Section 14: Technical Specification for AC HT cables, LT Power Cables, DC Power cables and control cables, cable racks, supports, trays & accessories.
Sr.No. Clause Comments of SJVN Replies after receipt from WAPCOS
1 14.1.1 (iii) As per tender drawing SLD, 11kV
System is not provided at Dam site, in
such case, requirement of 11kV Aerial
Bunch cable (ABC) at Dam Site may
be clarified.
Ok. Kindly modify the
relevant clause.
2 14.5.2 & 14.5.3 Armoring for cables has been
elaborated in clause 14.3.7 but in
these clauses the choice of Armoured/
unarmoured has been provided.
Contradiction may be clarified.
Ok. Kindly modify the
relevant clause.
3 14.6.3 The incorporation of text as ‘In addition, “THPA- Bhutan” shall also be printed at every 3 meter run’ may be clarified.
Ok. Kindly modify the relevant clause.
4 14.8 The supporting document shall be
submitted for proposing the various
kind of test to be performed for cables
to be supplied.
It is required to kindly
submit the relevant
standard.
5 14.10.4 As per the TS clause 14.4.1.3 straight
through cable joints are to avoided
whereas special clause has been
elaborated for straight through cable
joints, contradiction in the clauses
shall be clarified.
Ok
6 14.14 The necessity of this clause i.e.
WASTAGES shall be clarified as
bidder to provide all item in this
specification for completeness of
system.
Ok. Kindly modify the TS
accordingly.
7 14.21 (i) Schedule of Requirement envisages
optical fiber cable but there is no
clause in the specification & its usage.
Same shall be clarified.
It is required that the usage
and its specification shall be
added in the Technical
specification.
1