Hutchison Corridor Improvements - East
Town Hall MeetingMarch 20, 2013
Hutchison Corridor Improvements - East
Hutchison Corridor Improvements - East
AGENDA
• Welcome!
• Project Description
• Schedule
• Questions?
Hutchison Corridor Improvements - East
DCM Contacts
• Jason Magness, Project Manager– [email protected]– 754-1105
• James Fong, Project Inspector of Record– 304-1414
• Ellen Ferdinand, Project Coordinator– 754-1052
Hutchison Corridor Improvements - East
Hutchison Drive
Multi-use Corridor• Major bike and pedestrian path of travel• Unitrans bus transit route• Emergency vehicle access• Service and delivery route• Connects the campus to the Davis community
Hutchison Corridor Improvements - East
Hutchison Drive
Challenges• Aged roadway• Bike and pedestrian crossing
concerns • Inadequate sidewalks
• Inconsistent landscape theme• Insufficient lighting• Stormwater piping challenges
Hutchison Corridor Improvements - East
Project Description
Landscaping Improvements
Pathways Improvements
Enhanced Pedestrian Crossings
Roadway Reconstruction
Hutchison Corridor Improvements - East
Landscaping Enhancements
• SCC and Chemistry 194
• Plaza Improvements, seat wall
• Bike Parking
Hutchison at California Ave
Hutchison Corridor Improvements - East
Enhanced Pedestrian Crossings• Mrak Mall to Shields Library• Olson Hall to Music Building• Elevated, level across street• Exposed aggregate with banding
Mrak Crossing
Hutchison Corridor Improvements - East
Pathway Improvements
Pathway Improvements• Exposed aggregate with banding
• Campus standard walkways
• Offset sidewalk from the road
• Planting around trees
• Decomposed granite in between
Hutchison Corridor Improvements - East
Roadway Reconstruction• New pavement• Realign S-curve • Increase width • Reduce slope• Curb and gutter replacement
Road Work
Hutchison Corridor Improvements - East
Impacts to Campus
• Bus, bike, and pedestrian detours
• Periodic road closure
• Loading dock access
• Noise
• Vibration
• Dust
Impacts
Hutchison Corridor Improvements - East
Schedule
Construction Schedule
• March 2013 to September 2013
• Hutchison closed to traffic – Spring & Summer Breaks
• Sidewalks and landscaping start end of March
• Roadwork late June - September
Hutchison Corridor Improvements - East
Phasing Plan
SHIELDS LIBRARY
SCCWALKER HALL
CHEMISTRYART
BUILDING
OLSON HALL
WRIGHT HALL
MUSIC BLDG
SPROUL
SOE
AOB4
SHIELDS AVE
A S
TRE
ET
CA
LIFO
RN
IA A
VE
Hutchison Corridor Improvements - East
Phasing Plan
SHIELDS LIBRARY
SCCWALKER HALL
CHEMISTRYART
BUILDING
OLSON HALL
WRIGHT HALL
MUSIC BLDG
SPROUL
SOE
AOB4
SHIELDS AVE
A S
TRE
ET
CA
LIFO
RN
IA A
VE
Phase I : March – June 2013
Hutchison Corridor Improvements - East
Phasing Plan
SHIELDS LIBRARY
SCCWALKER HALL
CHEMISTRYART
BUILDING
OLSON HALL
WRIGHT HALL
MUSIC BLDG
SPROUL
SOE
AOB4
SHIELDS AVE
A S
TRE
ET
CA
LIFO
RN
IA A
VE
Phase II : Early June – July/August
Hutchison Corridor Improvements - East
Phasing Plan
SHIELDS LIBRARY
SCCWALKER HALL
CHEMISTRYART
BUILDING
OLSON HALL
WRIGHT HALL
MUSIC BLDG
SPROUL
SOE
AOB4
SHIELDS AVE
A S
TRE
ET
CA
LIFO
RN
IA A
VE
Phase III : Late June – September 2013