OWNER : DuPont Company (Singapore) Pte Ltd RFQ NO.: DPP-SI-Q-1037-C-006 PROJECT : SCP-2 Project WORK : Modules Fabrication BIDDER: Rev. : 0 PRICE SCHEDULES 2-8 Rate Total Rate Total Rate Total Rate Total i Notes a The quantities provided are are based on a current design of about 30% extroplated to be what is thought would be in the final package b Fabricator to insert unit rates for the work split into supply of Material / Equipment, Tax & Duty on Material / Equipment, Fabrication and final Assembly installation in the modules ii Notes iii Offload, take delivery of free issue items, protect, store and then install the following in Modules A Building & Process HVAC Equipment 1 Supply Fan AHU, Cooler Classifier 3101-510-01 1 No - - - - 2 Control Dampers, Cooler Classifier Main Units 3101-510-03 & 04 1 No - - - - 3 Water Scrubber, Die Exhaust 3101-530-01 (2,380 m³/h) 1 No - - - - 4 Die Exhaust Fan 3101-530-02 (2,380 m³/h) 1 No - - - - Approved vendors for all mounted fans are: FlaktWoos, Twin City, Mecomb, Mason, 5 Supply & install of Flame proof & Spark proof Wall Mounted industrial Exhaust Fan 3100-500-01 (3600 m³/h, Static pressure : 7.5 mm WC) Motor as per IEC suitable for 415V/50Hz/3Ph & Noise level shall be low. 1 No - - - - 6 Supply & install of Flame proof & Spark proof Wall Mounted industrial Exhaust Fan 3100-500-01 (5000 m³/h, Static pressure : 7.5 mm WC) Motor as per IEC suitable for 415V/50Hz/3Ph & Noise level shall be low. 1 No - - - - iv Supply and install of ducting with all acessories,flexibl e & fitting as per attached specifi cation requirement. Ductwork shall be by SubCon or OWNER approved equal. A Duct work, no insulation 304 Stainless Steel ducts - - - - - #REF! 0.8 mm thickness 40 - - - - - #REF! 1.0 mm thickness 130 m² - - - - - 5 Supply & install of S.S. 304 Canopy with capture hood velocity of 1.93 m/s (380 fpm ) for following Sizes : - - - - - 5.1 1100 mm X 300 mm X 450mm (H) 2 Nos - - - - - Item Description HVAC Work CP Buidling Total US$ Material Cost Assembly Cost Tax & Duty on Material Fabrication Cost Unit Qty 75780558.xls.ms office 1 of 3 HVAC

HVAC - CP Building (2)

  • Upload
    ajaykg

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HVAC - CP Building (2)

8/3/2019 HVAC - CP Building (2)

http://slidepdf.com/reader/full/hvac-cp-building-2 1/3

OWNER : DuPont Company (Singapore) Pte Ltd

PROJECT : SCP-2 Project

BIDDER:

PRICE SCHEDULES 2-8

Rate Total Rate

i Notes

aThe quantities provided are are based on a current design of about

30% extroplated to be what is thought would be in the final package

b

Fabricator to insert unit rates for the work split into supply of Material / 

Equipment, Tax & Duty on Material / Equipment, Fabrication and final

Assembly installation in the modules

ii Notes

iiiOffload, take delivery of free issue items, protect, store and then

install the following in Modules

A Building & Process HVAC Equipment

1 Supply Fan AHU, Cooler Classifier 3101-510-01 1 No -

2 Control Dampers, Cooler Classifier Main Units 3101-510-03 & 04 1 No -

3 Water Scrubber, Die Exhaust 3101-530-01 (2,380 m³/h) 1 No -

4 Die Exhaust Fan 3101-530-02 (2,380 m³/h) 1 No -

Approved vendors for all mounted fans are: FlaktWoos, TwinCity, Mecomb, Mason,

5

Supply & install of Flame proof & Spark proof Wall Mounted industrial

Exhaust Fan 3100-500-01 (3600 m³/h, Static pressure : 7.5 mm WC)

Motor as per IEC suitable for 415V/50Hz/3Ph & Noise level shall be

low.

1 No -

6

Supply & install of Flame proof & Spark proof Wall Mounted industrial

Exhaust Fan 3100-500-01 (5000 m³/h, Static pressure : 7.5 mm WC)

Motor as per IEC suitable for 415V/50Hz/3Ph & Noise level shall be

low.

1 No -

iv

Supply and install of ducting with all acessories,flexible &

fitting as per attached specification requirement. Ductworkshall be by SubCon or OWNER approved equal.

A Duct work, no insulation

304 Stainless Steel ducts -

#REF! 0.8 mm thickness 40 m² -

#REF! 1.0 mm thickness 130 m² -

5Supply & install of S.S. 304 Canopy with capture hood velocity of

1.93 m/s (380 fpm ) for following Sizes :-

5.1 1100 mm X 300 mm X 450mm (H) 2 Nos -

Item Description

HVA

Material Cost Tax & D

UnitQty

75780558.xls.ms_office 1 of 3

Page 2: HVAC - CP Building (2)

8/3/2019 HVAC - CP Building (2)

http://slidepdf.com/reader/full/hvac-cp-building-2 2/3

OWNER : DuPont Company (Singapore) Pte Ltd

PROJECT : SCP-2 Project

BIDDER:

PRICE SCHEDULES 2-8

Rate Total Rate Item Description

HVA

Material Cost Tax & D

UnitQty

CSupply & Installation of 304 Stainless Steel Manual Volume Control

dampers as per attached specification requirement.-

#REF! diam 500 mm 1 No -

#REF! diam 650 mm 1 No -

-

DSupply & installation of 304 Stainless Steel Manual Isolation dampers

as per attached specification requirement.-

1 diam 200 mm 3 No -

-

H Inspection hatches in ducts as per attached specification -

1 200x300 mm 18 No -

2 250x250 mm No -

3 300x300 mm No -

4 450x450 mm No -

-

J Pressure testing of ducts 1 Item -

-

L

Process Water Pipe for Water Scrubber, Die Exhaust (with

Insulation, Fittings, Supports, & Accessories) -

1 diam 25 mm 10 m -

-

M Duct Support & Bracket 3,000 kg -

-

v

Remove the following after testing, provide temporary infill and

protection of system / the work for shipping. Apply protection to

removed items and ship as loose items with the module.

1 Fabricator to list items of Equipment to be removed for shipping andinclude allowance.

Item -

-

vi Fabricator to list additional items required for this section

1 -

2 -

3 -

75780558.xls.ms_office 2 of 3

Page 3: HVAC - CP Building (2)

8/3/2019 HVAC - CP Building (2)

http://slidepdf.com/reader/full/hvac-cp-building-2 3/3

OWNER : DuPont Company (Singapore) Pte Ltd

PROJECT : SCP-2 Project

BIDDER:

PRICE SCHEDULES 2-8

Rate Total Rate Item Description

HVA

Material Cost Tax & D

UnitQty

vii Final Handover Documentation

1 Allow for providing Final Documentation on completion of the works 1 Item -

-

viii Testing

1 Allow for testing the installation prior to shipping 1 Item -

-

ix Temporary Supports

1 Allow for temporary supports to the works for shipping 1 Item -

-

x Temporary Protection

1 Allow for temporary protection of the works for shipping 1 Item -

SUB-TOTAL for Measured items to CP Building Summary -

Note :

Type Vendor/Make Remarks

Duct Ductwork subcon

Damper Connols’ Air, Kyodo Allied, R Glazen

Wall

mounted

fan

FlaktWoos, Twin City, Mecomb, Mason,

75780558.xls.ms_office 3 of 3