22
Hydramata Project Refresh March 10, 2014 Hydramata Project Refresh 1

Hydramata Project Refresh March 10, 2014Hydramata Project Refresh1

Embed Size (px)

Citation preview

Hydramata Project Refresh 1

Hydramata Project Refresh

March 10, 2014

Hydra Connect 2014 2

Why are We Here Again?

January 22, 2014

Hydramata Project Refresh 3

Where We Started

March 10, 2014

Hydramata Project Refresh 4

Our World is Different:Mixed Content and Formats

March 10, 2014

Hydramata Project Refresh 5

Mixed Landscape

ETD0 1 2 3

04

Infection Rate

Popu

la-

tion

Statistical Data

Image Data

Article

March 10, 2014

Video

Hydramata Project Refresh 6

Shifting Needs

March 10, 2014

Hydramata Project Refresh 7

Sustain through Community

DATA CURATION EXPERTS

March 10, 2014

HydramataIndiana

Northwestern

DCE Notre Dame

Cincinnati

Virginia

Hydramata Project Refresh 8

Faith and Commitment

March 10, 2014

Hydramata Project Refresh 9

In Sync

March 10, 2014

Hydramata Project Refresh 10

Curate Gem Mixed Architecture

March 10, 2014

Hydramata Project Refresh 11

Why a Name Change?

• Shared IR:– Are we sharing code or infrastructure?

• Curate– Mixed reviews as it means something different to

everyone– While a large focus, our vision stretches beyond

both curation of work and traditional IR

March 10, 2014

Hydramata Project Refresh 12

Our Vision Refreshed

• Flexible Configurations • Modularity• Extensibility• Wide Format Support• Support IR use cases• Swappable Viewers, Workflows• Other IntegrationsMarch 10, 2014

Hydramata Project Refresh 13

Hydramata

A set of separate hydra-based automata, “hydramata”, that can be combined to

form a single Hydra Head. Each hydramaton can be mixed and matched with other hydramata to provide wide

format support tailored to fit your institutional or digital repository needs.

March 10, 2014

Hydramata Project Refresh 14

Transformation

March 10, 2014

Hydramata Project Refresh 15March 10, 2014

Hydramata Project Refresh 16

Renewed Focus

• Links to institutional priorities and schedules• Balance between Sprint and Release Planning• More concrete release timelines and roadmap

March 10, 2014

Hydramata Project Refresh 17

Release Schedule

• April 15: Red Green Refactor• July 1: Transformation and Scale• November 1: TBD (Video, Exhibits, etc?)

March 10, 2014

Hydramata Project Refresh 18

April Release: Red Green Refactor

• Prepare for Refactoring• Create Stable Release Candidate moving us form

Red to GreenBefore refactoring we need our code clean and stable with an improved user interface, expanded testing, improved metadata, and free of major bugs. Therefore, this release will be focused on creating a stable release candidate that moves us from Red to Green to be ready for refactoring in the next release.

March 10, 2014

Hydramata Project Refresh 19

July Release: Transformation and Scale

Begin transforming and refactoring our single gem architecture into one that better fits our vision of a pluggable framework, and build in more scale of managing content. Where to further focus is being prioritized and discussed among the PD’s and PO’s.

March 10, 2014

Hydramata Project Refresh 20

Institutional Release Focus• April 15

– ND - Production Beta Update– UC - Baseline for Early Adopters Release– IU - First sandbox deployment for library staff– UVa - Test and analysis for further work

• July 1– NU – Research Scholarship Release 0.5– ND – 3rd Beta Release– Uva – Beta for Research Data– UC – Second Beta Release– IU Piolot Deployment for Research Data

• November 1– Uva – Expanded beta for Research Data– NU – 1.0 Production Release– ND – Full Campus Launch– IU – Expanded Data and Early Adopter Pilot– UC – Production Release

March 10, 2014

Hydramata Project Refresh 21

Other Changes

• Increased testing–Welcome to Chris DeLuca who will act

as the QA Lead starting March 17th!

March 10, 2014

Hydramata Project Refresh 22

Questions

?March 10, 2014