2
I - 205 PAVING I - 5 to Abernethy Bridge NEWSLETTER #3 SPRING 2018 Paving Work Continues Beginning in June, ODOT continues repaving the nine-mile stretch of roadway on Interstate 205 between the Interstate 5 interchange in Tualatin and the south end of the Abernethy Bridge in West Linn. Key elements of the remaining work include: ADA-compliant sidewalk curb ramp improvements on the northeast corner of 10th Street and 8th Court. Resurfacing the I-205 bridges that cross over SW Woodbine Road and SW Borland Road. Sidewalk curb ramp improvement work will take place during the day and night. All other work will take place primarily at night and will include multiple lane closures. ODOT’s noise hotline will be staffed 24 hours a day to help resolve any noise problems or incidents. The hotline number is 503-412-2325. Check the project website for up-to-date construction information. 205 5 TUALATIN WEST LINN OREGON CITY Project boundary at I-5 SW Borland Rd. bridge improvements SW Woodbine Rd. bridge improvements Project boundary at south end of Abernethy Bridge Project Area Map Willamette River 10th St. ADA-compliant sidewalk curb ramp improvements Nighttime Lane Closures I-205 Northbound and Southbound: Monday-Thursday night, 10 p.m. – 5 a.m. Friday night, 11 p.m. – 7 a.m. Saturday night, 11 p.m. – 8 a.m. 8th Court and 10th Street: Monday-Thursday night, 8 p.m. – 6 a.m. Friday night, 8 p.m. – 8 a.m. Saturday night, 8 p.m. – 9 a.m. www.i205construction.org

I-205 PAVING - I-205 Construction · website for up-to-date construction information. West Linn Abernethy Bridge 10th St OR 43 loop ramp Tualatin SW Borland Rd SW Woodbine Rd 205

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I-205 PAVING - I-205 Construction · website for up-to-date construction information. West Linn Abernethy Bridge 10th St OR 43 loop ramp Tualatin SW Borland Rd SW Woodbine Rd 205

I-205 PAVINGI-5 to Abernethy Bridge

NEWSLETTER #3SPRING 2018

Paving Work Continues Beginning in June, ODOT continues repaving the nine-mile stretch of roadway on Interstate 205 between the Interstate 5 interchange in Tualatin and the south end of the Abernethy Bridge in West Linn. Key elements of the remaining work include:

• ADA-compliant sidewalk curb ramp improvements on the northeast corner of 10th Street and 8th Court.

• Resurfacing the I-205 bridges that cross over SW Woodbine Road and SW Borland Road.

Sidewalk curb ramp improvement work will take place during the day and night. All other work will take place primarily at night and will include multiple lane closures.

ODOT’s noise hotline will be staffed 24 hours a dayto help resolve any noise problems or incidents. Thehotline number is 503-412-2325. Check the projectwebsite for up-to-date construction information.

WestLinn Abernethy

Bridge

10th St

OR 43loop ramp

Tualatin

SW Borland Rd

SW Woodbine Rd

205

5

TUALATIN

WEST LINN

OREGON CITY

Projectboundaryat I-5

SW Borland Rd. bridge improvements

SW Woodbine Rd. bridge improvements

Projectboundary at south end of AbernethyBridge

Project Area Map

Willamette River

10th St. ADA-compliant sidewalk curb ramp

improvements

Nighttime Lane ClosuresI-205 Northbound and Southbound: Monday-Thursday night, 10 p.m. – 5 a.m.Friday night, 11 p.m. – 7 a.m.Saturday night, 11 p.m. – 8 a.m.

8th Court and 10th Street: Monday-Thursday night, 8 p.m. – 6 a.m.Friday night, 8 p.m. – 8 a.m.Saturday night, 8 p.m. – 9 a.m.

www.i205construction.org

Page 2: I-205 PAVING - I-205 Construction · website for up-to-date construction information. West Linn Abernethy Bridge 10th St OR 43 loop ramp Tualatin SW Borland Rd SW Woodbine Rd 205

Oregon Department of Transportation Region 1 Headquarters 123 NW Flanders St.Portland, OR 97209

I-205 PAVINGI-5 to Abernethy Bridge

www.i205construction.orgSign up online to receive

construction alerts.24 Hour Noise Hotline: 503-412-2325

Stay informed about the project at www.i205construction.org

Questions?Mike Boyer, Community [email protected]

Paving on I-205 between I-5 and the Abernethy Bridge begins again in June.Look inside for details.

For ADA Title II or Civil Rights Title VIaccommodations, translation/interpretationservices or for additional information call(503) 731-4128, TTY (800) 735-2900 or usethe statewide Oregon Relay Service: 7-1-1.