28
PETRONAS Carigali Information Management and Integrated Surface Life Cycle Tools ISO 15926 Integration and Interoperability 11th April 2007 FIATECH Annual Technology Conference Washington D. C. Yusoff Siraj

Document

  • Upload
    fiatech

  • View
    215

  • Download
    3

Embed Size (px)

DESCRIPTION

http://fiatech.org/images/stories/events/techconference/2007/Siraj_Petronas.pdf

Citation preview

Page 1: Document

PETRONAS Carigali Information Management

and

Integrated Surface Life Cycle Tools

ISO 15926 Integration and Interoperability

11th April 2007

FIATECH

Annual Technology Conference

Washington D. C.

Yusoff Siraj

Page 2: Document

Presentation Outline

PETRONAS – An Overview

PETRONAS Carigali Sdn Bhd (PCSB) Information Management (PCIM)

PCIM and Integrated Surface Life Cycle Tools (ISLCT)

PCSB’s Utilisation of ISO 15926 – Pilot Project ANGSI-D

Facilities Owner, EPC, Solution Integrators vs. Software Vendors

Summary

Page 3: Document

MISSION

We are a business entity

Petroleum is our core business

Our primary responsibility is to develop

and add value to this national resource

Our objective is

to contribute to the well being of the people

and the Nation

VISION

A Leading Oil and Gas Multinational Of Choice

PETRONAS

Page 4: Document

Source: Fortune 500 July 2005

Fortune Global 500:

The World’s Top Ten most profitable Petroleum Companies

Net Profit (USD Billion)

25.3

18.1

15.4

13.312.0

9.4 9.0 8.78.1

6.1

0.0

5.0

10.0

15.0

20.0

25.0

30.0

Page 5: Document

PETRONAS Carigali Sdn Bhd

Corporate Profile

PETRONAS Carigali Sdn Bhd

(PCSB)

Incorporated on 11 May 1978

as a wholly-owned subsidiary of PETRONAS

Formed to increase Malaysian participation

in the E & P industry in the country

Involved in all aspects of

petroleum exploration, development and

production activities

Actively expanding its activities overseas

Page 6: Document

PETRONAS Carigali Sdn Bhd

Malaysian Oil & Gas Fields

M’sia / Thai Development Area

PM3 Commercial Arrangement M’sia-

Vietnam

S A R A W A K

S A B A H

LNG PLANTS

PENINSULAR

MALAYSIA

Kangar

KUALA LUMPUR

Segamat

Kuantan

Kemaman

Kuala

Terengganu B R U N E I

Bintulu

S U M A T R A

(Indonesia)

K A L I M A N T A N

(Indonesia)

South China Sea

Kerteh

53 producing Oil Fields

22 producing Gas Fields (183 discovered)

750.000 barrel oil / day

5 billion cubic feet of gas per day

Page 7: Document

PETRONAS – An Overview

PETRONAS Carigali Sdn Bhd (PCSB) Information Management (PCIM)

PCIM and Integrated Surface Life Cycle Tools (ISLCT)

PCSB’s Utilisation of ISO 15926 – Pilot Project ANGSI-D

Facilities Owner, EPC, Solution Integrators vs. Software Vendors

Summary

Page 8: Document

1995

Hijrah initiative “Utilization of 3D CAD System”.

1996

2006

2005

2004

2003

1998

PDMS introduction in PCSB (Resak Development Project).

Implementation Web Portal (VFDC)

Common PDMS Cat’s & Spec’s for all Design Contractors

Intelligent PID’s (Sumandak Phase I)

Publishing ANGSI Platform in VFDC

PCIM Start

myCIS, XMpLant

Integrated Engineering and PCIM Initiative

1995 - 2006

Integrated Surface Life Cycle Tools (ISLCT)

and PCIM Initiative

in PETRONAS Carigali

Page 9: Document

FIATECH

Capital Project

Roadmap Vision

LCAIM Initiative

Malakoff, ALCIM

(Tanjung Bin Project)

NIST Report

GCR 04-867PCSB

Information

Management

(PCIM)

Initiative

Capital Facilities

Information

Handover Guide

POSC CAESAR

Projects

(e.g. IDS)

Shell, DOW, DuPont

Process Industry Data

Integration Strategy

Statoil

PIM Initiative

PCSB Information Management Initiative

Page 10: Document

PCSB Information Management

PCIM Guideline

PCIM Guideline

Standardized Information Requirements for Vendors and Contractors

based on ISO 15926, CFIHG and Petronas Technical Standards

(Processes, Structures, Data Models, Content, Forms, Formats)

Information

Management

Information

Systems

Information

Technology

Information

Handover

Document

Management

Structured

Data Models

Document

Content/Form

Information

Service

Provider

Information

System

Vendors

Umbrella

Design

Contractors

EPC/I/C

Contractors

Fabricators

Production

Sharing

Contractors

Page 11: Document

PCSB Information Management

PCIM Data Model Pyramid

ISO 15926, RDL

myCIS™ Data Model(International, Local, Industry Standards)

PETRONAS

Company

Requirements

(PCIM Guideline, PTS)

Project

specific

PCIM Data Model

• Structures

• Standards

• Content

•Workflows

• Forms

• Formats

10 % project specific

Configuration

90 % pre-configured

PCIM Data Model

PCIM Data Model Benefits:

OUT-OF-THE-BOX, No Customizing, Accelerated Implementation

Page 12: Document

PCSB Information Management

PCIM Information Stack for Integrated Engineering Applications

PCIM Data Model(Structure, Content, Workflows, Form, Formats)

Integrated Engineering Application Platform(e.g. AVEVA, Bentley, Intergraph, COADE, CEA)

CAD Application Platform(e.g. AutoCAD, Microstation)

Database Layer(SQL Server, Oracle, DB2, MySQL, MS Access)

Operation System Layer(Microsoft, Apple, Linux)

IT Infrastructure(Hardware, Network, Security, Accessibility)

PCIM Data Model = Mandatory for all Vendors and Contractors!

PETRONAS Contractors are free to choose the Application Platforms that works best for them!

Page 13: Document

PETRONAS – An Overview

PETRONAS Carigali Sdn Bhd (PCSB) Information Management (PCIM)

PCIM and Integrated Surface Life Cycle Tools (ISLCT)

PCSB’s Utilisation of ISO 15926 – Pilot Project ANGSI-D

Summary

Facilities Owner, EPC, Solution Integrators vs. Software Vendors

Page 14: Document

2D Schematics

Process Analysis

Electrical Analysis

Technical Data Warehouse

Integrated

Engineering Database

Integrated

Material Management

and Logistic

ERPIntegrated Project Management

Integrated

Document Management

System

2D/3D Plant Design

Structural Design

Analysis

Intelligent

Datasheets

Applications

PCSB Information Management

Overview – Integrated Surface Life Cycle Tools (ISLCT)

PCIM

Data Model

XML

Comparator

Managed Environments for Integrated Project Execution and O&M

VFDC (Web Portals)

XML, ISO 15926

Page 15: Document

PCIM Requirements for

Information Systems

• Software Vendor neutral IS Requirements

• “out-of-the-box”, no customizing

• Common PCIM Data Model

• Common Exchange Formats (XML)

• Neutral Archive Formats (XML)

• Common PCIM Break Down Structures

• Interoperability supported by ISO 15926

Integrated Project Control

Systems

ERP

Integrated

Operation

Maintenance

Systems

Integrated

Engineering

Systems

Document

Management

Systems

PCSB Information Management

for ISLCT Information Systems

Integrated

Surface

Life Cycle

Tools

(ISLCT)

Page 16: Document

PCIM Requirements for

Integrated Engineering Tools

• Common PCIM Data Model

• Interoperability cross disciplines

supported by ISO 15926 and XML

• Common Engineering Standards

(e.g. Designation Systems)

Plant Design

Instrumentation

Engineering

Process

Engineering

Mechanical

Engineering

Electrical

Engineering

PCSB Information Management

Requirements for Integrated Engineering Tools

ISLCT

for

Integrated

Engineering

PCIM

Data Model

Page 17: Document

PETRONAS – An Overview

PETRONAS Carigali Sdn Bhd (PCSB) Information Management (PCIM)

PCIM and Integrated Surface Life Cycle Tools (ISLCT)

PCSB’s Utilisation of ISO 15926 – Pilot Project ANGSI-D

Facilities Owner, EPC, Solution Integrators vs. Software Vendors

Summary

Page 18: Document

Facility Owner’s, EPC’s

Solution Integrators Software Vendor

Vendor specific & Non Standard

Data Models

Differentiation

to competitors

Vendor specific Exchange

Standards and Formats

Customizing

approach

Max TCO

for Information Systems & IT

Neutral and Industry Standard

Data Models

Open & Industry

Application Standards

Vendor neutral Exchange

Standards and Formats

“Out of the Box”

NO Customizing

Min TCO

for Information Systems & IT

Facility Owner, EPC’s , Solution Integrators vs. Software Vendors

Information Systems - Conflict of Interests

Page 19: Document

PCSB

PETRONAS Carigali Sdn Bhd

POSC CAESAR Member since 2006

ISO 15926

Data Model

Open & Industry

Application Standards

Neutral

Exchange Standards

and Formats

Open Standards

for

Attributes (RDL)

Classification

Datasheets

Common

Handover Requirements

POSC

CAESAR

ALCIM

Noumenon

AVEVA

Bentley

Intergraph

FIATECH

AspenTech

COADE

PETRONAS supports the POSC CAESAR and FIATECH

Industry Standard Data Model Vision

Page 20: Document

PETRONAS – An Overview

PETRONAS Carigali Sdn Bhd (PCSB) Information Management (PCIM)

PCIM and Integrated Surface Life Cycle Tools (ISLCT)

PCSB’s Utilisation of ISO 15926 – Pilot Project ANGSI-D

Facilities Owner, EPC, Solution Integrators vs. Software Vendors

Summary

Page 21: Document

� Accelerated Implementation

� 4 weeks Implementation

� Standardized Data Model

� no customizing, out-of-the-box

�Integrated Engineering Approach

� One common Data Model for

� Process

� Instrumentation

� Electrical

� 3D Plant Design

� 15926 / RDL Utilization

� Object Classification

� RDL Attributes

� neutral Data Model & Formats

� XMpLant Comparator

� VNET Portal

� myCIS IEA Data Model

PCIM Pilot Project ANGSI-D (Detail Design Phase)

Success Story for ISO 15926 Implementation

Page 22: Document

Process

Electrical

Instrumentation

PCIM, myCIS

ISO 15926

Data Model

PID’s

PFD’s, UFD’s

Loop’s

Termination Wiring’s

Hook-up’s

SLD’s

Circuit Diagram’s

Cable List’s

Junction Box List’s

Datasheets

3D

Plant Design

Data ModelGeneral Arrangements

Isometrics

Overall TAG List

2D-3D

Comparison

XMpLant

ISO 15926

Data ModelPlant Design

Piping Design Comparison Reports

PCIM Pilot Project ANGSI-D (Detail Design)

Integrated Engineering Implementation

Page 23: Document

myCIS™ IEA

Engineering

Database

PID

myCIS™ XMC

XMpLant

Comparator

3D Plant

Design

(PDMS)

PCSB Virtual Facilities Data Centre

(Web Portal)

myCIS™ XIS

XMpLant Exchange Interface Structure

SVG Reg ZGLpdfXML

15926/RDL Utilization

�Object Classification

� RDL Attributes

� XML Adaptors

� XMpLant Comparator

� Web Portal (VNET)

� myCIS IEA Data Model

PCIM Pilot Project ANGSI-D (Detail Design)

ISO 15926/RDL Utilization

Page 24: Document

PCIM Pilot Project ANGSI-D – Engineering Documents

Visualization in Virtual Facilities Data Center

ISO 15926 Classification

Intelligent

Datasheets

Wiring

Diagrams

Loop

Diagrams

Hook-ups

Isometrics

General

Arrangements

Cable Block

DiagramsInstrument

Schedules PID’s

Page 25: Document

PETRONAS – An Overview

PETRONAS Carigali Sdn Bhd (PCSB) Information Management (PCIM)

PCIM and Integrated Surface Life Cycle Tools (ISLCT)

PCSB’s Utilisation of ISO 15926 – Pilot Project ANGSI-D

Facilities Owner, EPC, Solution Integrators vs. Software Vendors

Summary

Page 26: Document

PETRONAS Carigali Sdn Bhd Information Management

Summary

• ISO 15926, RDL, CFIHG are key elements for PCSB’s Information

Management Strategy

• PCIM Requirements & Rules defined in the PCIM Guide will be

mandatory for all new green field projects

• PCIM Data Model will be mandatory for all application platforms and

Information Systems

• PETRONAS supports ISO 15926, Standardization and Open Sources

Let’s speed up!

Page 27: Document

Thank you!

[email protected]

Page 28: Document

PCIM Pilot Project ANGSI-D – Engineering Documents

Vendor neutral Visualization in Virtual Facilities Data Center