DATE: PROJECT: Sample Project ADDRESS: MECHANICAL CONTRACTOR: ADDRESS: BUILDING DESIGNER: ADDRESS: MECHANICAL ENGINEER: ADDRESS: TABB FIRM: 602-370-4797 ADDRESS: 1478 South Pike Lane Gilbert, Arizona 85296 COMMISSIONING FIRM: 602-370-4797 ADDRESS: 1478 South Pike Lane Gilbert, Arizona 85296 HVAC SYSTEMS COMMISSIONING REPORT PAGE 1 General Comments Equipment List INTERNATIONAL CERTIFICATION BOARD / TESTING, ADJUSTING & BALANCING BUREAU CERTIFYING STAMP 2 3 4 5 PAGE PAGE Control Systems Checklists PAGE Manufactures Checklists and Start- Up Reports PAGE Start-Up Checklists Arizona System Analysis Professionals, LLC Arizona System Analysis Professionals, LLC INDEX

HVAC SYSTEMS COMMISSIONING REPORT

  • Upload
    others

  • View
    12

  • Download
    2

Embed Size (px)

Citation preview

Page 1: HVAC SYSTEMS COMMISSIONING REPORT

DATE:

PROJECT: Sample ProjectADDRESS:

MECHANICAL CONTRACTOR:ADDRESS:

BUILDING DESIGNER:ADDRESS:

MECHANICAL ENGINEER:ADDRESS:

TABB FIRM: 602-370-4797ADDRESS: 1478 South Pike Lane

Gilbert, Arizona 85296COMMISSIONING FIRM: 602-370-4797ADDRESS: 1478 South Pike Lane

Gilbert, Arizona 85296

HVAC SYSTEMS COMMISSIONING REPORT

PAGE

1 General Comments

Equipment List

INTERNATIONAL CERTIFICATION BOARD / TESTING, ADJUSTING & BALANCING BUREAU

CERTIFYING STAMP

2

3

4

5

PAGE

PAGE

Control Systems ChecklistsPAGE

Manufactures Checklists and Start-Up Reports

PAGE

Start-Up Checklists

Arizona System Analysis Professionals, LLC

Arizona System Analysis Professionals, LLC

INDEX

Page 2: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project

GENERAL COMMENTS

SMACNAHVAC SYSTEMS COMMISSIONING REPORT

1. The following items were incomplete or unresolved at the time of preparation of this report

A HOA for the boilers needs to be installed B DDC lighting controls not complete C Fire alarm shutdown not verified

1 of 81

Page 3: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project

UNIT NO. LOCATION AREA SERVEDEQUIPMENT NAME

SMACNAHVAC SYSTEMS COMMISSIONING REPORT

EQUIPMENT LIST

2 of 81

Page 4: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums, Ducts, & Coils Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely - All Dampers Open

MECHANICAL SERVICE CONNECTIONS - Coil piping & valves installed & tested - Condensate drains clear - Duct System Complete - Areas Clean - Misc. Components Complete (i.e., Humidifier)

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Safety Controls Operational - Control System Operational (or DDC Program) - Ready to Start & Run Under Control

START-UP INSPECTIONStart-up by Manufacturers RepresentativeMech., Elect. & Controls Contractors PresentFan Rotation Correct (Bump)Electrical Interlocks VerifiedFreeze Protection OperationalMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 101-AIR HANDLING SYSTEM-LIQUID HEAT/COOL

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENTITEM

WRITE_COMMENTS_HERE

3 of 81

Page 5: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums, Ducts, & Coils Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely - Gas Equipment & Venting Completed

MECHANICAL SERVICE CONNECTIONS - Gas piping & valves installed & tested - Condensate drains clear - Duct System Complete - Areas Clean - Misc. Components Complete (i.e., Humidifier)

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Safety Controls Operational - Control System Operational (or DDC Program) - Ready to Start & Run Under Control - Gas Train Controls Operational

START-UP INSPECTIONStart-up by Qualified Personnel (Gas Cert.)Mech., Elect. & Controls Contractors PresentFan Rotation Correct (Bump)Electrical Interlocks VerifiedFiring Sequence VerifiedFlame Safeguard Sequence VerifiedFreeze Protection OperationalMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

ITEM

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENT

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 102 - AIR HANDLING SYSTEM - GAS HEAT

WRITE_COMMENTS_HERE

4 of 81

Page 6: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums, Ducts, & Coils Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely - Refrigeration Section Completed - Balance Dampers Open

MECHANICAL SERVICE CONNECTIONS - Refrigerant piping & valves installed & tested - Water piping & valves installed & tested - Condensate drains clear & complete - Duct System Complete - Areas Clean - Misc. Components Complete (i.e., Humidifier)

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Safety Controls Operational - Control System Operational (or DDC Program) - Ready to Start & Run Under Control - Intergral Controls Operational

START-UP INSPECTIONStart-up by Qualified Personnel (Ref. Cert.)Mech., Elect. & Controls Contractors PresentFan Rotation Correct (Bump)Electrical & Control Interlocks VerifiedCooling Stages & Temperature Controls VerifiedIntegral & Safety Controls VerifiedFreeze Protection OperationalMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 103 - AIR CONDITIONING or HEAT PUMP SYSTEM - WATER

ITEM COMMENT

WRITE_COMMENTS_HERE

5 of 81

Page 7: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums, Ducts, & Coils Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely - Refrigeration Section Completed

MECHANICAL SERVICE CONNECTIONS - Refrigerant piping & valves installed & tested - Condensate drains clear - Duct System Complete - Areas Clean - Misc. Components Complete (i.e., Humidifier)

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Safety Controls Operational - Control System Operational (or DDC Program) - Ready to Start & Run Under Control - Integral Controls Operational

START-UP INSPECTIONStart-up by Qualified Personnel (Ref. Cert.)Mech., Elect. & Controls Contractors PresentFan Rotation Correct (Bump)Electrical & Control Interlocks VerifiedCooling Stages & Temperature Controls VerifiedIntegral & Safety Controls VerifiedFreeze Protection OperationalMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

ITEM

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENT

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 104 - PACKAGED AIR CONDITIONING SYSTEM

WRITE_COMMENTS_HERE

6 of 81

Page 8: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums, Ducts, & Coils Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely - Gas Equipment & Venting Complete - Refrigeration Section Completed

MECHANICAL SERVICE CONNECTIONS - Refrigerant piping & valves installed & tested - Gas piping & valves installed & tested - Condensate drains clear & complete - Duct System Complete - Areas Clean - Misc. Components Complete (i.e., Humidifier)

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Safety Controls Operational - Control System Operational (or DDC Program) - Ready to Start & Run Under Control - Refrigeration & Gas System Controls OperationalSTART-UP INSPECTIONStart-up by Qualified Personnel (Ref. & Gas Cert.)Mech., Elect. & Controls Contractors PresentFan Rotation Correct (Bump)Electrical & Control Interlocks VerifiedCooling Stages & Temperature Controls VerifiedFiring Sequence & Flame Safety SequencesIntegral & Safety Controls VerifiedFreeze Protection OperationalMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 105 - PACKAGED AIR CONDITIONING SYSTEM - GAS HEAT

ITEM COMMENT

WRITE_COMMENTS_HERE

7 of 81

Page 9: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums & Ducts Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely - All Manual Dampers Open

MECHANICAL SERVICE CONNECTIONS - Duct System Complete - Areas Clean - Backdraft Dampers Free To Operate

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Ready to Start & Run Under Control

START-UP INSPECTIONElectrical Contractor PresentFan Rotation Correct (Bump)Electrical Interlocks VerifiedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 106 - EXHAUST SYSTEM

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENTITEM

WRITE_COMMENTS_HERE

8 of 81

Page 10: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums & Ducts Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely

MECHANICAL SERVICE CONNECTIONS - Duct System Complete - (Areas Clean) - Return & Exhaust Dampers Operational

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Supply Fan Interlocks Operational - Ready to Start & Run Under Control

START-UP INSPECTIONElectrical Contractor PresentFan Rotation Correct (Bump)Electrical Interlocks VerifiedSupply Fan Interlock VerifiedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

ITEM

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENT

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 107 - RETURN AIR SYSTEM

WRITE_COMMENTS_HERE

9 of 81

Page 11: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums & Ducts Clean and Clear - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely

MECHANICAL SERVICE CONNECTIONS - Duct System Complete - (Areas Clean) - Outdoor Air Dampers Operational

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Fire System Interlocks Operational - Ready to Start & Run Under Control

START-UP INSPECTIONElectrical Contractor PresentFan Rotation Correct (Bump)Electrical Interlocks VerifiedFire System Interlocks VerifiedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 108 - PRESSURIZATION FAN SYSTEM

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENTITEM

WRITE_COMMENTS_HERE

10 of 81

Page 12: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Burner & Gas Train - Breeching & Combustion Air - Boiler Inspection & Chemical Treatment

MECHANICAL SERVICE CONNECTIONS - Water Piping & Valves Installed & Tested - Gas Piping & Valves Installed & Tested - Valves Positioned For Start-up

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Integral Controls Operational - Ready to Start & Run Under Control

START-UP INSPECTIONStart-up By Manufacturer's RepresentativeMech., Elect. & Controls Contractors PresentFiring Sequences VerifiedPump & Flow Interlocks VerifiedSafety Controls & Flame Safeguards VerifiedPressure & Temperature Gauges CheckedWater Temperature MaintainedLow Water Cutout VerifiedSafety Relief Valve TestedWater Temperature MaintainedCombustion Efficiency & Capacity TestVibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 109 - HOT WATER BOILER SYSTEM - GAS

ITEM

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENT

WRITE_COMMENTS_HERE

11 of 81

Page 13: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Burner & Oil System - Breeching & Combustion Air - Boiler Inspection & Chemical Treatment

MECHANICAL SERVICE CONNECTIONS - Water Piping & Valves Installed & Tested - Oil Piping & Valves Installed & Tested - Valves Positioned For Start-up

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Integral Controls Operational - Ready to Start & Run Under Control

START-UP INSPECTIONStart-up By Manufacturer's RepresentativeMech., Elect. & Controls Contractors PresentFiring Sequences VerifiedPump & Flow Interlocks VerifiedSafety Controls & Flame Safeguards VerifiedPressure & Temperature Gauges CheckedWater Temperature MaintainedLow Water Cutout VerifiedSafety Relief Valve TestedWater Temperature MaintainedCombustion Efficiency & Capacity TestVibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

ITEM

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENT

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 110 - HOT WATER BOILER SYSTEM - OIL

WRITE_COMMENTS_HERE

12 of 81

Page 14: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Preheating & Lubrication - Control Panel - Refrigerant Charge

MECHANICAL SERVICE CONNECTIONS - Condenser & Chilled Water Piping & Valves - Valves Positioned For Start-up

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Integral Controls Operational - Ready to Start & Run Under Control

START-UP INSPECTIONStart-up By Manufacturer's RepresentativeCertificate / Log ProvidedMech., Elect. & Controls Contractors PresentPump & Flow Interlocks VerifiedSafety Controls VerifiedPressure & Temperature Gauges CheckedWater Temperature MaintainedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Vibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 111 - CHILLER SYSTEM

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENTITEM

WRITE_COMMENTS_HERE

NOTE: This checklist is suitable to prepare most typesof chillers for start-up. Start-up Technician should followmanufacturer's equipment specific checklist and submitcopy for report.

13 of 81

Page 15: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely

MECHANICAL SERVICE CONNECTIONS - Piping & Valves Completed & Tested - Valves Positioned For Start-up - Water Treatment System Installed

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Control Interlocks Operational - Ready to Start & Run Under Control

START-UP INSPECTIONMech., Elect. & Controls Contractors PresentPump & Fan Rotation Correct (Bump)Electrical & Control Interlocks VerifiedLevel Control Tested & AdjustedCapacity Controls VerifiedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Vibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 112 - COOLING TOWER SYSTEM

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENTITEM

WRITE_COMMENTS_HERE

14 of 81

Page 16: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Alignment, Lubrication - Pump(s) Rotates Freely

MECHANICAL SERVICE CONNECTIONS - Piping & Valves Completed & Tested - Valves Positioned For Start-up - Strainer(s) Clean

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Control Interlocks Operational - Ready to Start & Run Under Control

START-UP INSPECTIONMech., Elect. & Controls Contractors PresentPump Rotation Correct (Bump)Electrical & Control Interlocks VerifiedCheck Valve TestedSystem Pressure AcceptableMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Vibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

ITEM

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENT

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 113 - CIRCULATING PUMP SYSTEM

WRITE_COMMENTS_HERE

15 of 81

Page 17: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Burner & Gas Train - Breeching & Combustion Air

MECHANICAL SERVICE CONNECTIONS - Water Piping & Valves Installed & Tested - Recirculation Pump Operational - Gas Piping & Valves Installed & Tested - Valves Positioned For Start-up

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Integral Controls Operational - Ready to Start & Run Under Control

START-UP INSPECTIONStart-up by Qualified Personnel (Gas Cert.)Mech., Elect. & Controls Contractors PresentFiring Sequences VerifiedSafety Controls & Flame Safeguards VerifiedSafety Relief Valve TestedTemperature Gauges CheckedWater Temperature MaintainedWater Recirculation VerifiedCombustion Efficiency & Capacity Test

PRE START BY: DATE:START-UP BY: DATE:

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 114 - DOMESTIC WATER HEATING SYSTEM - GAS

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENTITEM

WRITE_COMMENTS_HERE

16 of 81

Page 18: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Burner & Oil System - Breeching & Combustion Air

MECHANICAL SERVICE CONNECTIONS - Water Piping & Valves Installed & Tested - Recirculation Pump Operational - Oil Piping & Valves Installed & Tested - Valves Positioned For Start-up

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Integral Controls Operational - Ready to Start & Run Under Control

START-UP INSPECTIONStart-up by Qualified PersonnelMech., Elect. & Controls Contractors PresentFiring Sequences VerifiedSafety Controls & Flame Safeguards VerifiedSafety Relief Valve TestedTemperature Gauges CheckedWater Temperature MaintainedWater Recirculation VerifiedCombustion Efficiency & Capacity Test

PRE START BY: DATE:START-UP BY: DATE:

ITEM

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENT

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 115 - DOMESTIC WATER HEATING SYSTEM - OIL

WRITE_COMMENTS_HERE

17 of 81

Page 19: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Alignment, Lubrication - Pump(s) Rotates Freely - Control Panel

MECHANICAL SERVICE CONNECTIONS - Piping & Valves Completed & Tested - Valves Positioned For Start-up

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Control System Operational - Ready to Start & Run Under Control

START-UP INSPECTIONMech. & Elect. Contractors PresentPump Rotation Correct (Bump)Float Switches VerifiedLevel Alarms TestedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Vibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

ITEM

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENT

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 116 - SUMP PUMP SYSTEM

WRITE_COMMENTS_HERE

18 of 81

Page 20: HVAC SYSTEMS COMMISSIONING REPORT

PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:

OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Alignment, Lubrication - Pump(s) Rotates Freely - Control Panel

MECHANICAL SERVICE CONNECTIONS - Piping & Valves Completed & Tested - Valves Positioned For Start-up

ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)

CONTROL SYSTEMS COMPLETE - Control System Operational - Ready to Start & Run Under Control

START-UP INSPECTIONStart-up by Manufacturer's RepresentativeMech. & Elect. Contractors PresentPump Rotation Correct (Bump)Electrical Interlocks VerifiedCheck Valve TestedStart/Stop Operation VerifiedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Vibration & Noise Level Acceptable

PRE START BY: DATE:START-UP BY: DATE:

EQUIPMENT PRE-START & START-UP CHECKLISTSMS 117 - FIRE PUMP SYSTEM

SMACNA

GENERAL COMMENTS:

HVAC SYSTEMS COMMISSIONING - LEVEL 1

COMMENTITEM

WRITE_COMMENTS_HERE

19 of 81