limited Capacity

3

Bottleneck moved north after new capacity opened • Higher volumes moving

faster in five-lane section (Bellevue/Kirkland area)

• Resulted in increased congestion in three-lane section (Bothell area)

High volumes entering I-405 at SR 527 during afternoon peak periods• ~1,000 vehicles/hour were forced to merge into

general purpose lanes• The result: general purpose lane back-ups, less

reliable express toll lane trips (and higher toll rates)

Page 4: I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

Traffic Conditions Before Shoulder Conversion

4

• Heavy traffic during the afternoon commute throughout the corridor

• Congestion builds south of SR 527 during peak periods

February-April 2017

Page 5: I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

Project Scope and Budget

Converted existing right shoulder to dynamically controlled general purpose peak-use shoulder lane

First dynamically controlled peak-use shoulder lane in Washington State

• Existing static peak-use shoulder lane on US 2 north of Seattle

Total project cost: $11.5 million• Construction funded by toll revenue

Extensive stakeholder coordination & outreach• Washington State Patrol• WSDOT traffic/tolling divisions• FHWA• Local cities• Freight industry• Traveling public

5

Page 6: I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

• 1.8 mile section of northbound I-405 between SR 527 and I-5

• Four overhead electronic lane control signs with side-mounted message signs• 0.5 mile spacing • 5-foot by 5-foot lane control sign• Supplemental messages and

queue warnings• Four paved emergency pull-out areas• New quarter-mile long noise wall• Restriping

Project Construction Elements

Typical northbound roadway cross-section

6

Page 7: I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

Rapid Project Timeline

2016 2017April 24

Opened to traffic

JanuaryConstruction

start

MarchProject

identified

SeptemberDesign-build RFP

issued

DecemberContractawarded

14 months from project development to open to traffic

120 days from NTP to opening

7

Page 8: I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

Early performance: Congestion contoursBEFOREFebruary-April 2017

AFTERFirst 3 weeks

8

Page 9: I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

Early performance: Travel times

0

5

10

15

20

25

30

12:0

0

13:0

0

14:0

0

15:0

0

16:0

0

17:0

0

18:0

0

19:0

0

20:0

0

21:0

0

Trav

el T

imes

(min

)

General Purpose Travel Times, Northbound I-405 between SR 522 and I-5

(Mileposts 21.83-28.98)

95th%-5th% Jan-Apr Avg Feb-Apr (M-F) 3 Weeks (M-F)

9

Page 10: I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

Early performance data: VolumesVe

hicl

es p

er h

our

Date

Five-hour Peak-Use Shoulder Lane Volumes (2 to 7 p.m.)

2582

3259

4250

37963455

3642

4547

5073

39803770

4216 4138

5147

4279 4205

0

1000

2000

3000

4000

5000

6000

4/23 4/24 4/25 4/26 4/27 4/28 4/29 4/30 5/1 5/2 5/3 5/4 5/5 5/6 5/7 5/8 5/9 5/10 5/11 5/12 5/13

Week 1

Week 2 Week 3

10

Page 11: I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

Positive feedback from the public

11

Page 12: I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

Future peak-use shoulder lane projects planned in Seattle region

• I-90, Eastgate to SR 900(both directions)

• Construction start: 2018

• I-5, Everett to Marysville(northbound only)

• Construction start: 2019

• I-405, Renton area(northbound only)

• Construction start: 2019

WSDOT is implementing peak-use shoulder lanes at strategic locations to add more space for travelers in a quick, cost-effective manner. WSDOT is also partnering with local transit agencies to open bus-only shoulders.

12

Page 13: I-405 Peak-Use Shoulder Lane · 2019-02-19 · I-5, Everett to Marysville (northbound only) • Construction start: 2019 • I-405, Renton area (northbound only) • Construction

CONTACT

Barrett HansonDesign manager, I-405/SR 167 program

[email protected]

Karl WestbyTraffic manager, I-405/SR 167 program

[email protected]

13