Hyderabad Traffic Integrated Management System

(HTRIMS)

IntroductionShri. C V Anand I.P.S

Additional Commissioner of Police, Traffic, Hyderabad

Hyderabad Traffic Integrated Management System

(HTRIMS)

IntroductionShri. C V Anand I.P.S

Additional Commissioner of Police, Traffic, Hyderabad

Page 2: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

2

• 26 lakh vehicles on road in Hyderabad, fourth largest in India, 33 lakh in GHMC limits

• 600 vehicles added every day

• Hyderabad has only 9% of city as road area as against 14%-18% in other metros

• Vehicle density 723 vehicles / km, second largest in the country

• Almost no foot paths -pedestrians

Hyderabad Traffic Context

Page 3: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

3

• 20 years old system• Standalone signals• Overhead cables / wiring• Poor condition of signal

aspects• Only 130 working out of

168• Insufficient : Primary –

Secondary aspects• No connectivity• No UPS• No ATC• No manual function

CRITICAL TO TRAFFIC MANAGEMENT

Hyderabad Traffic ContextPresent condition of Traffic signals

Page 4: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

4

HTRIMS - Project sanction and progress

• Concept and solution presented by Hyderabad Traffic Police to Hon’ble Chief Minister of A.P., Sri N.Kiran Kumar Reddy

• Hon’ble Chief Minister of A.P., sanctioned H-TRIMS project worth Rs.66.5 Crores

• Tender process by APTS• BEL won tender in Feb, 2012• Finance sanction in July, 2012• Agreement signed between BEL, GHMC, HTP on

18th Aug, 2012

Page 5: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

5

• First time 221 Signal junctions are automated and centrally

controlled

• First time with Vehicle Actuated Technology

• First time ATC (Area Traffic Control) with Synchronized

signal and Corridor management

• First time each road will have cameras to monitor the

traffic congestions, density

• First time Fall back Connectivity

First of its Kind Project

Page 6: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

6

• First time Fall back power management

• First time Green energy initiative

• First time Variable message boards across the city directing the traffic flows - 20 VMS

• First time project linked to SLA (Service Level Agreement) – Performance : Paradigm shift from “Concept to Contract”to “Concept to Service”

• First time Project managed with the support of third party professional management team (PMU)

First of its Kind Project

Page 7: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

7

Project scope

• Set up 221 new signals and provide signaling services round the clock at 221 Junctions (180 existing + 41 new) including 15 Secunderabad Cantonment Board Junctions in a span of 12 months in a phased manner

• Provide all 221 signals with non-stop Connectivity and Power with automatic fall back option to send data to the TCC

• Position Cameras at every junction to determine traffic flows continuously and manage the traffic intelligently – Integrating surveillance and violations

• Establish 20 Variable Message systems (VMS)

• Establish a IT enabled Traffic Command Center (TCC) to monitor all 221 Signal junctions to synchronize signals across the city forsmooth traffic flow

Page 8: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

8

Project scope• Equip the TCC with Video Wall to capture the traffic flows continuously

across the city

• To operate the signaling parameters remotely and/or manually fromthe Traffic Command Centre (TCC) / or at the signal post based on the existing traffic information.

• To monitor health of every signal point from the centralized Traffic Command Centre (TCC) to attend to the failures/ breakdowns through a robust IT solution that networks all signals.

• Create a Centralized Management Information System (MIS) as a part of the IT solution for faster decision making in traffic emergency such as heavy rain fall, accidents, terrorist attack, VVIP movements etc

• To train and manage the IT facility and offer back-end support on the operations of the TCC using the departmental manpower

Page 9: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

9

• Project is initiated by Department of Traffic Police and GHMC

• Technical process for selection of the partner by APTS

• Project Management and Technology advisory by ASCI

• Project Implementation by BEL

Partners in Progress

Page 10: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

10

Phase Milestone TimelinesI � Establish minimum 90 Junctions T + 140 days

� Establish TCC � Establish CCR � Establish 2 VMS Boards � Demonstrate IT solution

II � Establish additional 131 Junctions� Establish 18 VMS Boards � Demonstrate IT solution for additional signals T + 365 days

T : Starting date of the Project : 18th August 2012First time Incentive of 3% if project completed in 280 daysPenalty for non-delivery if project goes beyond 365 days

Project Phasing

Page 11: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

11

List of Locations for Phase 1

First Set of 50 Signals to be completed by September 30, 2012

Karbalamaidan Whisper Valley Jn

Rasoolpura Khajaguda Jn

YMCA Sec’bad. TCS X Roads Jn

SBH Cyber Gate Way Jn

CTO Masabtank Junction

Paradise Khaja Mansion

Ranigunj Road 1/12 Junction

Greenland MBNR ‘X’ Road Signal

Monappa Aramgarh

Sri Nagar colony T Jn Gachi bowli JN

KBR. Park HCU T Jn

Jubilee Hills Check Post.

Kothaguda T Jn

Madhapur PS Junction Kondapur jn

COD Junction Shilpa park T jn

VR Nagar Junction Silicon towers

Cyber tower Jn S.R. Nagar jn

Khanamet Jn Maithrrivanam jn

Children’s Park on the Upper Tank Bund

Shalimar j.n

Old Saifabad Junction Panjagutta j.n

Ayodhya Junction K.C.P. jn

Humayun Nagar Taj krishna jn

Rethi Bowli Rd.No. 1/10 Jn.

Naanal Nagar Junction Malaysian town ship Tolichowki Tajmahal jn Abids

O.P Raidurgam Jn GPO, Abids

MJ Market Jn. A1 Nampally

Taj Island Nampally Chapel Road

Traffic Complex (PCR) B.J.R.Statue

SBH, Gun foundry

Falling on COP-11 routes in Hyderabad and Cyberabad

Page 12: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

12

Variable Message Sign Boards (VMS)

Total Boards : 20 In Hyderabad : 15 In Cyberabad : 05

Page 13: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

13

S.No. Junction

1. Patny2. C.T.O. 3. Panjagutta4. V.V.Statue5. Jubilee Hills checkpost6. Traffic Control Room 7. Rethibowli8. RTC X Roads 9. Moosarambagh10. I.S.Sadan11. H.P.S. Begumpet12. M.J.Market13. Sangeeth X Roads 14. S.R.Nagar15. Bowenpally

VMS BOARDS LOCATION

S.No. Junction

1. Uppal X Roads

2. Kukatpally

3. Hi-Tech City

4. Aramghar X Roads

5. Gachibowli

HYDERABADCYBERABAD

Page 14: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

14

Example Police Control Room Jn.

Page 15: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

15

Page 16: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

Masab Tank JunctionPedestrians facility

• Exclusive Pedestrian

Signals ( All signals red)

• Concurrent Pedestrian

Signals

• Hooters for Pedestrian

Page 17: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

17

HTRIMS

Project Design and Managementby

Sri Y SubrahmanyamAdvisor – Administrative Staff College of India

HTRIMS

Project Design and Managementby

Sri Y SubrahmanyamAdvisor – Administrative Staff College of India

Page 18: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

18

VA Controller

VA Controller

Leased Line / Wireless

GPRS

Primary Comm.

Secondary / Fall Back Comm.

Network Cloud

Network Cloud

Hyderabad TCCHyderabad TCC

Blade Servers

SAN

Layer 3 Managed Switch

GPRS/GSM Cloud

GPRS/GSM Cloud

Video Wall 5X3

VMS Controller

VMS Controller

VMS

Work Station1

Work Station8

CYBERABAD TCCCYBERABAD TCC

Blade Server

Layer 3 Managed Switch

Work Station1

Work Station2

Leased Line 2 Mbps

Video Processor

Leased Line 512 Kbps

Video Loop Camera

Firewall

Solar Panel

HTRIMS - ArchitectureHTRIMS - Architecture

Page 19: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

PrimaryNetworkPrimaryNetwork

Junction - OverviewJunction - Overview

SMF

BATTERY

GridGrid Power SupplyPower Supply

Charge Controller

Charge Controller

Controller UnitController UnitVehicle DetectionVehicle Detection

512 Kbps

GPRSNetworkGPRS

NetworkSecondary Line

VMSVMS

Page 20: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

20

TCC - OverviewTCC - Overview

Video WallVideo Wall

SERVERSERVER

Work StationsWork StationsTraffic SurveillanceTraffic Surveillance

SANSAN

PrimaryNetworkPrimaryNetwork

GPRSNetworkGPRS

Network

UPSUPSNetworkingNetworking

Page 21: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

21

Traffic Command Center (TCC)

Page 22: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

HTRIMS Highlights

• 221 signals to be automated with central intelligent command center

• 221 signals enabled with Virtual loop cameras for Adaptive Traffic Control and synchronized signals

• Automatic adjustment of the signal timings based on the traffic flows and Adaptive Area Traffic control

• Automatic signal brightness control based on ambient light

Virtual loops

Speed detection

Page 23: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

HTRIMS Highlights• Integration in surveillance

on violations• Variable Message system

to alert the citizen on traffic flows and congestions

• Pedestrian controlled signals

• SMS based alerts to citizens

• Optimized traffic flow• Establishment of TCC

Integrated Surveillance

HTRIMS Highlights

Page 24: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

HTRIMS Highlights• Corridor Synchronization for optimized traffic flow

Note : International experience demonstrates Signal synchronization has 1. Improved average travel speed by 50%2. Reduced delays in road network by 35%3. Reduced fuel consumption by 22%

HTRIMS Highlights

Page 25: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate
Page 26: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate
Page 27: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

27

Traffic Management System - Major WorksTraffic Management System - Major Works

Page 28: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

28

Page 29: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

29

O & M – Methodology using CMS/FMS

O & M – Methodology using CMS/FMS

Page 30: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

30

Web based Complaint Monitoring

Web based Complaint Monitoring

Hyderabad Traffic Police

Page 31: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

31

HTRIMS

Technical Aspectsby

Sri D Ravi KumarProject Manager

Bharat Electronics Limited, Bangalore

HTRIMS

Technical Aspectsby

Sri D Ravi KumarProject Manager

Bharat Electronics Limited, Bangalore

Page 32: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

32

BEL - ITMS Scalable SolutionBEL - ITMS Scalable Solution

IP Cameras & Surveillance

System

IP Cameras & Surveillance

SystemNetwork Infrastructure

Network Infrastructure

Possible integration with

other data sources

Possible integration with

other data sources

Enforcement System

Enforcement System

VMS SystemVMS SystemServersServers

Video AnalyticsVideo Analytics

Traffic Control and ATCS System

Traffic Control and ATCS SystemCentral Control

and Management Software

Central Control and Management

Software

Page 33: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

33

Solution ArchitectureSolution Architecture

Video Processor

TLC AppDatabase

CRMVMS App

ATC Software

Video Analytics

Virtualization

Video Wall

Switch

Traffic Signal Surveillance Camera

Video Detection

Page 34: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

34

Online Status of JunctionsOnline Status of Junctions

HyderabadHyderabad

Page 35: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

35

Monitoring ScreenMonitoring Screen

Page 36: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

36

Monitoring CorridorMonitoring Corridor

Page 37: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

37

Day Plan ConfigurationDay Plan Configuration

PCR Jn.

Page 38: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

38

Day Plan ConfigurationDay Plan Configuration

PCR Jn.

KBR. Park

Rasoolpura

Greenland

COD Junction

Page 39: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

39

Synchronization FeatureSynchronization Feature

Karbalamaidan

Rasoolpura

YMCA Sec’bad.

SBH

CTO

Paradise

Ranigunj

Greenland

Monappa

Sri Nagar colony T Jn

KBR. Park

Jubilee Hills Check Post.

Madhapur PS Junction

COD Junction

Page 40: Hyderabad Traffic Integrated Management System · PDF file8 Project scope • Equip the TCC with Video Wallto capture the traffic flows continuously across the city • To operate

40

Pictorial view of Video loops at a JunctionPictorial view of Video loops at a Junction

Vehicle Actuated SignalVehicle Actuated Signal