HVAC for thermal test on CLIC prototype modules
in building 169
Preliminary design
F. Audinet, C. Martel : Cern GS-SE-HE
Wednesday, 25th July 2012
LocalisationCern Meyrin site – reference building 169-S-011
S-011
CLIC TUNNEL LAB
• Initial design (temperature control only)
CLIC TUNNEL LAB
CLIC TUNNEL LAB
HVAC PRINCIPLE (1)(T° + air speed)
Air transfer
100 cm
CLIC TUNNEL LAB
HVAC PRINCIPLE (2)
PROJECTS PARAMETERS• Preliminary design : July 2012.• Detail design: August 2012.• Installaltion October 2012.
• Estimated costs : 300 to 350 kCHF
CLIC TUNNEL LAB
HVAC DESIGN PARAMETERS• Internal heat dissipation: 6 KW• Number of people: 5• Variable airflow rate: from 5000 to 32000 m3/h• Variable air speed (central section) from 0.25 to 0.8 m/s• Ambient temperature: from 20 to 40°C• Fresh air inlet: 500 m3/h• Filtration class: F8
CLIC TUNNEL LAB