HeSaWater Converting energy to profit
November 2014
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited 2
| A energy optimisation provider with novel saving solutions
| Founded in 2008
| LED lighting manufacture with energy optimization solutions in other areas
| Danish design and quality assurance.
| 100% Danish company owned by management
| Headquartered in Roskilde, close to Copenhagen
| Production in Denmark, Taiwan, South Korea, China.
State-backed financing through partnership with the Danish Export Credit Agency
Mission: To develop, produce and sell high-quality energy efficiency solutions for the professional market with the lowest total cost of ownership.
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited 3
Worldwide operations: 28 countries — 75 local agents
Headquarter
Local company
Production
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited
Denmark’s Export Credit Agency
“HeSaLight, a Danish lighting company, has developed LED lighting. We save energy, you get a cleaner environment - more export revenue and jobs. Grants for green projects work. We have put a half billion crowns for the development of green technology, for example in the form of green loans and grants for green projects”. Prime Minister Helle Thorning-Schmidt, May 2013
4
Technical University of Denmark World’s Largest Pump Manufacturer
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited
HeSaLight serves a wide range of customers with energy optimization needs
Retailers
... and many others
Public Clients
Industry
Real Estate Owners
Food Production
The more pump energy weighs in on the facility costs, the greater the earnings
5
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited
Outdated
2:3 of all pumps waste 60% energy due to
outdated technology and inefficient operation
Greedy
Water pumps use 10% of the World’s total electricity
consumption
Wasteful
Most pumps waste energy 95% of the time because they always
run at max speed
85% of the lifetime costs of water pump is energy consumption!
6
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited
| Typical energy reduction: 50-80%
| Reduced costs | Reduced energy price risk | Short payback time (3-5 yrs)
| Typical reduction in CO2 emissions: 50-80%
| Energy regulation compliance | Improved green reporting | Pump lifecycle analysis and
documentation | Green corporate image
| Reliable operation | Low failure rates | Reduced downtime | Reduced repair costs | Overview of energy
consumption | Central control
Financial Environmental Operational
7
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited
Less wear, better controlled flow and coordination – bigger the savings
| High-tech electrical engines | Reduced flow vortex | Reduces flow resistance | Reduces friction in bearings.
Æ Better transformation of electric energy
Better Engines
| Frequency drives | Only when needed | Adjustable speed
Æ Pump activity adjusted to actual operational need.
Adjustable Flow
| Central control | Improved service performance | 20% reduced lifetime costs | In concert, not out of sync
Æ Optimized hydraulic control and smoother flow
Control Systems
8
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited
| Lack of knowledge of modern pumps and solutions
| Potential savings seems difficult to calculate
| No overview of green impact (CO2 reduction)
| Capital-intensive investment
| Complex installations with multitude of pumps
| No project management resources
| Fear of maintenance issues
Upgrading becomes too big of a ‘leap’
9
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited
Making water pump upgrading and management affordable
• Simple ‘earn-and-pay’ rental solution • Guaranteed positive cash flow from day 1 • No upfront installation costs • Full energy analysis and pump audit • World-class products and solutions • Professional guidance • Full maintenance included • Continuous monitoring and follow-up
HeSaWater
Leading Danish provider of energy optimization services:
• Energy analysis and audit
• Project design and implementation
• Energy management
• Capex neutral financing
Better engines
The World’s largest pump manufacturer:
• 12 million pump units p.a.
• 18,000 employees worldwide
• Circular pumps, submersible pumps, and centrifugal pumps
• Electric pump motors and control electronics
Immediate energy savings + high-quality product
10
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited
With HeSaWater you start earning from day 1 Cost
Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13 Y14 Y15
100%
40% Post-Update Pump Cost
Rental cost
Pre-Update Pump Cost
Phase 1 Earning:
10% of saving
Phase 2 Earning:
20% of saving
Phase 3 Earning:
30% of saving
Free cash flow Free cash flow
Free cash flow
Technical lifetime of the products
Typical Saving with
our Pumps
After termination: Buy-back at 5% savings value or continue leasing new products
11
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited
We guarantee that performance never varies more than max 10% from original estimate.
Performance band
Actual consumption
Max kWH consumption
Min. number of operational hours
Always sufficient water and never use too much energy consumption
12
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited
HeSaWater presents a unique rental model in three easy steps:
Typical implementation time: 2 months
| Onsite Inspection | Energy Analysis | Needs / Challenges? | Installation Plan | Can be done with
no down time
| Consumption Profile based on analysis and pump solution
| Cost Calculation | Rental Terms | Performance Guarantee | Time Table for Implementation
Step 3: Save
| Full Installation | 50-85% saved energy consumption | Monthly rent with
guaranteed savings effect | Service Included | Continued Savings Monitoring
Æ Energy report Æ Rental contract Æ Realized savings profit
Step 2: Rent Step 1: Analyze
13
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited
| Technical lifetime of the products
| Rent level based on initial energy analysis
| Implementation + service
| Time table
| Monthly instalments accrued and compared to actual energy consumption (+/-)
| Performance guarantee
| Monitoring and savings evaluation
14
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited
| Continuous data tracking on consumption:
— Operational hours, kWh consumption
| Monitoring of savings vs. budget – are we on track?
| Maintenance reporting
| Operations reports
Always know how much you use — and save
15
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited
1. Savings Calculation
2. Payment Plan
3. Technical Evaluation
4. Contract
5. Installation
6. Handover
16
HeSaLight | Confidential | Unauthorized distribution or copying of this information is prohibited 17
Lykkegaardsvej 9 4000 Roskilde
Denmark Phone no.: +45 3537 8888
[email protected] www.hesalight.com