     AIT EXTENSION 

     Asian Institute of Technology  

    Pakistan Water and Power Development Authority 

    Date: 9‐10 March 2015 

    Venue: Avari Lahore 

    Energy Development Services Management and Technology Program

    (EDSMAT) Phase 2

    International Professional Program on 

    HYDROPOWER FINANCING

     

    Pakistan – Thailand - Australia

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    2/106

     AIT EXTENSION 

     Asian Institute of Technology  

    Dr. Roland Amoussou‐Guenou 

    Partner  –

     Vovan

     &

     Associes

     Legalink

     Lawyers, Patent & Notarial Service Attorneys 

    www.vovan‐lawgroup.com 

    Lecturer 

    Asian Institute of  Technology 

    Energy Regulatory

     and

     Contractual Frameworks of  

    Energy Projects in Pakistan 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    3/106

     AIT EXTENSION 

     Asian Institute of Technology  

    I. GENERAL: 

    Pakistan Power

     Challenges

     and

     Opportunities

     

    a) Pakistan Power Sector 

    b) Pakistan Power Supply Chain 

    c) Pakistan Power Profile 

    d) Pakistan Power

     Potential

     

    e) Pakistan Power Efficiency 

    f) Pakistan Hydro Potential 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    4/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    5/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    6/106

     AIT EXTENSION 

     Asian Institute of Technology  

    The Big Challenge: Doing Business and 

    Getting Electricity

     

    6 EDSMAT Phase 2 ‐ Proposal 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    7/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    8/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    9/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    10/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    11/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    12/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    13/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    14/106

     AIT EXTENSION 

     Asian Institute of Technology  

    II. SPECIFIC: 

    Solutions to

     Address

     the

     Power

     Problem

     

    a) Conceptual approach and discussions on solution 

    to address

     Pakistan

     Power

     problem

     

    b) PPP 

    c) Project Finance 

    14 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    15/106

     AIT EXTENSION 

     Asian Institute of Technology  

    III. 

    Role 

    of  

    WAPDA 

    a) Electricity production worldwide 

    b) Ratio of 

     hydro/thermal

     mix

     projects

     

    c) Present installed capacity in Pakistan 

    d) Hydropower generation in various countries in the world 

    e) Electricity consumption by various countries 

    f) Storage for

     different

     rivers

     in

     the

     world

     

    g) Pakistan electricity Power demand 2007‐2030 

    h) Year wise hydel power induction 

    i) Idel 

    power 

    capacity 

    addition 

    in 

    the 

    last 

    decades 

     j) Pakistan hydel power potential 

    k) Pakistan hydropower development 

    l) Hydropower projects undertaken by WAPDA 

    15 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    16/106

     AIT EXTENSION 

     Asian Institute of Technology  

    Role of  WAPDA (Ctnued) 

    m) WAPDA Hydel stations in operation 

    n) Hydropwer projects under construction with 

    WAPDA 

    o) Project ready for construction 

    p) Projects

     under

     studies

     

    16 EDSMAT Phase 2 ‐ Proposal 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    17/106

     AIT EXTENSION 

     Asian Institute of Technology  

    Barriers in the development of  power potential in Pakistan 

    •   Limited financial resources both for project studies and implementation. 

    •   Long term investment returns starts coming after long time. 

    •   Long investigations

     and

     gestation

     period

     of 

     hydropower

     projects.

     

    •   Remote location of  promising potential sites and dilapidated infrastructure. 

    •   Lack of  trained manpower. 

    •   Non availability of  local manufacturing facility for electro‐mechanical equipments.

     

    •   Lack of  experienced local construction companies for medium to large size HPPs. 

    •   Less response from private investors in implementing hydropower projects. 

    •   Security situation.

     

    17 EDSMAT Phase 2 ‐ Proposal 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    18/106

     AIT EXTENSION 

     Asian Institute of Technology   18

    Recommendations and Mitigations• Funds may be arranged/allocated on priority basis for the planning

    and development of indigenous resources.

    • Priority needs to be given for Construction of Mega hydropower projects.

    •  All identified potential sites be studied to feasibility level and

    implementation may be scheduled on Long term basis.

    • Sufficient manpower be got trained with short term courses and on job

    training.

    • Infra-structure in potential project areas be improved.

    • Local manufacturing be encouraged with transfer of technology.

    •Projects with PPIB may be implemented with Public-Private Partnership.

    • Securi ty of potential areas be improved.

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    19/106

     AIT EXTENSION 

     Asian Institute of Technology  

    Overview of  Selected WAPDA Projects 

    19 EDSMAT Phase 2 ‐ Proposal 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    20/106

     AIT EXTENSION 

     Asian Institute of Technology  

    IV. 

    Power 

    Project 

    PPP 

    Case 

    Studies 

    a) African 

    ‐Bujagali

     hydropower

     plant

     (Uganda)

     

    b) Asia 

    Nam 

    Theun 

    Hydropower 

    plant 

    (Laos) 

    c) Pakistan 

    ‐ Tarbela Dam 

    20 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    21/106

     AIT EXTENSION 

     Asian Institute of Technology  

    V. 

    The 

    Policy 

    and 

    Institutional 

    Framework 

    •   The overarching policy framework 

    •   Basic PPP

     policy

     

    •   Statement of  intention of  the government on how 

    PPP will be implemented, the process and how the 

    players will be treated 

    •   See World Bank and PPIAF (Public Private Advisory 

    Facility) check lists 

    21 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    22/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    23/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    24/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    25/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    26/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    27/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    28/106

     AIT EXTENSION 

     Asian Institute of Technology  

    VI. 

    The 

    Legal 

    Framework 

    •   National legislation 

    •   The UNCITRAL

     PPP

     guidelines

     

    •   PPP Legal perspectives UNESCAP 

    28 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    29/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    30/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    31/106

     AIT EXTENSION 

     Asian Institute of Technology  

    VII. 

    The 

    Regulatory 

    Framework 

    •   See NEPRA (National Electricity Regulatory 

    Authority) 

    31 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    32/106

     AIT EXTENSION 

     Asian Institute of Technology  

    VIII. Contractual and Risk Management in 

    Power Projects

     

    a) Contract negotiation 

    b) Contract standards

     and

     best

     practices

     

    c) Risk management 

    d) Due 

    diligence 

    in 

    PPP 

    projects 

    e) Tool kits 

    32 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    33/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    34/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    35/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    36/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    37/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    38/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    39/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    40/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    41/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    42/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    43/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    44/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    45/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    46/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    47/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    48/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    49/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    50/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    51/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    52/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    53/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    54/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    55/106

     AIT EXTENSION  Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    56/106

     AIT EXTENSION  Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    57/106

     AIT EXTENSION  Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    58/106

     AIT EXTENSION  Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    59/106

     AIT EXTENSION  Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    60/106

     AIT EXTENSION  Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    61/106

     AIT EXTENSION  Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    62/106

     AIT EXTENSION  Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    63/106

     AIT EXTENSION  Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    64/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    65/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    66/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    67/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    68/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    69/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    70/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    71/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    72/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    73/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    74/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    75/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    76/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    77/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    78/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    79/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    80/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    81/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    82/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    83/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    84/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    85/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    86/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    87/106

     AIT EXTENSION 

     Asian Institute of Technology  

    Energy Contract Financing 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    88/106

     AIT EXTENSION 

     Asian Institute of Technology   88

     EDSMAT

     Phase

     2 ‐

    Proposal 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    89/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    90/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    91/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    92/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    93/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    94/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    95/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    96/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    97/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    98/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    99/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    100/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    101/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    102/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    103/106

     AIT EXTENSION 

     Asian Institute of Technology  

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    104/106

     AIT EXTENSION 

     Asian Institute of Technology  

    IX. Dispute Management and Dispute 

    Resolution 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    105/106

     AIT EXTENSION 

     Asian Institute of Technology  

    a) Arbitration 

    b) ADR 

    c) Litigation 

    105 

  • 8/16/2019 Hydropower Financing Contractual and Energy Regulatory Frameworks Pakistan.pdf

    106/106

     AIT EXTENSION 

     Asian Institute of Technology  

    Thank you

     