18
Town Hall Meeting March 20, 2013 Hutchison Corridor Improvements - East

Hutchison Corridor Improvements - East HCIE Town Hall Presentation... · Hutchison Corridor Improvements - East ... Project Location Map ... • Connects the campus to the Davis community

  • Upload
    lamnhan

  • View
    220

  • Download
    0

Embed Size (px)

Citation preview

Hutchison Corridor Improvements - East

Town Hall MeetingMarch 20, 2013

Hutchison Corridor Improvements - East

Hutchison Corridor Improvements - East

AGENDA

• Welcome!

• Project Description

• Schedule

• Questions?

Hutchison Corridor Improvements - East

DCM Contacts

• Jason Magness, Project Manager– [email protected]– 754-1105

• James Fong, Project Inspector of Record– 304-1414

• Ellen Ferdinand, Project Coordinator– 754-1052

Hutchison Corridor Improvements - East

Project Location Map

Project Location

Hutchison Corridor Improvements - East

Hutchison Drive

Multi-use Corridor• Major bike and pedestrian path of travel• Unitrans bus transit route• Emergency vehicle access• Service and delivery route• Connects the campus to the Davis community

Hutchison Corridor Improvements - East

Hutchison Drive

Challenges• Aged roadway• Bike and pedestrian crossing

concerns • Inadequate sidewalks

• Inconsistent landscape theme• Insufficient lighting• Stormwater piping challenges

Hutchison Corridor Improvements - East

Project Description

Landscaping Improvements

Pathways Improvements

Enhanced Pedestrian Crossings

Roadway Reconstruction

Hutchison Corridor Improvements - East

Landscaping Enhancements

• SCC and Chemistry 194

• Plaza Improvements, seat wall

• Bike Parking

Hutchison at California Ave

Hutchison Corridor Improvements - East

Enhanced Pedestrian Crossings• Mrak Mall to Shields Library• Olson Hall to Music Building• Elevated, level across street• Exposed aggregate with banding

Mrak Crossing

Hutchison Corridor Improvements - East

Pathway Improvements

Pathway Improvements• Exposed aggregate with banding

• Campus standard walkways

• Offset sidewalk from the road

• Planting around trees

• Decomposed granite in between

Hutchison Corridor Improvements - East

Roadway Reconstruction• New pavement• Realign S-curve • Increase width • Reduce slope• Curb and gutter replacement

Road Work

Hutchison Corridor Improvements - East

Impacts to Campus

• Bus, bike, and pedestrian detours

• Periodic road closure

• Loading dock access

• Noise

• Vibration

• Dust

Impacts

Hutchison Corridor Improvements - East

Schedule

Construction Schedule

• March 2013 to September 2013

• Hutchison closed to traffic – Spring & Summer Breaks

• Sidewalks and landscaping start end of March

• Roadwork late June - September

Hutchison Corridor Improvements - East

Phasing Plan

SHIELDS LIBRARY

SCCWALKER HALL

CHEMISTRYART

BUILDING

OLSON HALL

WRIGHT HALL

MUSIC BLDG

SPROUL

SOE

AOB4

SHIELDS AVE

A S

TRE

ET

CA

LIFO

RN

IA A

VE

Hutchison Corridor Improvements - East

Phasing Plan

SHIELDS LIBRARY

SCCWALKER HALL

CHEMISTRYART

BUILDING

OLSON HALL

WRIGHT HALL

MUSIC BLDG

SPROUL

SOE

AOB4

SHIELDS AVE

A S

TRE

ET

CA

LIFO

RN

IA A

VE

Phase I : March – June 2013

Hutchison Corridor Improvements - East

Phasing Plan

SHIELDS LIBRARY

SCCWALKER HALL

CHEMISTRYART

BUILDING

OLSON HALL

WRIGHT HALL

MUSIC BLDG

SPROUL

SOE

AOB4

SHIELDS AVE

A S

TRE

ET

CA

LIFO

RN

IA A

VE

Phase II : Early June – July/August

Hutchison Corridor Improvements - East

Phasing Plan

SHIELDS LIBRARY

SCCWALKER HALL

CHEMISTRYART

BUILDING

OLSON HALL

WRIGHT HALL

MUSIC BLDG

SPROUL

SOE

AOB4

SHIELDS AVE

A S

TRE

ET

CA

LIFO

RN

IA A

VE

Phase III : Late June – September 2013

Hutchison Corridor Improvements - East

Questions?