Humber LEP Area

Page 3: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

• Population – 921,000 (2012)• Economically active – 451,500 (June 2013)• Businesses – 32,500 (June 2013) • Majority SME’s• Businesses exporting – 12% (2012)• GVA - £14billion per annum,• Unemployment 7.2% (March 2015)

Core Stats

Page 4: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

Humber LEP – KEY ACHIEVEMENTS

• Supported over 200 businesses• Created 2,200 new jobs• 1000 businesses supported to improve skills• 5000 people trained in businesses• Gold Standard – CEIAG (Careers)• 300 Businesses signed to Skills Pledge

Page 5: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

• 20% of UK’s Natural gas• 27% of UK’s Refining capacity• 1/3 of UK’s Coal imported provide 17% of UK’s Electricity• BIO mass• Expertise in Energy Production, Storage and Handling.

Humber Energy Estuary

Page 6: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

Humber Enterprise Zone

At 484 hectares, equivalent to 780 football pitches, the Humber has the largest Enterprise Zone in the

country offering renewables sector Original Equipment Manufacturers (OEMs) and their supply chains the

opportunity to co-locate to make cost reductions on a major scale.

Page 7: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

Job Creation

The Zone’s ambition is to create 1995 direct jobs, and 1190 indirect in the next five years. By 2023 between

3500 and 8500 new jobs could be created in the region as a result of offshore wind opportunities.

To March 2015, 167 employment positions and 108 construction jobs have been created on the Humber

Enterprise Zone.

Page 8: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

Top 3 Reasons to Invest

• The largest Enterprise Zone in the UK, offering original equipment manufacturers and their supply chains the opportunity to co-locate.

• Ideally positioned for the manufacture, assembly and dispatch of turbines, with 3 of the UK’s largest North Sea wind turbine zones within easy reach.

• The Port of Grimsby is the closest major port to the network of wind farms off England’s east coast, and an important operations and maintenance centre.

Page 9: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

Site Map

Page 10: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

Incentive Site name Size (ha)Enhanced Capital Allowances

Green Port Hull 58Queen Elizabeth Dock South 20.33Able Marine Energy Park 225.9

Total 303Discounted Business Rates

Able Marine Energy Park 25.0Keystore 0.67Kingston Parklands 4.03Burma Drive 3.98Marfleet Environmental Technology Park 2.69Elba Street 1.94Valletta Street 3.24Rix & Kingston International Business Park 8.13

Total 49.68

Humber Renewable Energy Super Cluster EZ

Page 11: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

Available Incentives

• Up to 100% business rate discount worth up to £275,000 per business over a 5 year period, for businesses relocating before March 2018

• Simplified local authority planning, for example, through Local Development Orders

• 100% enhanced capital allowances (tax relief) to businesses making large investments in plant and machinery on investment made before March 2020

Page 12: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

Business Rates Retention

• All business rates growth generated by the Enterprise Zone is kept by the relevant local enterprise partnership and local authorities in the areas for 25 years to reinvest in local economic growth

• Potentially over £200m in revenue under optimum conditions over the 25 life span

Page 13: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

Humber Bridgehead

Page 14: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

Humber Bridgehead – Phase 1

Page 15: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

Humber Bridgehead – Phases 1 and 2

Page 16: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

Humber Enterprise Park - Brough

Page 17: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

17

The Humber

Key assets include:• Close to offshore wind farms• Deep water estuary and large

ports• Development land close to shore• Pre-existing infrastructure• Good communication routes• Incentives for development

Page 18: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

18

Key Locations for Developments in the Humber

Page 19: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

19

Hull• Greenport, Hull – ABP & Siemens

• £315m investment

• 1,100 direct jobs

• Assembly, Installation base and blade manufacture

Page 20: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

20

Key Locations for Developments in the Humber

Page 21: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

21

Able Marine Energy Park• 1.3km heavy lift quay

• Quay width 28m

• 2,135 acre land holding

• Berthing pocket 60m wide

• Quays and large land bank allow wind cluster and share services...reducing cost

• £450m investment

• Up to 4,100 new direct jobs

Page 22: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

22

Key Locations for Developments in the Humber

Page 23: HUMBER LEP PRESENETATION FOR 30 JUNE v1 (1)

Grimsby• Operations and

Maintenance cluster developing

• In the order of 400 direct jobs already created. Est. total 1,100

• Around £20m investment so far and in direct pipeline. More to come.