Page 1: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Hywind – From idea to world’s first

wind farm based upon floaters

Finn Gunnar Nielsen

Geophysical Institute, UiB

[email protected]

Page 2: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Sources

• FGN. Hywind. Deep offshore wind operational experience.

Deepwind, Trondheim, Jan. 2013.

• FGN. Update on the Status of the Hywind Concept. Future Offshore

Foundations, Bremen, Oct 23 -25 2013.

• Olsen, G.P. Floating offshore wind in Statoil, Energy Lab, May 2017

• Statoil.com web-site.

• Private photos by FGN.

PAGE 2

Page 3: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

The road from here…

3

Source: Statoil

Page 4: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Via …

4

Source: Statoil

Page 6: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

An idea is born

• Inspired by floating sailing marks.

– Could we power offshore installations?

6

Source: Statoil

Page 7: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

On the move from land to deep water

0 m-30

m

30 m-60

m60 m-900

m

Source:

NREL

PAGE 7

Page 8: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Shallow water – a scarce resource

PAGE 8

Source: http://d3lp4xedbqa8a5.cloudfront.net/s3/digital-cougar-assets/AusGeo/2015/04/07/55431/world-map-ocean-tharp.jpg

Page 9: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Evolution versus disruption

9

Page 10: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

TrifloaterWind FloatGicon

Concrete Star Ideol

Pelastar

Hywind

PAGE 10

Various floater concepts

Page 11: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

And many more…

WinFloWinSea VertiWind

Mitsui

Mitsubishi Heavy

Industries

Aerogenerator X

PAGE 11

Page 12: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Key features

Combines known technologies

Designed for harsh environment

”Standard” offshore turbine

Water depth >100 m

Assembled in sheltered waters, towed to field

Relies upon experience from :

Floating platforms

Electrical power production

Onshore wind turbines

The Hywind concept

12

Source: Statoil

Page 13: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Offshore wind turbines.

Challenging dynamic system

Foundation - fixed or floating

Structural dynamicsFatigue

Mooring line dynamics

Wave andCurrent forces

Wind loads

Gyro effects

Power transmission cable

Power transmissionGeneratorControl system

PAGE 13

Page 14: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

MODEL SCALE EXPERIMENTS 2005

PAGE 14

• Demonstration of system behaviour

• Validation of numerical tools

• Model scale 1:47

• Irregular waves, turbulent wind, and various control strategies

Source: Statoil

Page 15: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Hywind demonstration unit.

Installed June 2009. Located10 km West of Karmøy

15

Main particulars

Siemens turbine: 2.3 MW

Turbine weight: 138 tons

Draft hull: 100 m

Nacelle height: 65 m

Rotor diameter: 82.4 m

Water depth: 150–700 m

Displacement: 5300 t

Mooring: 3 lines

Diameter at water line: 6 m

Diam. submerged body: 8.3 m

Contractors:

Siemens, Technip, Nexans, Haugaland kraft.

Support from Enova.

Karmøy

Source: Statoil

Page 16: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Assembly and installation of Hywind Demo.

Summer 2009

16

Source: Statoil

Page 17: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Operation in harsh environment

• Max wind velocity: 40 m/sec

• Max sign wave height: 10.5 m

17

Page 18: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Production during a storm condition

PAGE 18

• 24 hour period during

storm “Dagmar”, Dec

2011

• Avg. wind speed 16

m/sec

• Max wind speed 24

m/sec

• Max significant wave

height 7.1m

• Power production 96.7%

of rated

Source: Statoil

Page 19: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

From idea to commercial concept

19

Demo

Pilot park

Model test

Concept & theory

Onshore connected parks

2002

2005

2009

Technical Focus

Cost Focus

Market Focus

2017

Idea

2003

Onshore connected parks

Source: Statoil

Page 20: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

20

Optimization of hull design

Experience and improved tools

Hywind Demo 2.3MW Hywind 6MW

Page 21: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Primary objective:

Demonstrate cost efficient solution and lower risk for commercial

scale floating wind farms• 5 x 6 MW turbines

• Location: Buchan Deep outside Peterhead

• Agreement for lease with The Crown Estate in 2013

• Consent in 2015

• First deliveries to grid 2017

21

Hywind Scotland Pilot Park

Peterhead

Aberdeen

Edinburgh

Hywind Scotland

Pilot Park

United

Kingdom

Source: Statoil

Page 22: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Assembly at Stord, May 2017

PAGE 22

Page 23: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Hywind installed on site, August 2017

PAGE 23Source: https://www.tu.no/artikler/her-er-den-forste-dronevideoen-av-verdens-forste-flytende-vindpark/403837

Page 24: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Control challenge

PAGE 24

Page 25: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Real turbines – power curves and

power coefficient

0 5 10 15 20 25 300

0.2

0.4

0.6

0.8

1

Velocity (m/sec)

P/P

rate

d

0 5 10 15 20 25 300

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0.4

0.45

Velocity (m/sec)

CP

Constant blade pitch

Variable speed

Variable blade pitch

constant speed

Idling

PAGE 25

Page 26: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Wind turbine thrust.

Conventional Control, over rated speed.

Natural period of tower surge ~ 120 sec.

Waves ~ 4 – 20 sec

Wind ~ 1 sec – 5 min

PAGE 26

Page 27: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Motion controller for floating

foundation

PAGE 27

Shut down

Conventional controller

Motion stabilizing controller

Source: Statoil

Page 28: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines

Marine operations – challenges…

28

Page 29: Hywind From idea to world’s first wind farm based upon ...€¦ · Demonstrate cost efficient solution and lower risk for commercial scale floating wind farms • 5 x 6 MW turbines