13
Footer Text I - 3 5 C E N T R A L P L A N N I N G A N D E N V I R O N M E N T A L L I N K A G E S S T U D Y

I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY

Footer Text

I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES

STUDY

Page 2: I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY

BexarCounty

Courthouse

BexarCounty

Courthouse

BexarCounty

Courthouse

SpanishGovernor’s

Palace

SpanishGovernor’s

Palace

SpanishGovernor’s

PalaceSan Fernando

CathedralSan Fernando

CathedralSan Fernando

Cathedral

ConventionCenter

ConventionCenter

ConventionCenter

AlamoAlamoAlamo

HemisfairPark

HemisfairPark

HemisfairPark AlamodomeAlamodomeAlamodome

MarketSquareMarketSquareMarketSquare

Pearl StreetBrewery

Pearl StreetBrewery

Pearl StreetBrewery

UTSAUTSAUTSA

Santa RosaHospital

Santa RosaHospital

Santa RosaHospital

UniversityHealth Center

UniversityHealth Center

UniversityHealth Center

CattlemanSquare

CattlemanSquare

CattlemanSquare

37

37

1 0

1 0

1 0

1 0

1 0

90

90

87

87

1 0 87

87

28 1

28 1

3728 1

BROADWAY

BROADWAY

BROADWAY

FLORES

FLORES

FLORES

FLO

RES

FLO

RES

FLO

RES

SAN PEDRO

SAN PEDRO

SAN PEDRO

EUCLID

EUCLID

EUCLID

NOG

ALITO

S

NOG

ALITO

S

NOG

ALITO

S

ST MARY’S

ST MARY’S

ST MARY’S

McC

ULLOUG

H

McC

ULLOUG

H

McC

ULLOUG

H

JOSEPHINEJOSEPHINEJOSEPHINE

AV

E A

AV

E A

AV

E A

HOUSTONHOUSTONHOUSTON

W. DURANGO

W. DURANGO

W. DURANGO

E. DURANGO

E. DURANGO

E. DURANGO

PRESAPRESAPRESA

PEC

OS

PEC

OS

PEC

OS

TRAVISTRAVISTRAVIS

ALAMO ST

ALAMO ST

ALAMO ST

MARTINMARTINMARTIN

W. COMMERCEW. COMMERCEW. COMMERCE

E. COMMERCEE. COMMERCEE. COMMERCE

MONTANA STMONTANA STMONTANA ST

LAREDOLAREDOLAREDO

GUADALUPEGUADALUPEGUADALUPE

BRA

ZOS

BRA

ZOS

BRA

ZOS

ALAMOALAMOALAMO

STUDY AREASTUDY AREAI-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES (PEL) STUDYI-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES (PEL) STUDY

TEXAS DEPARTMENT OF TRANSPORTATIONTEXAS DEPARTMENT OF TRANSPORTATION

Ride ShareOff-Peak TravelReal Time Travel InfoITS Park & Ride Telecommute

Travel Smarter.Reduce Traffic.

Page 3: I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY
Page 4: I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY
Page 5: I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY
Page 6: I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY
Page 7: I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY
Page 8: I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY

ImprovedSignalTiming and Intersection Upgrades

No BuildTravel Options

Truck-Only Lanes

No improvements are made in this scenario.

Connecting ArterialImprovements

Operational Improvements

Added Capacity/Expansion of I-35

An option that will ‘re-designate’ I-35 from a primary through-route for traf c, making it more of a local/business route for commuters and Central San Antonio-bound traf c.

Travel Options offer just that:- to drivers that can help

to reduce traf c on our roads. Think Ride Sharing, Off-Peak Travel, or ITS, to name a few.

R A I L

Capacity is increased by building elevated

sections above existing roadway, or by tunneling under.

Multi-modal connectivity

CONCEPTUAL STRATEGIESI-35 PEL

Page 9: I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY

TransportationSystem Management

Traf c Demand Management

IntelligentTransportationSystems

Intelligent Transportation Systems (ITS) focuses on advanced technologies that enable drivers to operate vehicles with greater knowledge about existing traf c conditions, e.g., during lane closures or unplanned incidents.

Traf c Demand Management is the application of strategies and policies to reduce travel demand, speci cally that of single-occupancy private vehicles, or to redistribute this demand in space and time.

Other improvementsmight include:

Advance guide signing can helpseparate local traf c from through traf c.

There are many minor improvements, generally within the existing right-of-way,that can enable the existing system to operate more ef ciently and safely.

TelecommutingOff-Peak Travel Ride Sharing

28 1

Built-in navigation system alerts

Cameras monitortraf c conditions

Ramp Modi cations Geometric Improvements

Downtown employer-based programs may include

Commute Programs, In-House Ride-Matching, Transit Pass Subsidies, or Alternative Work Hours.

Auxiliary Lane Additions

Advance Message Signsand Real Time Travel Info

Improved Signing

Page 10: I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY

ReDESIGNATIONWith the changes to land use and overall corridor function, the I-35 corridor could be ‘re-designated’ as a local or business route rather than a corridor used as a through-route. Through the improvements identi ed in this study, I-35 Central may evolve from a “through” facility to a “local or alternate” facility.

Upper & Lower DecksFurther separate traf c by directing through traf c to the upper deck and local traf c to the lower deck.

Minimize weavingsegments

Reduce travel time through San Antonio

ContinuousI-35 and I-10movements withappropriate access

I-35 Movement

28 1

I-10 Movement

How does a“Re-Designation”

Alternative work?

These alternatives can result inimprovements in corridor operation.

Separate local traf c from through movements

Re-designate I-37(north of I-10 to I-35)

Create a dual I-10 and I-35 designation for east-west traf c south of downtown

Improve interchanges to accommodate continuous movement at higher speed

3

12

4

A designated travel laneallows through traf c an

alternate movement past the city and to their destinations.

Page 11: I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY

Park & RidePark & Ride (or incentive parking) facilities provide connections to public transit that allow commuters and other people headed downtown to leave

their vehicles and transfer to a bus or carpool for the remainder of the journey.

Park & Rides are used by commuters going to work,by other riders transferring from one route to another, and for special event services.

UniversityParkhillsBlossomSeaWorld

CrossroadsEllis AlleyElmendorfRandolph Blvd.

Number of Park & Rides currently available to San Antonio Commuters.8

Transit CentersTransit Centers often offer enclosed waiting areas with restrooms, vending machines and staff to assist riders. Customers using transit systems converge at these ‘hubs’ to take advange of route-to-route transfers and

access to more destinations.Bicycle storage and enhanced transit information such as real-time departure signs are also usually found at Transit Centers.

Number of Transit Centers currently available to San Antonio Commuters.5

IngramKel-LacMadla Transit CenterSouth Texas Medical Center

Northstar Transit Center

HOV/Managed LanesA managed lane, or high-occupancyvehicle (HOV) lane, is a restricted traf c lane reserved at peak travel times orlonger for exclusive use of vehicles with two or more passengers. Managed/HOV lanes may also be called carpool or transit lanes.

Robert Thompson Transit Center

WestSideMulti-Modal Center

2+

A combination of possible HOV lanescould feed downtown San Antonio, thereby

decreasing travel times on multiple routes and offering a more reliable trip time downtown.

HOV/TRANSIT

Page 12: I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY

Economic

What are the potential environmental impactsof the alternative?

Does the alternative...encourage useof other routes?

reduce vehicle miles traveled?

reduce travel time?

Goals and ObjectivesEvaluating the Strategies

Does the alternative reduce congestionon I-35 through the study area?

Safety

Environmental Impacts

Alternate Routes

Vehicle Miles Traveled (vmt)

Vehicle Hours Traveled (vht)

What level of public support isthe alternativelikely to have?

Public Support

The “Evaluation Criteria” shown here will be used to help determine the next steps in the I-35 PEL Study.

Does the alternative reduce crasheson I-35?

Does the alternative support economic development?

Cultural Resources

Wetland/Water Resources

Land Use

Vegetation and Wildlife Habitats

Mobility

Page 13: I-35 CENTRAL PLANNING AND ENVIRONMENTAL LINKAGES STUDY

an initial screening of alternatives.

the alternatives.

viable alternatives to move forward for further study.

Consider

Consider

Conduct

Re ne

What Comes Next?

Continue collecting and considering community input throughout the study.

Continue screening re ned alternatives.

community input from tonight’s public meeting.