HYDRO-AGRICULTURAL DEVELOPMENT PROJECT
OF THE IRRIGATION PERIMETER OF DAR KHROFA
REGIONAL OFFICE FOR AGRICULTURAL DEVELOPMENT OF LOUKKOS
OWNER ORMVA Loukkos
CONTRACTOR STAM
DURATION 2013 – Ongoing
APPLICATION Irrigation
MISSION
As part of the hydro-agricultural development project of
the irrigation perimeter of Dar Khrofa, located in the
province of Larache, AMITECH MAROC’s mission is the
supply and installation of GRP pipes for the conveyance
and distribution of raw water.
The implementation of the Dar Khrofa Dam and the hydro
agricultural development at its downstream are part of
efforts to pursue the development and enhancement of
the main economic activity of the region of Loukkos :
Agriculture. This development will be achieved through
the mobilization of new surface water resources and the
promotion of irrigated agriculture in the Green Morocco
Plan. The Dar Khrofa Dam, with a capacity of 480 million
m³, will regularize 140 million m³ per year, of which 130
million m³ / year as an agricultural annual allocation, to
ensure the irrigation perimeter.
The work area is part of the irrigation perimeter of Dar
Khrofa which consists of 12 sectors, with a total net area
of approximately 21 000 ha.
The GRP pipes used for this project have a total length of
99,50 Km, nominal diameters from 400 mm up to 3000
mm and a stiffness of 5000 N/m².
CASE
STUDY
Connection of the dam and regulating structure Penstock Tunnel
PROJECT INFORMATION
The works conducted are :
Digging a tunnel with 1200 m of length and 3.50 m of
diameter.
Supply, installation and sealing of a DN3000 mm GRP
pipe inside the tunnel.
Filling the space between the tunnel and the GRP
pipe with concrete.
l
GRP Pipe Details – Tunnel
TOTAL LENGTH 1,23 Km
DIAMETER DN 3000 mm
PRESSURE PN 10 bars
STIFFNESS SN 5000 N/m²
JOINT TYPES REKA
FITTINGS Elbow, Manholes,
Wye-Piece N°1
TRANSPORTED MEDIUM Raw water
INSTALLATION TYPE In the tunnel
STANDARDS AWWA C950 ; AWWA M45
ASTM D3517
PIPE TYPE Standard
WHY OUR PRODUCT ?
Competitive ; Resistance to
corrosion and abrasion; Light
weight ; Quick setup
Description Wye Piece N°1
The upstream Wye-piece is used for connection of two
DN1500 GRP pipes coming out of the dam and a DN3000
GRP pipe going towards the tunnel.
TOTAL LENGTH 10 m
DIAMETER DN 3000/1500/1500 mm
PRESSURE PN 10 bars
STIFFNESS SN 5000 N/m²
ANGULAR DEFLECTION 30°
JOINT TYPES Butt Wrap
Installation Details – Trench
TYPE Open trench
TRENCH WITDH 5,4 m
TRENCH DEPTH 7 m
NATIVE SOIL TYPE Soft Native soil
BACKFILL SOIL TYPE Extract excavations
THRUST BLOCKS Concrete coated parts
QUALITY MEASURES DURING INSTALLATION
Deflection measurements,
Compaction measurements
CASE
STUDY Connection of the dam and regulating structure Penstock Trench
PROJECT INFORMATION
The supply and installation of a penstock GRP pipe of
nominal diameter 3000 mm, connecting the downstream
exit of the tunnel and the block valve chamber.
Description Wye-Piece N°2
The installation of downstream bifurcation, which divides
the outgoing DN3000 pipe from the trench, into two
branches DN2200 (primary network for water supply).
TOTAL LENGTH 12,5 mL
DIAMETER DN 3000/2200/2200 mm
PRESSURE PN 10 bars
STIFFNESS SN 5000 N/m²
ANGULAR DEFLECTION 60°
JOINT TYPES Butt Wrap
GRP Pipe Details – Trench
TOTAL LENGTH 700 mL
DIAMETER DN 3000 mm
PRESSURE PN 10 bars
STIFFNESS SN 5000 N/m²
JOINT TYPES REKA
FITTINGS Elbow, Tees, Manholes,
Wye -Piece N°2
CASE
STUDY
Primary network for water supply of South
sectors
PROJECT INFORMATION
Supply and installation of pipes for the South Adduction
of the irrigation perimeter of Dar Khrofa. The adduction
pipelines carrying flow is 7,5 m3/s.
GRP Pipe Details
TOTAL LENGTH 24,6 Km
DIAMETER DN 1400/2000/2200 mm
PRESSURE PN 6 / 10 / 14 / 16 bars
STIFFNESS SN 5000 N/m²
JOINT TYPES REKA
FITTINGS Elbows, Tees, Flanges, Reducers
TRANSPORTED MEDIUM Raw water
INSTALLATION TYPE Buried
STANDARDS
AWWA M45
AWWA C950
ASTM D3517
PIPE TYPE Standard
WHY OUR PRODUCT ?
Competitive ; Resistance to
corrosion and abrasion ; Light
weight ; Quick setup
CASE
STUDY
Irrigation networks
DESCRIPTION
Supply and installation of GRP pipes and related works:
- Ouaed Cherkane - Bni Kmeh 2
- Vallée Makhazine - Maraa Kantra
- Koudiat Aabou - Reïssana Est
The carrying flow module adopted for the distribution
networks of these sectors is 0,94 l/s/ha.
GRP Pipe Details
TOTAL LENGTH 67,70 Km
DIAMETER DN 400/500/600/700/800/900
1000/1100/1200/1600 mm
PRESSURE PN 4 /6 / 10 / 14 / 16 bars
STIFFNESS SN 5000 N/m²
JOINT TYPES REKA
FITTINGS Elbow, Flange, Tees
TRANSPORTED MEDIUM Raw water
INSTALLATION TYPE Buried
STANDARDS
AWWA M45
AWWA C950
ASTM D3517
PIPE TYPE Standard
WHY OUR PRODUCT ?
Competitive ; Resistance to
corrosion and abrasion ;
Light weight ; Quick setup
Irrigation networks Substitution of existing pipes
DESCRIPTION
Replacement work of reinforced concrete pipes by GRP
pipes in the irrigation network of the sub-sectors A,
B1/B2 and E1/E2 falling within the R’Mel sector of the
Loukkos perimeter. The carrying flow module adopted
for the distribution networks of these sectors is 0,94
l/s/ha.
GRP Pipe Details
TOTAL LENGTH 5,30 Km
DIAMETER DN 400 / 500 / 600 / 1000 / 1100 mm
PRESSURE PN 16 bars
STIFFNESS SN 5000 N/m²
JOINT TYPES REKA
FITTINGS Elbow, Flange, Tees
TRANSPORTED MEDIUM Raw water
INSTALLATION TYPE Buried
STANDARDS
AWWA M45
AWWA C950
ASTM D3517
PIPE TYPE Standard
WHY OUR PRODUCT ?
Competitive ; Resistance to
corrosion and abrasion ;
Light weight ; Quick setup
Old reinforced
concrete pipe
New GRP pipe
CASE
STUDY