ECTP FA PICTECTP FA PICT 11 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007
FIATECH Capital Projects Technology Roadmap
FIATECH Capital Projects Technology Roadmap
Mapped with ECTP Focus Area Processes & ICTs (PICT)
& consolidated topics of all 7 Focus AreasMatti Hannus VTT
MappingMapping withwith FIATECH FIATECH roadmaproadmap 22 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
ww
w.fi
atec
h.or
gw
ww
.fiat
ech.
org
111 222 333 444 555
666
777
888
999
MappingMapping withwith FIATECH FIATECH roadmaproadmap 33 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
Knowledge sharingKnowledge sharingICT for transforming project experiences ICT for transforming project experiences into corporate assets. Object repositories.into corporate assets. Object repositories. IPR protection of complex shared data.IPR protection of complex shared data.
Context aware applications.Context aware applications.
Collaboration supportCollaboration supportICT tools for information sharing, project ICT tools for information sharing, project steering, negotiations, decision support, steering, negotiations, decision support,
risk mitigation, etc.risk mitigation, etc.
InteroperabilityInteroperabilityOntologies & open ICT standards for Ontologies & open ICT standards for
semantic communication.semantic communication. ICT infrastructures.ICT infrastructures.
ValueValue--driven driven business processesbusiness processes
ICT for customer centric product & serviceICT for customer centric product & service definition, requirement management & definition, requirement management & compliance assessment. Performancecompliance assessment. Performance
based contracting.based contracting.ICT enabledICT enabled business modelsbusiness models
New ways for sustainable exploitation ofNew ways for sustainable exploitation of ICT as a key part of business strategyICT as a key part of business strategy
in the open European / global in the open European / global construction marketplace.construction marketplace.
IntelligentIntelligent constructionsconstructions
Smart embedded systems & devices forSmart embedded systems & devices for monitoring and control. Embedded monitoring and control. Embedded
learning & user support.learning & user support.
IndustrialisedIndustrialised productionproduction
ICT for ICT for modularmodular provision of provision of customisedcustomised constructionsconstructions, , logisticslogistics, , assemblyassembly
& & servicesservices. Digital . Digital sitessites..
Digital modelsDigital modelsnD models. Access to life time nD models. Access to life time inforinfor--
mationmation for all stakeholders anywhere for all stakeholders anywhere anytime. ICT for design, configuration,anytime. ICT for design, configuration,
analysis, simulation, analysis, simulation, visualisation.visualisation.
Vision for Processes
& ICTs
ProcessEn
terp
rise
Prod
uct
Project
Main RTD themes of FA PICTMain RTD themes of FA PICT
Processes & ICTs (PICT) is one of the 7 Focus Areas of the ECTP (European Construction Technology Platform)
MappingMapping withwith FIATECH FIATECH roadmaproadmap 44 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
“9 critical elements” of FIATECH mapped with ECTP PICT roadmap “9 critical elements” of FIATECH mapped with ECTP PICT roadmap
3.3. Integrated, Automated Integrated, Automated Procurement and Supply NetworkProcurement and Supply Network 4. Intelligent & 4. Intelligent &
Automated Automated Construction Construction Job SiteJob Site
2. Automated 2. Automated DesignDesign
8. Technology8. Technology-- & & KnowledgeKnowledge-- enabled enabled WorkforceWorkforce
6. Real6. Real--time time Project and Project and Facility Facility Management, Management, Coordination Coordination and Controland Control
1. Scenario1. Scenario-- based based Project Project PlanningPlanning 9. Lifecycle Data Management 9. Lifecycle Data Management
& Information Integration& Information Integration
5. Intelligent 5. Intelligent SelfSelf--maintaining maintaining and Repairing and Repairing Operational Operational FacilityFacility
NANA
ECTPECTP MaterialsMaterials
KnowledgeKnowledge sharingsharing
CollaborationCollaboration supportsupport
InteroperabilityInteroperability
ValueValue--driven driven businessbusiness
processesprocessesICT enabledICT enabled
business modelsbusiness models
IntelligentIntelligent constructionsconstructions
IndustrialisedIndustrialised productionproduction
DigitalDigital modelsmodels
ECTPECTP PICTPICT
ProcessProcess
Ente
rpris
e
Ente
rpris
e
Prod
uct
Prod
uct
ProjectProject
7. New Materials, 7. New Materials, Methods, Products Methods, Products & Equipment& Equipment
The first mapping in October 2006 was made between FIATECH and ECTP Processes & ICTs
MappingMapping withwith FIATECH FIATECH roadmaproadmap 55 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
ECTP Implementation Action Plan (IAP): 9 priorities (incl. 55 topics) ECTP Implementation Action Plan (IAP): 9 priorities (incl. 55 topics)
A. Technologies for healthy, safe, accessible and stimulating indoor environments for all
B. Innovative use of underground space
C. New technologies, concepts and high tech materials for efficient and clean buildings
D. Reduce environmental and manmade impacts of built environment and cities
E. Sustainable management of transports and utilities networks
F. A living cultural heritage for an attractive Europe
G. Improve safety and security within the construction Sector
H. New integrated processes for the construction sector
I. High added value construction materials
Cities & Cities & buildingsbuildings
Quality of lifeQuality of life
Cultural Cultural heritageheritage
Processes Processes & & ICTsICTs
MaterialsMaterials
NetworksNetworks
Underground Underground constructionsconstructions
7 Focus Areas7 Focus Areas
MappingMapping withwith FIATECH FIATECH roadmaproadmap 66 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
55 topics of IAP55 topics of IAPA. Technologies for Healthy, Safe, Accessible and Stimulating Indoor Environments for All
A1. Improved Knowledge of Users NeedsA2. Harmonised Assessment MethodsA3. Ensuring a Design-for-all
B. Innovative Use of Underground SpaceB1. New Concepts: Integration Underground FunctionsB2. Retrofit and Upgrade of Existing Underground StructuresB3. New Tunnelling technologiesB4. Processes and ICTB5. Transparent Underground for 3-D Urban PlanningB6. n-D Modelling in TunnellingB7. New Materials
C. New technologies, concepts and high tech materials for efficient and clean buildingsC1. New concepts, technologies, design tools and business modelsC2. New and improved materials and structuresC3. Integrated design toolsC4. New information systemsC5. Environmentally friendly building material production
D. Reduce Environmental and Man-made Impacts of built environment and citiesD1. New concepts, processes and components for the reduction of damage to environmentD2. Sustainable design, construction, demolition and recycling processD3. Knowledge of energy and materials flowsD4. Reduction of impact of transport and utility networksD5. Reducing impact of accidents involving dangerous and hazardous goodsD6. Remediation and mitigation of contaminated soils and groundwaterD7. Re-using and re-cycling demolition debris and wasteD8. Construction technologies for the protection and exploitation of water resources
E. Sustainable Management of Transports and Utilities NetworksE1. New methods/tools for the comprehensive management of transport and utilities
infrastructure in urban and extra-urban context to reduce impact on serviceE2. Standards, models and databases to assess, follow and predict the long-term performance
of structures and components subject to ageing and deteriorationE3. New concepts to extend the life time of structures or increase their capacity, with no
reduction in safety and with positive impact on maintenanceE4. New testing methods for early detection of damages for structures and infrastructures,
even buried, with minimal impact on traffic and supplyE5. Develop, design, build and operate, with new or non-conventional multifunctional
materials or with traditional materials of enhanced performances, with low environmental impact, high durability, reduced maintenance and operation costs, and increased comfort for users and citizens
E6. Integrated life-cycle assessment systems combining cost-efficient and easy-to-maintain sensors, monitoring and performance prediction systems, and covering all stages of construction control, asset management, and optimisation of maintenance
E7. ICT and ITS systems to optimise traffic, serviceability and security of networks integrating traffic and transport monitoring and management, information to users, tolling, incident and crisis management
F. A living cultural heritage for an attractive EuropeF1. Building assessment, diagnosis and monitoringF2. Assessment of material decay and development of Cultural Heritage
compatible materialsF3. Low-intrusive retrofit and conservation techniquesF4. Integration in urban and natural environmentF5. Rational and long term management processesF6. New tools for European citizens interactionF7. Knowledge transfer to construction sector and demonstration of the
best-practice casesF8. Demonstration of knowledge gained from FP7 and other research
projects in selected typical CH sites across the EUG. Improve Safety and Security within the Construction Sector
G1. Harmonised design rulesG2. Risk and Safety Management SystemsG3. Systems for the management of risk and emergencies and partial
functionality of the networked systemG4. Reliable and long-life systems to monitor and control all
security/safety parameters of infrastructuresG5. Mitigation of natural and technical risksG6. Safety on construction work places
H. New integrated processes for the construction sectorH1. Value-driven business processesH2. Industrialised productionH3. Digital modelsH4. Intelligent constructionsH5. InteroperabilityH6. Collaboration supportH7. Knowledge sharingH8. ICT enabled business models
I. High Added Value Construction MaterialsI1. Multifunctional construction materialsI2. Predictable, flexible and efficient building material productionI3. Improve durability and reliability of construction materialsI4. Improve usability and applicability of materialsI5. Prediction and management of building material behavior in service
In order to identify inter-relations and opverlaps these application-oriented topics were re-grouped into technology-oriented categories.
Each topic to be addressed by several RTD projects.
MappingMapping withwith FIATECH FIATECH roadmaproadmap 77 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
5. Production methods
1. New business models
& services8. Knowledge
sharing
4. Life cycle management
2. Products
3. Monitoring & control
“9 critical elements” of FIATECH mapped with ECTP SRA IAP “9 critical elements” of FIATECH mapped with ECTP SRA IAP
3.3. Integrated, Automated Integrated, Automated Procurement and Supply NetworkProcurement and Supply Network
2. Automated 2. Automated DesignDesign
8. Technology8. Technology-- & & KnowledgeKnowledge-- enabled enabled WorkforceWorkforce
6. Real6. Real--time time Project and Project and Facility Facility Management, Management, Coordination Coordination and Controland Control
1. Scenario1. Scenario-- based based Project Project PlanningPlanning
4. Intelligent & Automated 4. Intelligent & Automated Construction Job SiteConstruction Job Site
7. ICT infrastructure
8 categories consolidated from
55 SRA IAP topics
ECTP = European Construction Technology PlatformSRA = Strategic Research AgendaIAP = Implementation Action Plan
This second mapping in August 2007 is between FIATECH and the whole ECTP IAP (55 topics consolidated into 8 categories).These 8 consolidated categories are a suggestion and not yet confirmed by the ECTP.
5. Intelligent 5. Intelligent SelfSelf--maintaining maintaining and Repairing and Repairing Operational Operational FacilityFacility
ECTP vision
Meeting user
requirements
Transfo
rming
the se
ctor
Becoming sustainable6. Materials
9. Lifecycle Data 9. Lifecycle Data Management Management & Information & Information IntegrationIntegration
7. New Materials, 7. New Materials, Methods, Products Methods, Products & Equipment& Equipment
Cross-links at detail level are not shown here. See the remaining slides.
MappingMapping withwith FIATECH FIATECH roadmaproadmap 88 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
1. Scenario-based Project Planning
1. Scenario-based Project Planning
Work Process MappingMap the Decision Process
Industry Tool SurveyProduct and Process Survey and Analysis
Reference Data RequirementsIndustry Costing Reference DataLifecycle Cost Reference DataIndustry Schedule and Quality Reference DataReference Information Model
Functional RequirementsDevelop Working Agreements As RequiredFunctional Requirements for Project Risk AssessmentFunctional Requirements for the User InterfaceFunctional Requirements for Modeling & Simulation Define “Grouping” Functionality for Analysis and OutputFunctional Requirements for Automated Scheduling and Facility Project DefinitionDefine Interfaces with Other Tools Next -generation Product Specifications
Data Model RequirementsData Modeling - Integration with Existing Data SourcesDefine the Data Model for SbPP Data in ALISDefine the SBPP Reference Data ModelCreate the Tools and Database Development Multi-Generation Plan
Design & Develop Next Generation Tools and Database
Write Software Application(s) and Create and Populate Database(s)Create and Populate the SbPP Reference ModelBeta Test the SbPPReference Model and ALIS Using the SbPP ApplicationImplementation Plan
Focus areaProject
ALIS:9. Asset Lifecycle
Information System
KnowledgeKnowledge sharingsharing
CollaborationCollaboration supportsupport
InterInter-- operabilityoperability
Life cycle management
Knowledge sharing
ICT infrastructure
MappingMapping withwith FIATECH FIATECH roadmaproadmap 99 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
2. Automated Design2. Automated Design
Metrics for Proof of Concept and Demonstration of Capabilities
Design ContestsCharrettesContractual Issue Improvements
Design ViewingViewing and Validation Requirements for Multi-party Design Views
Integrated and Interoperable Design SystemsDistributed Simulation EnvironmentCollaborative Requirements DefinitionAutomated AbstractionData ManagementInteroperability Requirements for Vendor Support of Automated DesignExtend Collaborative Environment to Include Suppliers & FabricatorsInteroperability Status Assessment and Gap AnalysisHandoff from Design to ConstructionCertification
Intelligent Design SystemsRule-based Intelligent Design SystemsRegulatory ComplianceArchitecture for Design AdvisorsAutomated Detailed Design SystemsAutomated Change ManagementDesign/Reuse CapabilityDesign Risk AssessmentIntegrity Assessment Based on DesignIntelligent Capital Projects Design Models
Create and Maintain a Design Automation Information Clearinghouse
Industry-wide Design Automation Knowledge Base
Focus areaProject
KnowledgeKnowledge sharingsharing
DigitalDigital modelsmodels
CollaborationCollaboration supportsupport
InterInter-- operabilityoperability
Life cycle management
Knowledge sharing
ICT infrastructure
ICT infrastructure
MappingMapping withwith FIATECH FIATECH roadmaproadmap 1010 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
3. Integrated, Automated Procurement and Supply Network
3. Integrated, Automated Procurement and Supply Network
Business cases for integrating the procurement and supply network
Integrated global supply chainsAutomated purchase order generation from specs and supplier-provided standard product modelsDeliveries sequenced and continuously updated to master project schedule, with pull-based automated replenishmentAutomatic generation of billing and invoicing based on work completionReal-time visibility into supplier performance, capacity, and progressAutomated change propagation
ValueValue--driven driven businessbusiness
processesprocessesNew
business models & services
MappingMapping withwith FIATECH FIATECH roadmaproadmap 1111 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
3. Integrated, Automated Procurement and Supply Network
3. Integrated, Automated Procurement and Supply Network
Integration of Engineering & Project Controls with Procurement
Definition of Work Processes and Systems for Engineering, Project Controls, Materials Handling and Labor TrackingProtocols for Engineering, Project Controls, Material Handling and Labor TrackingWork Process, Systems & Protocols for Procurement Process Financial InteroperabilityIntelligent Project Analyst
Supply Chain Information AccessAutomating Equipment Information Exchange (AEX)Protocols for Exchanging Fabrication InformationStandardized Supplier Documentation RequirementsStandardized On-line Capabilities for Supplier and Procurement CommunityAutomated Supplier Certification ProtocolsCustoms and Standards Knowledgebase
Integration of Procurement with Intelligent Job Site
Real-time material logistics: tracking and traffickingMaterials security and regulatory compliance streamliningOptimized job site materials managementIdentification and Management of Scarce and Long Lead Procurement Items
Evaluation of Supply Chain StructuresSupply-chain Performance MetricsModels for Risk/Value Management of Procurement ItemsDynamic Mapping and Simulation of Supply Chains
KnowledgeKnowledge sharingsharing
InterInter-- operabilityoperability
CollaborationCollaboration supportsupport
Focus areaProject
ValueValue--driven driven businessbusiness
processesprocesses
IndustrialisedIndustrialised productionproduction
New business models
& services
ICT infrastructure
ICT infrastructure
Knowledge sharing
Production methods
MappingMapping withwith FIATECH FIATECH roadmaproadmap 1212 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
4. Intelligent and Automated Construction Job Site
4. Intelligent and Automated Construction Job Site
Capabilities delivered Model-driven, highly sensed job site environmentContinuous visibility of performance vs. planAutomated, highly accurate capture of as-built data fed to Asset Lifecycle Information SystemHighly visible sequencing and schedules from multiple parallel activitiesAutomatic generation of work orders, resource allocations, and schedule with highly integrated material flowTechnology-enabled workers
IndustrialisedIndustrialised productionproduction
Production methods
MappingMapping withwith FIATECH FIATECH roadmaproadmap 1313 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
4. Intelligent and Automated Construction Job Site
4. Intelligent and Automated Construction Job Site
Standards and PracticesInformation Exchange Standards for Construction Planning and ExecutionWireless TechnologiesInformation Exchange Standards for Supplier IntegrationConstruction Work Package OptimizationConstruction Automation GuidelinesAutomated Onsite Component Fabrication (single commodity, e.g., piping)Pre-fabrication & Modularity (multiple commodities)New Connection Methods
Field Information SystemsInformation Display DevicesModeling and Simulation TechnologiesProject Progress and Site Monitoring SystemsReal-Time Sampling and Compliance Reporting for Turnover and Acceptance
Positioning and TrackingPersonnel Movement Monitoring and Facility UsageDynamic Site Materials Identification and Management with Supply Chain Visibility – Functional RequirementsLocal Area Position Recognition TechnologiesSurvey and Position TechnologiesSkills Certification
Construction Equipment and TechnologiesSensorsMulti-functional EquipmentMaterial Handling and InstallationProcess Piping and Structural WeldingRigging and Placement DevicesRFID
InterInter-- operabilityoperability
IntelligentIntelligent constructionsconstructions
Focus areaProject
IndustrialisedIndustrialised productionproduction
CollaborationCollaboration supportsupport
Production methods
Products
ICT infrastructure
ICT infrastructure
MappingMapping withwith FIATECH FIATECH roadmaproadmap 1414 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
5. Intelligent, Self-maintaining and Repairing Operational Facility
5. Intelligent, Self-maintaining and Repairing Operational Facility
Potential SolutionsTotally sensed and wired equipment, processes, systems, and facilitiesComprehensive capture of O&M and performance dataEnhanced processes and tools for extrapolating current facility state data to evaluate expected future stateAccurate modeling and high-fidelity visualization of options and issues in support of lifecycle actionsProvide flexibility to install new technologies for intelligent automation and control of facilities integrated with life safety systems
IntelligentIntelligent constructionsconstructions
Products
MappingMapping withwith FIATECH FIATECH roadmaproadmap 1515 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
5. Intelligent, Self-maintaining and Repairing Operational Facility
5. Intelligent, Self-maintaining and Repairing Operational Facility
Facility Condition AssessmentReal Time Facility Condition Assessment
Facility PerformanceLifecycle Facility Performance Modeling and SimulationAutomated Startup and Continuous Commissioning
Information ExchangeReal-time O&M Information ExchangeIntegration with the Asset Lifecycle Information System (ALIS)
Intelligent MaterialsSelf-Maintaining, Self-repairing Facility SystemsSensing Technologies for Building Performance
Catastrophic Event Mitigation and Recovery TechnologiesCatastrophic Event Mitigation and Recovery Technologies
Automated/Integrated Decommissioning and Demolition (D&D) Techniques and Technologies
Automated/Integrated D&D Technologies and Techniques
InterInter-- operabilityoperability
Focus areaProject
IntelligentIntelligent constructionsconstructions
Products
ICT infrastructure
MappingMapping withwith FIATECH FIATECH roadmaproadmap 1616 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
6. Real-time Project and Facility Mgt, Coordination and Control
6. Real-time Project and Facility Mgt, Coordination and Control
Intelligent Project Management SystemStandards for Project Information and Knowledge RepresentationProject Data/Information RepositoriesSelf-integrating Project Management SystemsIntelligent Project AnalystSecure, Accessible InformationReal-time Capture of Complex InformationBusiness Process Models
Streamlined, Knowledge- Driven Approval Processes
Improved Regulatory Process Review and ComplianceImprove Workflow Approval Process
Optimized Construction Sequence and Schedule
Automated Optimization of Construction Execution StrategiesSecure, Transparent Sharing of Construction Sequence and Scheduling DataInteroperability and Integration of Construction Sequence and Schedule Systems
Real-Time, Model Based Project and Facilities Control
Modeling FrameworkProject Information DatabaseTime and Execution ModelIntegration of Modeling System for Intelligent Project ManagementPerformance Tracking and Assessment System
Automated, Distributed Change ManagementGlobal Change Management ProtocolsDecision Support Tools for Change ManagementChange Management Modules
Automated Quality Assurance and Quality ControlDefects Analysis and UnderstandingQuality Metrics and Standards for Capital ProjectsAutomated Quality Status and Compliance Reporting
Integrated Stakeholder Business SystemsCommon Financial Vocabulary and Cost CodesAutomated Business Systems InterfaceShareable Capital Project Cost Model
Verification of Financial PerformanceReal Time Performance Capture
ValueValue--driven driven businessbusiness
processesprocesses
InterInter-- operabilityoperability
Focus areaProject
CollaborationCollaboration supportsupport
Monitoring & control
New business models
& services
ICT infrastructure
MappingMapping withwith FIATECH FIATECH roadmaproadmap 1717 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
7. New Materials, Methods, Products and Equipment
7. New Materials, Methods, Products and Equipment
Establish and Maintain the Materials and Methods Coordination RoleDefine the New Materials and Methods Coordination RoleSet Up the New Materials and Methods Coordination RoleEstablish the Mechanisms to Maintain the New Materials and Methods Coordination Role
Establish and Maintain the Materials and Methods Knowledge BaseEstablish a New Materials and Methods Knowledge BaseEstablish the Mechanisms to Maintain a New Materials and Methods Knowledge BaseEstablish the Mechanisms to Promote the Use of the Services Provided
KnowledgeKnowledge sharingsharing
IndustrialisedIndustrialised productionproduction
Focus areaProject
Materials
Production methods
Knowledge sharing
MappingMapping withwith FIATECH FIATECH roadmaproadmap 1818 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
8. Technology and Knowledge- enabled Workforce
8. Technology and Knowledge- enabled Workforce
Intelligent Maintenance Repository and AgentsSkills RedefinitionWorker EvolutionKnowledge-based Toolset DefinitionCollaboration for Workforce TransformationConstruction Knowledge Supply NetworkConstruction Knowledge Capture and Application SystemsIncentives and Rewards Definition
Technology Training ToolsNA
Professional Development TechnologiesOn-demand TrainingInteractive Work InstructionRuggedized Information Delivery SystemsWorker Certification and Verification Systems
Focus areaProject
KnowledgeKnowledge sharingsharing
Knowledge sharing
MappingMapping withwith FIATECH FIATECH roadmaproadmap 1919 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
9. Lifecycle Data Management & Information Integration
9. Lifecycle Data Management & Information Integration
Capabilities provided by the roadmapData transfer standards:Agreed protocols and standards for data transfer between knowledge-bases and/or applicationsStandard data formats:Transparent interoperability with all project information systemsSingle-point data capture:"Enter once, use many times", avoids re-entering data into different applications.Shared industry focused knowledge-base accessible from any location:Fast access to needed reference information reduces cycle times in all project processesDesign re-use knowledge base and component library:Fast access to re-usable information reduces cycle times in all project processesMaterials & methods knowledge base:Supports open sharing of Best Practices in directly useable formRegulatory knowledge base:Provides single-point access to all regulatory requirements.Homeland Security knowledge base:Provides single-point access to current security requirements and leading-edge solutionsIntegrated project applications framework:Enables interoperability of tools for planning, design, and project management. Connectivity to external databases and progress reporting tools:Auto-capture of applicable codes, standards, and regulatory requirements. Continuous, real-time visibility into supplier networks Continuously expanded and updated Asset Lifecycle Information System:Complete and accurate view of the design to any level of detail at any point in time. Fully accurate electronic as-built complete with facility simulations. Supports high-fidelity simulation.
InterInter-- operabilityoperability
ICT infrastructure
MappingMapping withwith FIATECH FIATECH roadmaproadmap 2020 Matti Hannus VTT Matti Hannus VTT –– 20 20 OctOct 2006 2006 –– 22 22 AugAug 20072007ECTP all ECTP PICTECTP PICT
9. Lifecycle Data Management & Information Integration
9. Lifecycle Data Management & Information Integration
Requirements and feasibilityIdentify Requirements
Technical Framework for lifecycle data management and information integration and interoperability
Definition and Plan for the Technical FrameworkDefine Smart Containers for Encapsulating Data/Information/KnowledgeData Transport MethodSmart Container Security and Access ControlOntologyStandards to Support Workflow Metadata and RulesStandards to Support Workflow Metadata and RulesValidate the Technical Framework through Multi-party Software Deployment
Shared or Common Knowledge-basesConventions for Knowledge-base ManagementStrategy for Knowledge-base Population and UpkeepDeploy Knowledge-bases and Populate Content
Asset Lifecycle Information System (ALIS) deploymentDetermine Business Approach to DeploymentDeploy an Asset Lifecycle Information System InstanceTraining and Technology Transfer
KnowledgeKnowledge sharingsharing
Focus areaProject
InterInter-- operabilityoperability
ICT infrastructure
Knowledge sharing