R0 R1 R1 R2
1 FOUNDATION PLAN & DETAIL HSCC/RIMS-IMPHAL/GIRLSHOSTEL/D&E/ST-101 24/2/16
2 Column Layout Plan & Detail HSCC/RIMS-IMPHAL/GIRLSHOSTEL/D&E/ST-102 24/2/16
Plinth Beam Framing Plan HSCC/RIMS-IMPHAL/GIRLSHOSTEL/D&E/ST-103 24/2/16
Typical Floor Beam Framing Plan HSCC/RIMS-IMPHAL/GIRLSHOSTEL/D&E/ST-104 24/2/16
Typical Floor Beam R/F Details HSCC/RIMS-IMPHAL/GIRLSHOSTEL/D&E/ST-105 24/2/16
Typical Floor Slab R/F Details HSCC/RIMS-IMPHAL/GIRLSHOSTEL/D&E/ST-106 24/2/16
R0
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
Advance Drawing
BUILDING: GIRLS HOSTEL
Sl.No. Drawing Title Drawing no. Date of Release to Site
Good For Construction Drawing
R0 R1 R1 R2
1 FOUNDATION PLAN & DETAIL HSCC/RIMS-IMPHAL/BOYSHOSTEL/D&E/ST-101
2 Column Layout Plan & Detail HSCC/RIMS-IMPHAL/BOYSHOSTEL/D&E/ST-102
3 Plinth Beam Framing Plan HSCC/RIMS-IMPHAL/BOYSHOSTEL/D&E/ST-103
4 Typical Floor Beam Framing Plan HSCC/RIMS-IMPHAL/BOYSHOSTEL/D&E/ST-104
5 Typical Floor Beam R/F Details HSCC/RIMS-IMPHAL/BOYSHOSTEL/D&E/ST-105
6 Typical Floor Slab R/F Details HSCC/RIMS-IMPHAL/BOYSHOSTEL/D&E/ST-106
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
Advance Drawing
BUILDING: BOYS HOSTEL
Sl.No. Drawing Title
R0
24/2/16
24/2/16
Drawing no. Date of Release to Site
Good For Construction Drawing
24/2/16
24/2/16
24/2/16
24/2/16
R0 R1 R1 R2
1 FOUNDATION PLAN & DETAIL HSCC/RIMS-IMPHAL/TYP-IV/D&E/ST-101 AMIT 12-07-2015
2 COLUMN LAYOUT PLAN & DETAIL HSCC/RIMS-IMPHAL/TYP-IV/D&E/ST-102 AMIT 12-07-2015
TYPE-IV HOUSING
Sl.No. Drawing Title Drawing no. Date of Release to Site
Good For Construction Drawing
R0
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
Advance Drawing
BUILDING:
R0 R1 R1 R2
1 FOUNDATION PLAN & DETAIL HSCC/RIMS-IMPHAL/TYP-TC/D&E/ST-101
2 Column Layout Plan & Detail HSCC/RIMS-IMPHAL/TYP-TC/D&E/ST-102
3 Plinth Beam Framing Plan HSCC/RIMS-IMPHAL/TYP-TC/D&E/ST-103
4 Typical Floor Beam Framing Plan HSCC/RIMS-IMPHAL/TYP-TC/D&E/ST-104
5 Typical Floor Beam R/F Details HSCC/RIMS-IMPHAL/TYP-TC/D&E/ST-105
6 Typical Floor Slab R/F Details HSCC/RIMS-IMPHAL/TYP-TC/D&E/ST-106
24/2/16
24/2/16
24/2/16
24/2/16
R0
24/2/16
24/2/16
Drawing no. Date of Release to Site
Good For Construction Drawing
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
Advance Drawing
BUILDING: TEACHING BLOCK
Sl.No. Drawing Title
R0 R1 R1 R2
1 FOUNDATION PLAN & DETAIL HSCC/RIMS-IMPHAL/TYP-III/D&E/ST-101 AMIT 12-07-2015
2 COLUMN LAYOUT PLAN & DETAIL HSCC/RIMS-IMPHAL/TYP-III/D&E/ST-102 AMIT 12-07-2015
3 PLINTH BEAM FRAMING PLAN & R/F DETAIL HSCC/RIMS-IMPHAL/TYP-III/D&E/ST-103 19/1/16
4 TYPICAL FLOOR SLAB DETAIL HSCC/RIMS-IMPHAL/TYP-III/D&E/ST-104 19/1/16
5 TYPICAL FLOOR BEAM DETAIL HSCC/RIMS-IMPHAL/TYP-III/D&E/ST-105 19/1/16
6 R/F DETAIL OF STAIRCASE HSCC/RIMS-IMPHAL/TYP-III/D&E/ST-106 19/1/16
R0
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
Advance Drawing
BUILDING: TYPE-III HOUSING
Sl.No. Drawing Title Drawing no. Date of Release to Site
Good For Construction Drawing
R0 R1 R1 R2
1 FOUNDATION PLAN & DETAIL HSCC/RIMS-IMPHAL/BLOODBANK/D&E/ST-101 AMIT 12-07-2015
2 SUPER STRUCTUTURE DETAIL HSCC/RIMS-IMPHAL/BLOODBANK/D&E/ST-102
IMMUNO HAMETALOGY BLOOD TRANSMISSION BLOCK
Sl.No. Drawing Title Drawing no. Date of Release to Site
R0
Good For Construction Drawing
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
Advance Drawing
BUILDING:
R0 R1 R1 R2
1 FOUNDATION PLAN & DETAIL HSCC/RIMS-IMPHAL/TYP-CASUALTY/D&E/ST-101 AMIT 12-07-2015
2 SUPER STRUCTUTURE DETAIL HSCC/RIMS-IMPHAL/TYP-CASUALTY/D&E/ST-102
Drawing Title Drawing no. Date of Release to Site
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
Good For Construction Drawing
R0
Advance Drawing
BUILDING: CASUALTY
Sl.No.
R0 R1 R1 R2
1 FOUNDATION PLAN & DETAIL HSCC/RIMS-IMPHALTYP-/LT/D&E/ST-101 AMIT 12-07-2015
2 SUPER STRUCTUTURE DETAIL HSCC/RIMS-IMPHALTYP-/LT/D&E/ST-102
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
R0
Advance Drawing
BUILDING: LECTURE THEATRE
Sl.No. Drawing Title
Good For Construction Drawing
Drawing no. Date of Release to Site
R0 R1 R1 R2
1 FOUNDATION PLAN HSCC/D&E/WORKING/IMPHAL/ST-101 AMIT 16/12/15
2 SUPER STRUCTUTURE DETAIL HSCC/D&E/WORKING/IMPHAL/ST-102
Good For Construction Drawing
R0
Advance Drawing
BUILDING: MATERNITY & WARD BLOCK
Sl.No. Drawing Title Drawing no. Date of Release to Site
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
R0 R1 R0 R1 R2
1 SUB STRUCTURE DETAIL HSCC/---/IMPHAL/SUB-STA./ST-101 6/5/2013
2 SUPER STRUCTUTURE DETAIL HSCC/---/IMPHAL/SUB-STA./ST-102 6/5/2013
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
Good For Construction DrawingAdvance Drawing
BUILDING: ELECTRICAL SUBSTATION
Sl.
No.Drawing Title Drawing no. Date of Release to Site
Advance
Drawing
R0 R0 R1 R2
1 FOUNDATION PLAN HSCC/--/D&E/RIMS/INTERNEE/ST-101 1/12/2011 13/03/2012 8/6/2012 16/07/2012
2 COLUMN LAYOUT PLAN HSCC/--/D&E/RIMS/INTERNEE/ST-102 1/12/2011 13/03/2012 8/6/2012 16/07/2012
3 PLINTH BEAM FRAMING AND DETAILS HSCC/--/D&E/RIMS/INTERNEE/ST-103 1/12/2011 13/03/2012 8/6/2012 16/07/2012
4 TYPICAL FLOOR BEAM FRAMING PLAN HSCC/--/D&E/RIMS/INTERNEE/ST-104 16/07/2012
5 TYPICAL FLOOR BEAM DETAILSHSCC/--/D&E/RIMS/INTERNEE/ST-105
SHEET 01 OF 0216/07/2012
6 TYPICAL FLOOR BEAM DETAILSHSCC/--/D&E/RIMS/INTERNEE/ST-105
SHEET 02 OF 0216/07/2012
7 TYPICAL FLOOR SLAB R/F DETAIL HSCC/--/D&E/RIMS/INTERNEE/ST-106 16/07/2012
8 TERRACE LVL BEAM FRAMING PLAN HSCC/--/D&E/RIMS/INTERNEE/ST-107 16/07/2012
9 SLAB R/F DETAIL AT TERRACE LVL HSCC/--/D&E/RIMS/INTERNEE/ST-108 16/07/2012
10 TERRACE LVL BEAM DETAILSHSCC/--/D&E/RIMS/INTERNEE/ST-109
SHEET 01 OF 0216/07/2012
11 TERRACE LVL BEAM DETAILSHSCC/--/D&E/RIMS/INTERNEE/ST-109
SHEET 02 OF 0216/07/2012
12 R/F DETAILS OF STAIR HSCC/--/D&E/RIMS/INTERNEE/ST-110 16/07/2012
13 R/F DETAILS OF STAIR HSCC/--/D&E/RIMS/INTERNEE/ST-111 16/07/2012
14 R/F DETAILS OF STAIR HSCC/--/D&E/RIMS/INTERNEE/ST-112 16/07/2012
15 MUMTY LVL BEAM AND SLAB DETAILS HSCC/--/D&E/RIMS/INTERNEE/ST-113 16/07/2012
Good For Construction Drawing
Date of Release to Site
BUILDING:
PROJECT:
INTERNEE HOSTEL
RIMS, IMPHAL
PROJECT STATUS REPORT
HSCC (INDIA) LTD.
Sl.
No.Drawing Title Drawing no.
Advance
Drawing
R0 R0 R1
1 FOUNDATION PLAN HSCC/--/RIMS/NURSING-H/ST-101 23/02/2012 13/03/2012 27/04/2012
2 COLUMN LAYOUT PLAN HSCC/--/RIMS/NURSING-H/ST-102 x 13/03/2012 6/8/2012
3 COLUMN DETAILS HSCC/--/RIMS/NURSING-H/ST-102A x 13/03/2012 6/8/2012
4 PLINTH BEAM FRAMING AND DETAILS HSCC/--/RIMS/NURSING-H/ST-103 x 13/03/2012 -----
5 FIRST FLOOR FRAMING PLAN HSCC/--/D&E/RIMS/NURSING/ST-104 13/04/2012 6/8/2012
6 SECOND FLOOR FRAMING PLAN HSCC/--/D&E/RIMS/NURSING/ST-105 13/04/2012 6/8/2012
7 THIRD FLOOR FRAMING PLAN HSCC/--/D&E/RIMS/NURSING/ST-106 13/04/2012 6/8/2012
8 TERRACE FLOOR BEAM FRAMING PLAN HSCC/--/D&E/RIMS/NURSING/ST-107 6/8/2012
9 FIRST FLOOR BEAM DETAIL HSCC/--/D&E/RIMS/NURSING/ST-
108(SHEET 01 OF 02)6/8/2012
10 FIRST FLOOR BEAM DETAIL HSCC/--/D&E/RIMS/NURSING/ST-
108(SHEET 02 OF 02)6/8/2012
11 FIRST FLOOR SLAB R/F DETAIL HSCC/--/D&E/RIMS/NURSING/ST-109 6/8/2012
12 SECOND FLOOR BEAM DETAIL HSCC/--/D&E/RIMS/NURSING/ST-
110(SHEET 01 OF 02)6/8/2012
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
Sl.
No.Drawing Title Drawing no. Date of Release to Site
BUILDING: NURSING HOSTEL
Good For Construction
Drawing
13 SECOND FLOOR BEAM DETAIL HSCC/--/D&E/RIMS/NURSING/ST-
110(SHEET 02 OF 02)6/8/2012
14 SECOND FLOOR SLAB R/F DETAIL HSCC/--/D&E/RIMS/NURSING/ST-111 6/8/2012
15 THIRD FLOOR BEAM DETAIL HSCC/--/D&E/RIMS/NURSING/ST-
112(SHEET 01 OF 02)6/8/2012
16 THIRD FLOOR BEAM DETAIL HSCC/--/D&E/RIMS/NURSING/ST-
112(SHEET 02 OF 02)6/8/2012
17 THIRD FLOOR SLAB R/F DETAIL HSCC/--/D&E/RIMS/NURSING/ST-113 6/8/2012
18 TERRACE FLOOR BEAM DETAIL HSCC/--/D&E/RIMS/NURSING/ST-
114(SHEET 01 OF 03)6/8/2012
19 TERRACE FLOOR BEAM DETAIL HSCC/--/D&E/RIMS/NURSING/ST-
114(SHEET 02 OF 03)6/8/2012
20 TERRACE FLOOR BEAM DETAIL HSCC/--/D&E/RIMS/NURSING/ST-
114(SHEET 03 OF 03)6/8/2012
21 TERRACE FLOOR SLAB DETAIL HSCC/--/D&E/RIMS/NURSING/ST-115 6/8/2012
22 MUMTY DETAILS-1 HSCC/--/D&E/RIMS/NURSING/ST-116 6/8/2012
23 MUMTY DETAILS-2 HSCC/--/D&E/RIMS/NURSING/ST-117 6/8/2012
24 MUMTY DETAILS-3 HSCC/--/D&E/RIMS/NURSING/ST-118 6/8/2012
25 STAIRCASE DETAIL-1 HSCC/--/D&E/RIMS/NURSING/ST-119 6/8/2012
26 STAIRCASE DETAIL-2 HSCC/--/D&E/RIMS/NURSING/ST-120 6/8/2012
27 STAIRCASE DETAIL-3 HSCC/--/D&E/RIMS/NURSING/ST-121 6/8/2012
Advance
Drawing
Good For
Construction
Drawing
R0 R0
1 FOUNDATION PLAN HSCC/--/D&E/RIMS/PG-H(G-DIN)/ST-101 23/02/2012 13/03/2012
2 COLUMN LAYOUT PLAN HSCC/--/D&E/RIMS/PG-H(G-DIN)/ST-102 x 13/03/2012
3 PLINTH BEAM FRAMING AND DETAILS HSCC/--/D&E/RIMS/PG-H(G-DIN)/ST-103 x 13/03/2012
4 TERRACE FLOOR BEAM FRAMING PLAN HSCC/--/D&E/RIMS/PG-H(G-DIN)/ST-104 14/08/2012 20/12/12
5 TERRACE FLOOR SLAB R/F DETAIL HSCC/--/D&E/RIMS/PG-H(G-DIN)/ST-105 14/08/2012 20/12/12
6 TERRACE FLOOR BEAM R/F DETAIL HSCC/--/D&E/RIMS/PG-H(G-DIN)/ST-106 14/08/2012 20/12/12
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
BUILDING: PG GENTS HOSTEL DINING
Sl.
No.Drawing Title Drawing no. Date of Release to Site
R0 R1 R0 R1 R2
1 FOUNDATION PLAN HSCC/--/D&E/RIMS/PG-H(G)/ST-101 23/12/2011 13/03/2012 27/04/2012 26/02/2013
2 COLUMN LAYOUT PLAN HSCC/--/D&E/RIMS/PG-H(G)/ST-102 23/12/2011 9/4/2012 13/03/2012 16/07/2012
3 PLINTH BEAM FRAMING AND DETAILS HSCC/--/D&E/RIMS/PG-H(G)/ST-103 23/12/2011 13/03/2012 16/07/2012
4 FIRST FLOOR BEAM FRAMING PLAN HSCC/--/RIMS/PG-H(G)/ST-104 19/03.2012 16/07/2012
5 FIRST FLOOR SLAB R/F DETAIL HSCC/--/RIMS/PG-H(G)/ST-105 19/03.2012 16/07/2012
6 FIRST FLOOR BEAM DETAILHSCC/--/RIMS/PG-H(G)/ST-106 SHEET
01 OF 0219/03.2012 16/07/2012
7 FIRST FLOOR BEAM DETAILHSCC/--/RIMS/PG-H(G)/ST-106 SHEET
02 OF 0219/03.2012 16/07/2012
8 SECOND BEAM FRAMING PLAN HSCC/--/RIMS/PG-H(G)/ST-107 19/03.2012 16/07/2012
9 SECOND SLAB R/F DETAIL HSCC/--/RIMS/PG-H(G)/ST-108 19/03.2012 16/07/2012
10 SECOND BEAM DETAILHSCC/--/RIMS/PG-H(G)/ST-109 SHEET
01 OF 0219/03.2012 16/07/2012
11 SECOND BEAM DETAILHSCC/--/RIMS/PG-H(G)/ST-109 SHEET
02 OF 0219/03.2012 16/07/2012
12 THIRD FLOOR FRAMING PLAN HSCC/--/RIMS/PG-H(G)/ST-107 13/04/2012 16/07/2012
BUILDING: PG GENTS HOSTEL
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
Advance Drawing Good For Construction Drawing
Sl.
No.Drawing Title Drawing no. Date of Release to Site
13 THIRD FLOOR BEAM DETAIL sheet 01 of 02 HSCC/--/RIMS/PG-H(G)/ST-108 13/04/2012 16/07/2012
14 THIRD FLOOR BEAM DETAIL sheet 01 of 02HSCC/--/RIMS/PG-H(G)/ST-109 SHEET
01 OF 0213/04/2012 16/07/2012
15 THIRD FLOOR SLAB R/F DETAILHSCC/--/RIMS/PG-H(G)/ST-109 SHEET
02 OF 0213/04/2012 16/07/2012
16 TERRACE FLOOR BEAM FRAMING PLAN HSCC/--/RIMS/PG-H(G)/ST-110 19/03/2012 16/07/2012
17 TERRACE FLOOR SLAB R/F DETAIL HSCC/--/RIMS/PG-H(G)/ST-112 19/03/2012 16/07/2012
18 TERRACE FLOOR BEAM DETAILHSCC/--/RIMS/PG-H(G)/ST-111 SHEET
01 OF 0319/03/2012 16/07/2012
19 TERRACE FLOOR BEAM DETAILHSCC/--/RIMS/PG-H(G)/ST-111 SHEET
02 OF 0319/03/2012 16/07/2012
20 TERRACE FLOOR BEAM DETAILHSCC/--/RIMS/PG-H(G)/ST-111 SHEET
03 OF 0319/03/2012 16/07/2012
21 STAIRCASE DETAIL HSCC/--/RIMS/PG-H(G)/ST-113 19/03/2012 16/07/2012
22 STAIRCASE DETAIL HSCC/--/RIMS/PG-H(G)/ST-114 19/03/2012 16/07/2012
23 STAIRCASE DETAIL HSCC/--/RIMS/PG-H(G)/ST-115 19/03/2012 16/07/2012
24MUMTY LVL. BEAM FRAMING PLAN, SLAB
DETAILS AND BEAM DETAILSHSCC/--/RIMS/PG-H(G)/ST-116 19/03/2012 16/07/2012
Advance
Drawing
R0 R0 R1
1 FOUNDATION PLAN HSCC/--/D&E/RIMS/PG LADIES/ST-101 23/02/2012 13/03/2012 8/6/2012
2 COLUMN LAYOUT PLAN HSCC/--/D&E/RIMS/PG LADIES/ST-102 x 13/03/2012 8/6/2012
3 PLINTH BEAM FRAMING AND DETAILS HSCC/--/D&E/RIMS/PG LADIES/ST-103 x 13/03/2012 8/6/2012
4 FIRST FLOOR BEAM FRAMING PLAN HSCC/--/RIMS/PGLADIES/ST-104 30/03/2012 16/07/2012
5 FIRST FLOOR SLAB R/F DETAIL HSCC/--/RIMS/PG LADIES/ST-106 30/03/2012 16/07/2012
6 FIRST FLOOR BEAM DETAILHSCC/--/RIMS/PG LADIES/ST-105
SHEET 01 OF 0230/03/2012 16/07/2012
7 FIRST FLOOR BEAM DETAILHSCC/--/RIMS/PG LADIES/ST-105
SHEET 02 OF 0230/03/2012 16/07/2012
8 SECOND FLOOR BEAM FRAMING PLAN HSCC/--/RIMS/PGLADIES/ST-104 30/03/2012 16/07/2012
PG LADIES HOSTEL
Sl.
No.Drawing Title Drawing no. Date of Release to Site
Good For Construction
Drawing
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT:
BUILDING:
RIMS, IMPHAL
9 SECOND FLOOR SLAB R/F DETAIL HSCC/--/RIMS/PG LADIES/ST-106 30/03/2012 16/07/2012
10 SECOND FLOOR BEAM DETAILHSCC/--/RIMS/PG LADIES/ST-105
SHEET 01 OF 0230/03/2012 16/07/2012
11 SECOND FLOOR BEAM DETAILHSCC/--/RIMS/PG LADIES/ST-105
SHEET 02 OF 0230/03/2012 16/07/2012
12 THIRD FLOOR BEAM FRAMING PLAN HSCC/--/RIMS/PGLADIES/ST-104 30/03/2012 16/07/2012
13 THIRD FLOOR SLAB R/F DETAIL HSCC/--/RIMS/PG LADIES/ST-106 30/03/2012 16/07/2012
14 THIRD FLOOR BEAM DETAILHSCC/--/RIMS/PG LADIES/ST-105
SHEET 01 OF 0230/03/2012 16/07/2012
15 THIRD FLOOR BEAM DETAILHSCC/--/RIMS/PG LADIES/ST-105
SHEET 02 OF 0230/03/2012 16/07/2012
16 TERRACE FLOOR BEAM FRAMING PLAN HSCC/--/RIMS/PGLADIES/ST-107 13/04/2012 16/07/2012
17 TERRACE FLOOR SLAB R/F DETAIL HSCC/--/RIMS/PG LADIES/ST-108 13/04/2012 16/07/2012
18TERRACE FLOOR BEAM DETAIL sheet 01 of
02
HSCC/--/RIMS/PG LADIES/ST-109
SHEET 01 OF 0213/04/2012 16/07/2012
19TERRACE FLOOR BEAM DETAIL sheet 02 of
02
HSCC/--/RIMS/PG LADIES/ST-109
SHEET 02 OF 0213/04/2012 16/07/2012
20 STAIRCASE HSCC/--/D&E/RIMS/PG LADIES/ST-110 13/04/2012 16/07/2012
21 STAIRCASE HSCC/--/D&E/RIMS/PG LADIES/ST-111 13/04/2012 16/07/2012
22 STAIRCASE HSCC/--/D&E/RIMS/PG LADIES/ST-112 13/04/2012 16/07/2012
23 Mumty Lvl And Slab Details HSCC/--/D&E/RIMS/PG LADIES/ST-113 13/04/2012 16/07/2012
R0 R1 R0 R1 R2
1 FOUNDATION PLAN HSCC/--/D&E/RIMS/UG/ST-101 9/12/2011 13/03/2012 27/04/2012 26/02/2013
2 COLUMN LAYOUT PLAN HSCC/--/D&E/RIMS/UG/ST-102 9/12/2011 9/4/2012 13/03/2012 5/9/2012
3 PLINTH BEAM FRAMING AND DETAILS HSCC/--/D&E/RIMS/UG/ST-103 9/12/2011 13/03/2012
4 FIRST FLOOR FRAMING PLAN HSCC/--/D&E/RIMS/UG HOSTEL/ST-104 13/04/2012 5/9/2012
5 FIRST FLOOR SLAB HSCC/--/D&E/RIMS/UG HOSTEL/ST-105 13/04/2012 5/9/2012
6 FIRST FLOOR BEAM DETAILS HSCC/--/D&E/RIMS/UG HOSTEL/ST-106 30/04/2012 5/9/2012
7 SECOND FLOOR FRAMING PLAN HSCC/--/D&E/RIMS/UG HOSTEL/ST-107 13/04/2012 5/9/2012
8 2ND FLOOR SLAB HSCC/--/D&E/RIMS/UG HOSTEL/ST-108 13/04/2012 5/9/2012
9 SECOND FLOOR BEAM DETAILS HSCC/--/D&E/RIMS/UG HOSTEL/ST-109 30/04/2012 5/9/2012
10 THIRD FLOOR FRAMING PLAN HSCC/--/D&E/RIMS/UG HOSTEL/ST-110 13/04/2012 5/9/2012
11 3RD FLOOR SLAB HSCC/--/D&E/RIMS/UG HOSTEL/ST-111 13/04/2012 5/9/2012
12 THIRD FLOOR BEAM DETAIL sheet 01 of 02 HSCC/--/D&E/RIMS/UG HOSTEL/ST-112 30/04/2012 5/9/2012
13 THIRD FLOOR BEAM DETAIL sheet 02 of 02 HSCC/--/D&E/RIMS/UG HOSTEL/ST-112 30/04/2012 5/9/2012
Advance Drawing Good For Construction Drawing
Sl.
No.Drawing Title
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
BUILDING: UG LADIES HOSTEL
Drawing no. Date of Release to Site
14 TERRACE FLOOR FRAMING PLAN HSCC/--/D&E/RIMS/UG HOSTEL/ST-113 13/04/2012 5/9/2012
15 TERRACE SLAB HSCC/--/D&E/RIMS/UG HOSTEL/ST-114 13/04/2012 5/9/2012
16TERRACE FLOOR BEAM DETAIL sheet 01 of
02HSCC/--/D&E/RIMS/UG HOSTEL/ST-115 30/04/2012 5/9/2012
17TERRACE FLOOR BEAM DETAIL sheet 02 of
02HSCC/--/D&E/RIMS/UG HOSTEL/ST-115 30/04/2012 5/9/2012
18 STAIRCASE HSCC/--/D&E/RIMS/UG HOSTEL/ST-116 30/04/2012 5/9/2012
19 STAIRCASE HSCC/--/D&E/RIMS/UG HOSTEL/ST-117 30/04/2012 5/9/2012
20 MUMTY DETAIL HSCC/--/D&E/RIMS/UG HOSTEL/ST-118 30/04/2012 5/9/2012
R0 R1 R0 R1 R2
1FOUNDATION PLAN, COLUMN LAYOUT,
PLINTH BEAM DETAILHSCC/--/D&E/RIMS/DINING/ST-101 9/12/2011 13/03/2012 27/04/2012 20/12/12
2FIRST & SECOND FLOOR BEAM FRAMING
AND SLAB DETAILSHSCC/--/D&E/RIMS/DINING/ST-102 20/12/12
3 FIRST & SECOND FLOOR BEAM DETAILS HSCC/--/D&E/RIMS/DINING/ST-103 20/12/12
4THIRD FLOOR BEAM FRAMING AND SLAB
DETAILSHSCC/--/D&E/RIMS/DINING/ST-104 20/12/12
5 THIRD FLOOR BEAM DETAILS HSCC/--/D&E/RIMS/DINING/ST-105 20/12/12
6TERRACE FLOOR BEAM FRAMING AND SLAB
DETAILSHSCC/--/D&E/RIMS/DINING/ST-106 20/12/12
7 TERRACE FLOOR BEAM DETAILS HSCC/--/D&E/RIMS/DINING/ST-107 20/12/12
8 MUMTY AND STAIRCASE DETAILS HSCC/--/D&E/RIMS/DINING/ST-108 20/12/12
Drawing no. Date of Release to Site
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
Good For Construction DrawingAdvance Drawing
BUILDING: UG LADIES HOSTEL-DINNING
Sl.
No.Drawing Title
R0 R1 R0 R1 R2
1 UG TANK & PUM RM ARR. & R/F DETAIL HSCC/D&E/RIMS/ST001 SHEET 1 OF 2 15/05/2013
2 UG TANK & PUM RM ARR. & R/F DETAIL HSCC/D&E/RIMS/ST001 SHEET 2 OF 2 15/05/2013
Drawing no. Date of Release to Site
HSCC (INDIA) LTD.PROJECT STATUS REPORT
PROJECT: RIMS, IMPHAL
Good For Construction DrawingAdvance Drawing
BUILDING: ELECTRICAL SUBSTATION
Sl.
No.Drawing Title