Human Resource Development in Nuclear Technology in Malaysia
byProf Dr Noramly Muslim
Universiti Tenaga Nasional(UNITEN), Malaysia
Roles of Tenaga Nasional Berhad (TNB):a. Largest publicly listed Utility Companyb. 28,000 personelc. RM 67.0 billion in assetd. Serving 7 million customerse. Core business…generation, transmission and distribution of electrical power.f. Diversified engineering activities through subsidiaries….manufacturing, consultancy, repair and maintenance, project management etc.g. Manages and operates transmission network, six thermal stations, 3 major hydroelectric scheme buys electricity from IPPs and renewable energy power producersh. University, R&D and Training Centre
…............ Tenagawan June 2009
NP DEVELOPMENT IN M’SIA & TNB (1)
NP DEVELOPMENT IN MNP DEVELOPMENT IN M’’SIA & TNB SIA & TNB (1)(1)
Towards Malaysia’s 1st Nuclear Power Plant:• 26 June 09 – Malaysian Cabinet decided to
include nuclear power as an energy option post year 2020 – establishment of a Nuclear Steering Committee with three Working Committees
• Cabinet also approved allocation of RM 25 million for planning and preparation over 3 years (2010 – 2012).
Towards Malaysia’s 1st Nuclear Power Plant (cont 1):
CABINET COMMITTEE ON ENERGY
PROGRAM DEVELOPMENT WORKING COMMITTEE
Malaysia Nuclear Agency
PROJECT DEVELOPMENT WORKING COMMITTEE
Tenaga Nasional Bhd. (TNB)
REGULATORY DEVELOPMENT COORDINATIONWORKING COMMITTEE
Atomic Energy Licensing Board (AELB)& Energy Commission (EC)
NUCLEAR POWER DEVELOPMENT STEERING COMMITTEEMinistry of Energy, Green Technology & Water
Source: Nuclear Malaysia - TNBR Report, 2009
Towards Malaysia’s 1st Nuclear Power Plant (cont 2):
MemberAELB
MemberEPU, PM
Dept.
MemberKeTTHA
MemberDOSH
MemberDOE
MemberPTM
MemberInvited members as and
when necessary
ChairpersonHead
Nuclear Energy Unit (TNB)
MemberMaritime
Dept.
MemberMalaysia Nuclear Agency
MemberSIRIM
JKPPK Membership (as of September 2009)
Alternate ChairmanSystem Planning (TNB)
SecretariatNuclear Energy Unit (TNB)
MemberEnergy Comm.
NUCLEAR ENERGY UNIT
FUEL CYCLE &HEALTH PHYSICS
TECH. ASSESSMENT & 3S COMPLIANCE
NPP SITING & LICENSING
� Front End Fuel Cycle/Assurance of Supply� Back End Fuel Cycle/� Radwaste Management� Health Physics/
Radiological Protection
� Technology Assessment� Safety, Security &
Safeguard (3S) Issues� Engineering� Quality Assurance � Pre-operation Tests� Grid Connection
� Legal & Regulatory F’work� Licensing� Communication/
Public Acceptance� Siting� Emergency Planning� EIA/RIA
Nuclear Energy Unit Responsibilities (as of 15 Dec 2008)
NP DEVELOPMENT IN M’SIA & TNB (3)
NP DEVELOPMENT IN MNP DEVELOPMENT IN M’’SIA & TNB SIA & TNB (3)(3)
Towards Malaysia’s 1st Nuclear Power Plant :
• 29 August 2008 – TNB Board agreed to form (a) Nuclear Energy Unit (b) Nuclear Pre-project team
• TNB board also approved RM2 million budget in for planning and preparation.
• June 2009 – TNB and KEPCO, Korea signed agreement for KEPCO to carry out a 12 month Nuclear Preliminary Feasibility Study – this includes training of TNB staff in nuclear technology
Collaboration – Within TNB:
Gen. Asset Development (GAD)
Corp. Comm. Dept.
TNB Research (TNBR)
Legal Dept.
HRM Dept.
Finance Dept.
System Planning
UNITEN
Stakeholder Mgt. & Comm. Strategy
Legal & Regulatory Framework (Act 304)Legal related matters
Manpower Development: Subject Matter Experts, Safety (OSHA) Training
Nuclear education
Funding &Financial Analysis
Economic & System Analyses
BOP, Project Mgt., Siting, Pre-FS, FS, QA Siting Study
Nuclear Energy Unit also acts as a one-stop centre to coordinate with TNB internal Departments and collaborate with external parties on nuclear matters
Nuclear Energy Unit Collaboration With Other TNB Departments
Collaboration – Within TNB (cont 1):Internal TNB Distribution in Nuclear Initiative
Collaboration – Within TNB:Internal Women Distribution in Nuclear Initiative
Collaboration – Within TNB (cont 3):UNITEN Distribution in Nuclear Initiative
Nuclear Energy Unit also acts as a one-stop Centre to coordinate with TNB internal Departments and collaborate with external parties on nuclear matters
Nuclear Energy Unit Collaboration – External Collaboration
IAEA
KEPCO/TEPCO
EnergyCommission
Atomic Energy Licensing Board
Ministry of Energy, Green Tech & Water
Malaysia NuclearAgency
NGOs & SUPPLIERS
INTERNATIONAL
IN-COUNTRY
Khazanah NasionalBerhad
HAPUA HR WG8 (Nuclear Power)
Asia Nuclear Safety Network(ANSN)
Forum for Nuclear Cooperation in Asia (FNCA)
REGIONAL
Ministry of Science, Technology &
InnovationMinistry of Finance
Economic Planning Unit
Collaboration – Outside TNB:
Malaysia Energy Needs:Malaysia Load Projection (2008 – 2030)
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Peak
Dem
and (
MW)
2007 Adopted Forecast 2008 Government 2008 Published Sources2008 TNB E-Council LOW 2008 TNB E-Council MOD 2008 TNB E-Council HIGH
14,000 MW (2008)
27,000 MW (TNB – Low)
44,000 MW (Gov)DEMAND FORECAST – 2008 ~ 2030
Peninsular HydroOil
Natural Gas
Coal
Bakun
Sarawak Import
Nuclear
0
50000
100000
150000
200000
1 97 61 9
7 81 9
8 01 9
8 21 9
8 41 9
8 61 9
8 81 9
9 01 9
9 21 9
9 41 9
9 61 9
9 82 0
0 02 0
0 22 0
0 42 0
0 62 0
0 82 0
1 02 0
1 22 0
1 42 0
1 62 0
1 82 0
2 02 0
2 22 0
2 42 0
2 62 0
2 82 0
3 0
Energ
y Gen
eratio
n (GW
h)
NuclearSarawak ImportBakunCoalNatural GasDistillateOilHydro
PROJECTIONHISTORICAL
Post 2020
Malaysia Energy Needs:Malaysia Generation Mix Forescast (until 2030)
21%
1%
25%
4%
49%
25%
0%
23%
6%3%
43%
20%
0%
4%
26%
3%
47%
1%
26%
25%
45%
3%2015121,000GWh
Natural Gas
Coal
Diesel
Hydro
Renewable
Nuclear
2025179,000GWh
2030211,000GWh
2020149,000GWh
Assumption: Nuclear in 2025 Source: EPU, PINE3 Seminar 2009
Malaysia Energy Needs:Malaysia Generation Mix Forescast (until 2030)
Activities to implement first
NPPPreparatory work for construction of a NPP after a policy decision has been takenConsiderations
before decision to launch nuclear power program is
takenReadiness to
include nuclear as a national
energy strategy option
PHASE 0 PHASE 1 PHASE 2 PHASE 3
Maint
enan
ce an
d con
tinuo
us
infras
tructu
re im
prov
emen
t
Infras
tructu
re de
velop
ment
prog
ramme
Pre-project Project definition Construction Ops
Policy decision
Investment feasibility study
Procurement process
Commissioning
Nuclear power is considered as a possible option
MILESTONE 0Ready to include
nuclear as realistic national energy strategy option
MILESTONE 1Ready to make
commitment to a nuclear
MILESTONE 2Ready to invite bids for
the first NPP
MILESTONE 3Ready to commission and operate first NPP
Pre-policy
2009 2013 2016 2018 2025
NPP Project Timeline
Investment analyses17
Source: TNB,Nuclear Roadmap For Malaysia, 2009
Proposed Malaysia Nuclear Roadmap:
Five step plan for the development of the nuclear power option (based on recommendations in the Energy Master Plan 2010-2030 Study by the Economic Planning Unit)
Operation
Pre-PolicyPre-Project
ProjectDefinition
Construction of Unit 1
Construction of Unit 22020 2027
Proposed Malaysia Nuclear Roadmap (cont 1) :
TNB Subsidiary – UNITEN• Universiti Tenaga Nasional (UNITEN) was established
in 1997 – benchmarked with University Indiana -University Purdue, Indianapolis, USA, (IUPUI)
• located in Kajang, Selangor – total number of students in 2008 was 7362 – international students in same year was 592
• Nov 2009 – started “Introduction to Nuclear Technology” – elective subject – Mech. Depart. final year students – open to students of other departments – response is overwhelming
TNB Subsidiary – UNITEN (cont 1)
as of 15 April 2008
UNITEN Student Intake (2000 – 2008)
Year
Tota
l Stu
dent
Num
bers
TNB Subsidiary – UNITEN (cont 4)Bil. pe ns y a ra h
M a ste rs
B a che l o
r
P h D
St af f N u mb er1 0 08 06 04 02 00
64
9
5 9
9
9 2
6 7
4 3
2 2
1 48
2
1 7
C l g. Engi neer i ngC l g. Busi ness ManagementC l g. Infor mati on T echnol ogy
C l g. Language Studi esC l g. Gr aduate Studi es
UNITEN academic staff in
Colleges
UNITEN UNITEN academic staff in academic staff in
CollegesColleges
TNB Subsidiary – UNITEN (cont 2)
306 1 9 27
2
4
52
47
14
2
2
74352
213
3
6
UNITEN International Students592 Total Students (2008)
IAEA Training
TNB Subsidiary – ILSAS• TNB Integrated Learning Solution Sdn. Bhd. (ILSAS) –
established in 1976 – main objective is to train TNB staff – it also conducts training for international customers e.g. Thailand & Indonesia.
• ILSAS facilities – power plant and distribution simulators, training workshops, Computer-based labs
• ILSAS trainers are certified by Institute of Training & Development, as well as recognised by Empower, New Zealand and Turbo Welding Institute, UK
� 300MW coal-fired simulator –replicates operation of Unit 3 Port Klang Power Plant�300MW Combine
cycle simulator –replicates operation of a unit in Connaught Bridge Power Station, Klang
TNB Subsidiary –ILSAS (cont 1)
TNB Subsidiary – TNBR• TNB Research Sdn Bhd (TNBR) – formed in 1993• to improve efficiency and reliability of power
system & reduce power delivery losses• seven fully equipped labs including (a) high voltage
lab (b) materials lab (c) water & air lab (d) geo-informatics lab
• TNBR is designated as the subsidiary responsible for NPP site selection and has identified 7 possible sites in Peninsular Malaysia
� High voltage AC test System
�High voltage impulse test system
TNB Subsidiary –TNBR (cont 1)
Other Agencies Human Resources (cont 1):• Atomic Energy Licensing Board (AELB) – training its
staff in safety, safeguard and security – as well as regulatory, multilateral agreements and protocols
• Ministry of Energy, Green Technology and Water (KeTTHA) – responsible for implementation of the energy protocol and acts as the service regulator
• Energy Commission (EC) and Energy Planning Unit (EPU) – under Prime Minister’s Office – will assist in implementation of the nuclear initiative – especially the introduction of nuclear power and transfer of nuclear technology
Other Agencies Human Resources:• Ministry of Higher Education (MOHE) – approved
Universiti Teknologi Malaysia (UTM) to start its undergraduate nuclear engineering programme –Universiti Sains Malaysia (USM) concentrates on health physics & nuclear medicine – Universiti Kebangsaan Malaysia (UKM) deals with nuclear science – Universiti Tenaga Nasional (UNITEN) will also handle nuclear engineering
• Malaysia Nuclear Agency (MNA) – responsible for public acceptance – plans to upgrade their Triga Mark II reactor for research and training
Other Agencies Human Resources (cont 1):• Atomic Energy Licensing Board (AELB) – training its
staff in safety, safeguard and security – as well as regulatory, multilateral agreements and protocols
• Ministry of Energy, Green Technology and Water (KeTTHA) – responsible for implementation of the energy protocol and acts as the service regulator
• Energy Commission (EC) and Energy Planning Unit (EPU) – under Prime Minister’s Office – will assist in implementation of the nuclear initiative – especially the introduction of nuclear power and transfer of nuclear technology
Summary• Malaysian government has not adopted a
nuclear policy but has made budgetary allocation to prepare for the possibility
• TNB (utility) and other agencies (government & GLC) are preparing their human resources to support the nuclear power option, once the government decides to go nuclear
• Government expected to decide by year 2013• Women are trained to be involved in the
Malaysian nuclear initiative
ThankYou