Overview of China NPPs
Statistics data for all Chinese NPPs: Operating NPPs:
21 units 19.0 GWe (2.2% of total installed capacity)
NPP Under construction: 27 units 29.5 GWe
Up to Aug. 2014
2
Overview of China NPPs
Recent news: Oct.9 2014: Government announced
Hongyanhe unit #2 commercial operation since May 13 2014
Oct.21 2104: Fangjiashan unit #1 reached first criticality
3
Overview of China NPPs
Recent news: Chinese government launched project for
preparation of 13th 5-years plan (implementation will be started from 2016) For all aspects For nuclear power: how many new
construction, R&D plan, … HTR will be in the list
4
HTR-PM demonstration plant
HTR-PM: High temperature gas cooled reactor—pebble-bed module
HTR-PM main features Modular HTR with pebble bed core
Inherent safety, small size of power, capable of process heat application
2 reactors with 1 steam turbine 200MWe
One kind of SMR5
Site for HTR-PM85公里。
6
Plant overview
7
HTR-PM development team As one of national key technology projects, including
research, design, licensing, manufacturing, construction, fuel fabrication, operation, test,…, with many partners
Government
HSNPCOwner of HTR-PM Demonstration Plant
Established in 2006
Chinergy Co.Contractor of Nuclear Island (EPC)
Established in 2003
INETR&D, general design, design of key components in reactor plant
8
Recent progress
Design 2004: Started standard design 2008: Finished basic design 2009: Started engineering design
Manufacturing of key components 2008: Signed the contract -now: almost finished
Licensing 2008-2009: PSAR assessment 2016: FSAR assessment 9
Recent progress
Construction 2008: site preparation 2012.12.9: FCD -now: building reach to 14.5m
now: installation was started in parallel 2017: connect to grid
10
11
Recent progress
Experiments 2010: building of LAB finished 2012: 10MW helium test loop finished -now: many experiments on schedule
Test of components and systems in fullscale: CRDM, SAS, blower, SG, FHSS, …
For licensing: pebble flow, pebble bedconductivity, hot gas mixing, graphitecorrosion, graphite dust, seismic of graphitestructure, operation of HTR-10, …
12
Recent progress
Fuel fabrication 2010: Experimental production line 2012: irradiation samples 2013.6: building of plant finished 2014.3: Installation of equipment 2015: production
Power plant operation 2017:
13
PHOTO for HTR-PM FCD
Dec.9, 2012
14
Photo of April 9,2014
15
Photo of Aug.21, 2014
16
Photo of Oct.31, 2014
17
Photo of Oct.31, 2014
During HTR2014
18
Conclusion remarks
HTR-PM demonstration plant progresses well
HTR-PM demonstration plant scheduled to operation in the end of 2017 Although big pressure for designers,
manufacturers, workers,… International cooperation is valuable, like
this CRP
19