6
 MLE worksite - Algeria Hygiene inspection INSPECTION TYPE: Hygiene inspection SCHEDULED DATE: 24/07/2011 DISCIPLINE: HSE DATE CARRIED OUT: 24/07/2011 PROJECT TITLE: MLE - Menzel Ledjmet East REPORT ISSUE DATE: 25/07/2011 LOCATION: Algeria AREA: GASSI TOUIL Surname Name Company Job Position HAMIDOUCHE SAID SAIPEM HSE Supervisor INSPECTED BY: CHENIA BOUMEDIENE OGEC Doctor BEBBA LOTFI SH-FCP HSE Officer BILAL MEZIANE OGEC HSE Coordinato r GEORGE ESSAD OGEC Camp Boss GT Camps & catering hygiene OBSERVATIONS: Before After CONCLUSIONS & CORRECTIVE ACTIONS From Inspection held on 06 July 2011 To be corrected by / date The barr acks of TE LLI & OGE C company puttin g on ground directly - These barracks should be arise from ground to avoid scorpion sting & other risks and ensure health for workers [ FR OM PRE VI OUS MONTH]  TELLI &OGEC IMMEDIATELY The barracks grounding cables are damaged - It must be restored by qualified person OGEC IMMEDIATELY

Hygiene Walk Around GT July 2011

Embed Size (px)

Citation preview

Page 1: Hygiene Walk Around GT July 2011

7/31/2019 Hygiene Walk Around GT July 2011

http://slidepdf.com/reader/full/hygiene-walk-around-gt-july-2011 1/6

 MLE worksite - Algeria

Hygiene inspection 

INSPECTION

TYPE:

Hygiene inspection SCHEDULED DATE: 24/07/2011

DISCIPLINE: HSE DATE CARRIED OUT: 24/07/2011

PROJECT TITLE: MLE - Menzel Ledjmet East REPORT ISSUE DATE: 25/07/2011

LOCATION: Algeria AREA: GASSI TOUIL

Surname Name Company Job Position

HAMIDOUCHE SAID SAIPEM HSE SupervisorINSPECTED BY:

CHENIA BOUMEDIENE OGEC Doctor

BEBBA LOTFI SH-FCP HSE Officer

BILAL MEZIANE OGEC HSE Coordinator

GEORGE ESSAD OGEC Camp Boss

GT Camps & catering hygiene

OBSERVATIONS:

Before After

CONCLUSIONS & CORRECTIVE

ACTIONSFrom Inspection held on 06 July 2011

To be corrected

by / date

The barracks of TELLI & OGECcompany puttin g on ground directly

-  These barracks should be arise fromground to avoid scorpion sting & other risks and ensure health forworkers

[ FROM PREVI OUS MONTH]  

TELLI &OGEC

IMMEDIATELY 

The barracks grounding cables aredamaged

-  It must be restored by qualifiedperson

OGECIMMEDIATELY

Page 2: Hygiene Walk Around GT July 2011

7/31/2019 Hygiene Walk Around GT July 2011

http://slidepdf.com/reader/full/hygiene-walk-around-gt-july-2011 2/6

 MLE worksite - Algeria

Hygiene inspection 

The bathroom carbines werewithout adequate shower curtains

-  It must be providedOGEC

IMMEDIATELY

There are some opening holes onthe laundry room

-  It must be repairedOGEC

IMMEDIATELY

There is a leaking water from thewell behind the camp witch canlead to explosion because the

existing generator & electricalcontrol box

-  They have to solve this problem

OGECIMMEDIATELY

The drain water on ground areclosed

It must be repaired 

OGECIMMEDIATELY

Page 3: Hygiene Walk Around GT July 2011

7/31/2019 Hygiene Walk Around GT July 2011

http://slidepdf.com/reader/full/hygiene-walk-around-gt-july-2011 3/6

 MLE worksite - Algeria

Hygiene inspection 

The cover against f lies from I taliankit chen is damaged

It must be replaced by new one 

OGECIMMEDIATELY

We observe some water leakageinside the Algerian sanitary room

It must be repaired 

OGECIMMEDIATELY

We observe some dirt on th eextractor fan filters

-  It must be usually cleanedOGEC

IMMEDIATELY 

Lack of signs as “forbidden accessonly for authorized person”

-  To apply & display more in theentering of cooking & food storagearea

OGECIMMEDIATELY 

This table used when cutting themeat is not cleaned

This table should be cleaned to preventthe spread of germs 

[ FROM PREVI OUS MONTH]

OGECIMMEDIATELY 

Do the food handlers observe basic

personal hygiene & w earappropriate clothi ng?

- Jewellery not allowed

- Appropriate shoes must be provided

- Trousers should be without pockets, noshirt sleeves protruding, clean.

- catering hats or hairnets

OGECIMMEDIATELY 

Page 4: Hygiene Walk Around GT July 2011

7/31/2019 Hygiene Walk Around GT July 2011

http://slidepdf.com/reader/full/hygiene-walk-around-gt-july-2011 4/6

 MLE worksite - Algeria

Hygiene inspection 

the deck used by the butcher is al i tt le dirty 

To bring for him another deck to ensurea clean alternative

OGECIMMEDIATELY

Workers don’t wear adequateshoes; sandals & bare feet areprohibited

To provide suitable shoes for workersinside the kitchen

OGECIMMEDIATELY 

The entrance of Algerian kit chen notclean

-  To put a concrete behind this door& to clean more with water

[ FROM PREVI OUS MONTH]  

OGEC

IMMEDIATELY 

Electrical hazardous inside thedining room & kitchen (disjunctionelectrical box wit hout cover)

-  To provide an appropriate covers tothese disjunction electric box

[ FROM PREVI OUS MONTH]  

OGEC Action

DONE 

Fly k iller inside the k it chen is failed.

-  It must be repaired

[ FROM PREVI OUS MONTH]  

OGEC Action

DONE 

I nside the dining room, someShelves used for dishes are dirt y.

-  shelves used for dishes should becleaned daily

[ FROM PREVI OUS MONTH]  

OGEC

IMMEDIATELY 

Page 5: Hygiene Walk Around GT July 2011

7/31/2019 Hygiene Walk Around GT July 2011

http://slidepdf.com/reader/full/hygiene-walk-around-gt-july-2011 5/6

 MLE worksite - Algeria

Hygiene inspection 

Workers have habits to left theirshoes outside of barracks

-  To make an awareness campaignfor people on the risks that mayresult from this dangerous situation

[ FROM PREVI OUS MONTH]  

OGEC

IMMEDIATELY 

Page 6: Hygiene Walk Around GT July 2011

7/31/2019 Hygiene Walk Around GT July 2011

http://slidepdf.com/reader/full/hygiene-walk-around-gt-july-2011 6/6

 MLE worksite - Algeria

Hygiene inspection 

Prepared By: HAMIDOUCHE Said Approved By: CENSABELLA Sant