1
Hydrostatics Trim: 0.000 (m) Draught Volume Displ. Displ. LCB (m) (m 3 ) (tonnes) (tonnes) (m) 0.000 0.724 0.742 0.742 14.429 1.000 30.042 30.793 30.793 14.332 2.000 88.742 90.961 90.961 14.117 3.000 169.160 173.389 173.389 13.906 4.000 266.566 273.231 273.231 13.693 NOTE 1: Draught (and all other vertical heights) is measured above base Z=0.000 NOTE 2: All calculated coefficients based on project length, draught and beam. Nomenclature Draught Moulded draught, measured from baseline Volume Total displaced volume Displ. Displacement Displ. Displacement LCB Longitudinal center of buoyancy, measured from the aft perpendicular at X=0.0 Hydrostatics report 10/24/2015 1

Hydrostatics Report

Embed Size (px)

DESCRIPTION

hydrostatics

Citation preview

Page 1: Hydrostatics Report

Hydrostatics

Trim: 0.000 (m)Draught Volume Displ. Displ. LCB

(m) (m3) (tonnes) (tonnes) (m)

0.000 0.724 0.742 0.742 14.4291.000 30.042 30.793 30.793 14.3322.000 88.742 90.961 90.961 14.1173.000 169.160 173.389 173.389 13.9064.000 266.566 273.231 273.231 13.693

NOTE 1: Draught (and all other vertical heights) is measured above base Z=0.000NOTE 2: All calculated coefficients based on project length, draught and beam.

NomenclatureDraught Moulded draught, measured from baselineVolume Total displaced volumeDispl. DisplacementDispl. DisplacementLCB Longitudinal center of buoyancy, measured from the aft perpendicular at X=0.0

Hydrostatics report

10/24/2015 1