Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-1
www.huawei.com
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Capacity Planning
5/21/2018 Huawei GSM Capacity Planning
2/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-2
Page2Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Foreword
Capacity planning is very important of network QoS.
Good planning reduce further RNO work and capacity
expansion.
5/21/2018 Huawei GSM Capacity Planning
3/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-3
Page3Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Contents
1. Traffic Prediction
2. TCH Capacity Planning
3. SDCCH Capacity Planning
4. Capacity Enhancement Technology
5/21/2018 Huawei GSM Capacity Planning
4/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-4
Page4Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Traffic and Erlang
A is offered traffic, BHCis busy hour call times, tm is user
mean hold time, Tis 1Hr (3600s).
200 users call in busy hr, average holding time 180s, the
traffic is:
T
tBHCA
m*=
Erls
sA 10
3600
180*200==
5/21/2018 Huawei GSM Capacity Planning
5/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-5
Page5Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Traffic Prediction
In traffic prediction, we should consider many factors:
Population
Family income
Subscription ratio of fixed phone
National economy development
City construction
Future policy of fee
The network construction requires the consideration of economic feasibility andrationality. Therefore, a reasonable investment decision must be based on the predictionof the network capacity of the early and late stage.
5/21/2018 Huawei GSM Capacity Planning
6/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-6
Page6Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
TCH Traffic Model Example
32%24%24%24%Mobile-Fix
38%36%36%36%Fix-Mobile
30%40%40%40%Mobile-Mobile
Call Proportion
100%100%100%100%Subscriber Active Ratio
10%/ 10%10%/ 10%10%/ 10%10%/ 10%Roaming User In/Out Ratio
1.41.534.2Busy Hr Short Message Sending per User
1.52.03.24.6Busy Hr Short Message Receiving per User
1.41.71.71.4Average Handovers per Call
20%20%20%20%Second Paging Ratio
1.011.912.611.21Busy Hr Location Update Times
80%80%80%80%Successful First Paging Ratio
1.641.641.641.64Busy Hr Call Times
43485761Average Holding Time (s)
0.020.0220.0260.028Busy Hr Average Traffic per User
OthersAnshanDalianShenyang
Traffic ModelTraffic ModelItem
5/21/2018 Huawei GSM Capacity Planning
7/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-7
Page7Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Traffic Prediction
After predicting the total network traffic, then predict the
subscriber distribution.
Generally, base stations are constructed in urban areas,
suburban areas, and transport arteries.
At first, the subscribers in cities contribute most traffic. With
the development, the subscribers in suburban areas grows
fast.
In busy hr, the traffic of each subscriber is 0.025 Erl in urban areas and 0.020 Erl in
suburban areas.
5/21/2018 Huawei GSM Capacity Planning
8/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-8
Page8Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Considerations
For important areas, consider back up stations and TRX.
The dynamic factors, such as roaming ratio, subscriber
mobility should be considered.
For the areas of burst traffic, such as the play ground and
seasonal tourism spots, you must prepare backup
equipments (such as carriers and micro cells).
Prepare the some carriers, micro base stations for
emergency and future optimization.
5/21/2018 Huawei GSM Capacity Planning
9/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-9
Page9Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Contents
1. Traffic Prediction
2. TCH Capacity Planning
3. SDCCH Capacity Planning
4. Capacity Enhancement Technology
5/21/2018 Huawei GSM Capacity Planning
10/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-10
Page10Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Overview
According to different situation, we have two method for
planning: Fixed Site Locationand Fixed Frequency Reuse.
By Frequency Reuse:
The type of frequency reuse is given.
By Max Coverage:
The max coverage of cell is given.
By Frequency Reuse: The type of frequency reuse is given. It decides max TRXnumber of every cell. By traffic prediction, calculate max user number per cell. Accordingto the total traffic and user number, Obtain site and cell number.
By Max Coverage:By coverage planning, obtain the max coverage of one cell. By thetotal area of whole network, calculate the required cell number. By traffic prediction,
obtain the traffic of every cell, then calculate the TRX number.
5/21/2018 Huawei GSM Capacity Planning
11/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-11
Page11Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Basic Flow - By Frequency Reuse
Max Channel Number of Cell
Max User No. and Coverage by One Cell
Max TRX Number of Cell
Frequency Reuse Pattern
ErlangErlangB TableB Table
Site, Cell Number
Max Traffic (Erl) of Cell
Total user No. and trafficTotal user No. and traffic
Traffic DistributionTraffic Distribution
5/21/2018 Huawei GSM Capacity Planning
12/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-12
Page12Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
By Frequency Reuse (Cont.)
According to the bandwidth and allowed interference level,
get the acceptable reuse mode.
Obtain the max number of TRX in one cell, then one Site.
For example, there are 4.8MHZ: 7.2/0.2=36 frequency
If reuse density is 4X3: 36/(4*3)= 3 frequency, in other
word, each cell has 3 TRX
5/21/2018 Huawei GSM Capacity Planning
13/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-13
Page13Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
By Frequency Reuse (Cont.)
Each TRX has 8 channels. Obtain the voice channel
numbers by detracting the SDCCH required. Typically each
two TRX need a SDCCH.
For example, each cell 3 TRX, 2 SDCCH channels should
be configured. So total TCH are: 3X8=24 channels
24-1(BCCH)-2(SDCCH)=21 TCH channels
5/21/2018 Huawei GSM Capacity Planning
14/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-14
Page14Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
By Frequency Reuse (Cont.)
By number of voice channels and call loss ratio (generally
2% dense traffic areas), you can obtain the maximum traffic
of one cell by Erlang B table.
For example, 21TCH according 2% block rate, each cell can
support 14.04 erl.
5/21/2018 Huawei GSM Capacity Planning
15/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-15
Page15Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Erlang B Table
Erlang B table give the relationship between Channel
Number, Call Block Rate (QoS) and Traffic.
Block RateChannel
Number
30.66
23.83
16.19
9.730
3.738
2.960
5
34.5027.3425.5124.0136
27.0521.0419.4918.2229
18.6514.0412.8411.8621
11.478.2007.5326.66314
4.6662.9352.5012.1587
3.7582.2761.9091.6226
1021.00.5
5/21/2018 Huawei GSM Capacity Planning
16/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-16
Page16Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
By Frequency Reuse
If there are 1 million MS, and each MS traffic is 0.025erlduring the busy hour. So the whole traffic is 25000 erl
25000/14.04=1780.6 cells =1781 cells
5/21/2018 Huawei GSM Capacity Planning
17/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-17
Page17Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Basic Flow By Max Coverage
Channel Number of Cell
TRX Number of Cell
Traffic and User No. per Cell
Max Coverage per Cell
ErlangErlangB TableB Table
Traffic DistributionTraffic Distribution
Coverage PlanningCoverage Planning
Total Coverage of The NetworkTotal Coverage of The Network
Cell Number
5/21/2018 Huawei GSM Capacity Planning
18/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-18
Page18Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
By Max Coverage
By Coverage Planning, obtain the maximum coverage range
per cell.
By total area of the whole network, calculate cell number.
According to Traffic Prediction, decide how many user and
traffic in each cell.
With Erlang B table, decide the channel number required in
each cell.
Calculate the TRX number required in each cell.
InterferenceInterference
5/21/2018 Huawei GSM Capacity Planning
19/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-19
Page19Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Site Coverage Radius: R
Site distance: D=1.5RSite Coverage Area=1.949R2
Site Coverage Radius: R
Site distance: D=1.732RCoverage Area=2.598R2
3 Sectors site Omni site
Calculate the Coverage
5/21/2018 Huawei GSM Capacity Planning
20/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-20
Page20Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Erlang B Table
Erlang B table give the relationship between Channel
Number, Call Block Rate (QoS) and Traffic.
Block RateChannel
Number
30.66
23.83
16.19
9.730
3.738
2.960
5
34.5027.3425.5124.0136
27.0521.0419.4918.2229
18.6514.0412.8411.8621
11.478.2007.5326.66314
4.6662.9352.5012.1587
3.7582.2761.9091.6226
1021.00.5
5/21/2018 Huawei GSM Capacity Planning
21/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-21
Page21Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Practice
Suppose 100000 subscriber in city, 80% urban, 20%
suburban. Busy Hr traffic is 25/20mErl per user.
Frequency 10-50 is available.
Use3-sector site.
If by Frequency Reuse, BCCH use 4*3, TCH use 2*3. How
many TRX, cell, site is needed?
If by Max Coverage, max radius 1 km, total 300km2. How
many TRX, cell, site is needed?
5/21/2018 Huawei GSM Capacity Planning
22/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-22
Page22Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Practice
Suppose 100000 subscriber in city, 80% urban, 20%
suburban. Busy Hr traffic is 25/20mErl per user.
Frequency 10-50 is available.
Use3-sector site.
If by Frequency Reuse, BCCH use 4*3, TCH use 1*3. HR is
used here.1X3 and all the TRX can work in HR mode. How
many TRX, cell, site is needed?
5/21/2018 Huawei GSM Capacity Planning
23/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-23
Page23Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Contents
1. Traffic Prediction
2. TCH Capacity Planning
3. SDCCH Capacity Planning
4. Capacity Enhancement Technology
5/21/2018 Huawei GSM Capacity Planning
24/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-24
Page24Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
SDCCH Traffic Source
Location Update
Normal/Periodical 3.5 s/ times
Power Off/On
IMSI Detach/Attach 2.9/3.5 s/times
Call
Original/Destination 2.7/2.9 s/times
Short Message
Sending/Receiving 6.2 s/times
5/21/2018 Huawei GSM Capacity Planning
25/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-25
Page25Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
SDCCH Traffic Model (Cont.)
/2/22/22/2Point to Point ShortMessage (O/D)
/0.8/0.80.8/0.80.8/0.8Call Establish (O/D)
/0.20.20.2IMSI Attach/Detach
/222Periodic Location Update
Times/Busy Hr1.200.4Normal Location Update
UnitUnitBoundaryBoundaryInternalInternalNormal CellNormal CellEventEvent
Times in busy hourTimes in busy hour
5/21/2018 Huawei GSM Capacity Planning
26/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-26
Page26Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
SDCCH Traffic Model
52%48%50%SDCCH/TCH
mErl/user13.612.112.6Redundancy20%
mErl/user11.310.110.5Sum
mErl/user6.96.96.9Point to Point Short Message
mErl/user1.241.241.24Call Establish
mErl/user0.160.160.16IMSI Attach/Detach
mErl/user1.81.81.8Periodic Location Update
mErl/user1.200.4Normal Location Update
UnitUnitBoundaryBoundaryInternalInternalNormal CellNormal CellEventEvent
Consider TCH Traffic 25mErl/userConsider TCH Traffic 25mErl/user
5/21/2018 Huawei GSM Capacity Planning
27/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-27
Page27Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Other Considerations
The following steps is similar to TCH planning.
The traffic analysis of SDCCH is very difficult, normally
not accurate.
Commonly used configuration is 1SDCCH per 2TRX, a
value by experience.
Now we use the Dynamic SDCCH, which largely
expand the flexibility of SDCCH configuration.
5/21/2018 Huawei GSM Capacity Planning
28/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-28
Page28Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
TCH to SDCCH ConversionConversion Trigger:
Idle SDCCH < Idle SD Thrsh.
Resource CheckOngoing?
SDCCH + 8 10, all the channels in the cell can be
configured as TCHFs. TCH Traffic Busy Threshold can be
set to 100.
5/21/2018 Huawei GSM Capacity Planning
36/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-36
Page36Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Examples
According to the Erlang B table, when the traffic volume in
the cell is Y the number of channels required in the cell is 17and the number of TCHs required is 13.
Because 13 x 2 > 17 > 13, the number of TCHFs to be
configured in the cell is 9 (2 x 13 - 17) and other channels
should be configured as TCHHs.
TCH Traffic Busy Threshold is set to 70 (100 x [2 x 13 -
17]/13)
5/21/2018 Huawei GSM Capacity Planning
37/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-37
Page37Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Examples
Based on ERLANG B, if the traffic volume in the cell is Z,
the number of configured channels is 28 and the number of
channels that can be used as TCHs in the cell is 13.
Because 28 > 13 x2, all the channels in the cell should be
configured as TCHHs. At the same time, Huawei
recommends that a user should perform an expansion.
The TCH Traffic Busy Threshold is set to 0.
5/21/2018 Huawei GSM Capacity Planning
38/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-38
Page38Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Exercise
If cell A has 12 TCHs, traffic volume is 8.3 erl, the required
block rate is 1% ,so the TCH Traffic Busy Threshold is set
to ( ? )
If cell B has 10 TCHs, traffic volume is 16.2 erl, the required
block rate is 2% ,so the TCH Traffic Busy Threshold is set
to ( ? )
5/21/2018 Huawei GSM Capacity Planning
39/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-39
Page39Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
What is Co-BCCH cell In the same cellthere are 900M carriers and
1800M carriers, just one BCCH channel, only a CGI. Co-BCCH cell should be configured as concentric
cell
Overlaid subcell
Underlaid subcell
Concentric Cell (Co-BCCH)
Co-BCCH cell, also has some other names:
1Co-Cell
2Multiband Cell
3 900/1800 mix cell
5/21/2018 Huawei GSM Capacity Planning
40/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-40
Page40Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Dual BCCH cell: S3+S3
900M
1800M
CoBCCH cell: S3+3
20.08%31.941 3.4%27.316.624000OL: 3
10.717241UL: 3CoBCC
H
26.413.2201211800M:
3
13.220121900M: 3
Dual
BCCH
Trunking
Gain
Total
ErlErl
Available
TCHPDCH
SDCC
H
BCC
HTRX
Concentric Cell (Co-BCCH)
5/21/2018 Huawei GSM Capacity Planning
41/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-41
Page41Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Assignment GSM900M/DCS1800M Co-cell assignment must conform to the policies of
concentric cell. As the MS may be a non-dual-band one, the band supportingcapability of the MS must be judged before the channel assignment.
UnderlaidUnderlaidIncoming-to-BSC HO
Depend on Prefer subcell
in HO of intra BSCUnderlaidIntra-BSC HO
Depend on assign
optimum layerUnderlaidAssignment
UnderlaidUnderlaidImm-assignment
MS supports dual bandNot get the MS ability or MS
just support single bandAssignment
Type
When the MS supports the frequencies of both the overlay and underlay cells,assign the channel according to the channel assignment policy of the concentriccell. Otherwise, assign the channel in the overlay cell only.
5/21/2018 Huawei GSM Capacity Planning
42/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-42
Page42Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Configuration
When adding a new cellit should beconfigured as GMS900&DCS1800
5/21/2018 Huawei GSM Capacity Planning
43/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-43
Page43Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Configuration
5/21/2018 Huawei GSM Capacity Planning
44/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-44
Page44Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Configuration
5/21/2018 Huawei GSM Capacity Planning
45/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-45
Page45Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Others
Dual Band Network
900MHz -> 900MHz/1800MHz
DTX (Discontinuous Transmission)
Frequency hopping
5/21/2018 Huawei GSM Capacity Planning
46/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-46
Page46Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Summary
In this course, we have learned:
Traffic analysis and prediction
How to do TCH channel dimensioning
How to do SDCCH channel dimensioning
Capacity Enhancement Technology
5/21/2018 Huawei GSM Capacity Planning
47/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-47
Page47Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
Erl Table
5/21/2018 Huawei GSM Capacity Planning
48/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-48
Page48Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.
5/21/2018 Huawei GSM Capacity Planning
49/49
Capacity Planning
Confidential Information of Huawei. No Spreading Without Permission
P-49
Thank youwww.huawei.com