Q Bridge DesignCombined Cycle
Installation of New Equipment
5Hitachi Plant Technologies
6Hitachi Plant Technologies
7Hitachi Plant Technologies
OVERSEAS:
- Erection Experience in over 20 counties
Major Mail stone Major Mail stone
8Hitachi Plant Technologies
VENEZUELA Br 3units: 1,200MW
JAPAN 83 projects: 41.815MW
Br: 16 projects BTG: 25 projects TG:25 projects CC: 11 projects
GTG: 6 projects
PHILIPIPINES TG & Br: 850MW
THAILAND CC & BTG: 79MW
NIGERIA GTG 6 units & BTG:
1,690 MW
CANADA TG 19 projects:
MALAYSIA GTG 7 units:
IRAN GTG 23unit & TG:
456 MW
350 MW
PERU Ilo Thermal Power
125 MW Power Station (Marker: Hitachi, Ltd.) Completed in Year
2000
THAILAND MAPUTAPHUT 70MW x 2 GT-G (Maker : GE) Completed in Year
1997
Execution Records : OverseasExecution Records : Overseas
NIGERIANIGERIA Delta Power StationDelta Power Station H25 Gas
Turbine 6Unit H25 Gas Turbine 6Unit (Maker: HITACHI)
NIGERIANIGERIA Lagos Thermal PowerLagos Thermal Power
Boiler/Turbine Boiler/Turbine Rehabilitation WorkRehabilitation
Work (Maker: HITACHI)(Maker: HITACHI)
Execution Records : OverseasExecution Records : Overseas
11Hitachi Plant Technologies
BAHAMA Bahama Electricity Co. 25MW x 2 Gas Turbines (Marker:
Hitachi, Ltd.) Completed in Year 2003
Execution Records : OverseasExecution Records : Overseas
1. Contract Formation:
Hitachi PlantHitachi Plant
Foundation work, Installation work & Material Supply2.
Location:
Execution Records : OverseasExecution Records : Overseas
EGYPT Cairo North 750MW Combined Cycle Power Station
250MW x 2 Gas Turbines and Generators (Maker: Mitsubishi Heavy
Industries) 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.)
Erection Works
Senoko P.S. No.18 120MW×3 250MW×5
Senoko P.S. No.18 120MW×3 250MW×5
Tuas StageNo.1,2 600MW×2 Tuas StageNo.1,2 600MW×2
Sakura P.S. 800MW C/CSakura P.S. 800MW C/C Seraya P.S. No.46
250MW×3 Seraya P.S. No.46 250MW×3
HPC Singapore Branch HPC Singapore Branch
Tuas stage 2 Phase2 720MW C/C Tuas stage 2 Phase2 720MW C/C
Jurong P.S. No.14 60MW×4 Jurong P.S. No.14 60MW×4
Execution Records: Singapore - OverviewExecution Records: Singapore
- Overview
15Hitachi Plant Technologies
SINGAPORE Tuas Stage I 600 MW x 2ST-G (Maker:Hitachi,Ltd.)
Completed in Year 1999
Tuas Stage II 360 MWx2 Combined Cycle Power Station (Maker:
Mitsubishi Heavy Industries)
Execution Records: Singapore - TuasExecution Records: Singapore -
Tuas
Execution Records in AustraliaExecution Records in Australia
LOY YANG B 1,000MW(500MW×2) Maker :Hitachi,Ltd. Completed in year
1996
STANWELL 1,400MW(350MW×4) Maker: Hitachi,Ltd. Completed in year
1996
PINJAR: 37MW (F6×1) Maker : Hitachi,Ltd. Completed in year
1990
BRISBANE
KALGOORIE: 37MW (F6×1) Maker: Hitachi,Ltd. Completed in year
1989
MUNGARRA: 37MW (F6×1) Maker: Hitachi,Ltd. Completed in year
1989
TARONG 1400MW(350MW×4) Maker: Hitachi,Ltd. Completed in year
1988
TARONG NORTH 450MW(450MW×1) Maker: Toshiba,Ltd. Completed in year
2002
17Hitachi Plant Technologies
Tarong Power Station 350MW x 4 Steam Turbines (Maker: Hitachi,
Ltd.) Completed in Year 1988
Execution Records: Australia- QueenslandExecution Records:
Australia- Queensland
18Hitachi Plant Technologies
Tarong North Power Station 450MW x 1 Steam Turbines (Maker:
Toshiba, Ltd.) Completed in Year 2002
Execution Records: Australia- QueenslandExecution Records:
Australia- Queensland
19Hitachi Plant Technologies
Stanwell Power Station 350MW x 4 TG & Auxiliaries (Maker:
Hitachi, Ltd.) Completed in Year 1996
Execution Records: Australia- QueenslandExecution Records:
Australia- Queensland
(Maker: Hitachi, Ltd.)
Execution Records: Australia- Western Australia Execution Records:
Australia- Western Australia
Execution Records: Kogan Creek 750MW under construction) Execution
Records: Kogan Creek 750MW under construction)
Project Name: Kogan Creek Power plant 750MW coal fired power
station Location: Queensland, Australia Owner: CEPAKogan
CreekHolding Pty Ltd. Manufacture: SIEMENS Ltd. Australia Scope of
our work: Installation work Date of Contract: Aug 2005 Date of
Completion: Aug, 2007
23Hitachi Plant Technologies
Waste Water Treatment Plant for Sydney Metropolitan Waste Disposal
Authority
Major overhaul of Tarong U1 Turbine
Refurbishment and re-commissioning of Swankbank ‘A’
Sootblowers
Electrical & instrumentation for retrofit of precipitators
fabric filter plant Swankbank ‘B’.
Cabling, light & power services for Callide ‘A’ re-
powering
Execution Records: AustraliaExecution Records: Australia
1978– 1984
PLANTA CENTRO THERMAL POWER STATION UNITS 3 & 4, and Unit
5
Owner: COMPAÑÍA ANONIMA DE ADMINISTRACION Y FOMENTO (CADAFE)
Unit:3 & 4: Installation of Two 1400 Ton/Hour Boilers and
Associated equipment for 400 MW generating Units No 3 & 4, AFE
including erection of Steel Structures of the Boilers.
Unit 5: Installation of 1,400 Ton/Hour boiler for 400 MW generation
unit.
Construction period: 2004-2005
Project Name: Tacoa Power plant unit 7, 8 & 9 - DCS
(Distributed digital controls) project
Owner: La Electricidad de Caracas (EDC)
Purchaser: Toshiba Corporation (Mitsui & Co., ltd)
Site: Caracas
Construction period: 2005-2006
Owner : ELEVAL
Site: VALENCIA
ISOGO 600 MW Coal Fired Turbine Generator System Installation
(Maker: Fuji – Siemens) Completed in Year 2002
FUTTSU Futtsu Power Station 1520MW Combined Cycle (Maker: Hitachi,
Ltd.) Completed in Year 2003
Execution Records : JapanExecution Records : Japan
Toden/Yokohama (1400MW C/C)1998
Toden/Chiba (720MW C/C)2000
Chubuden/Kawagoe (1650MW C/C)1996
Kanden/Himeji (670MW C/C)1996
Execution RecordsCombined Cycle Plant in JapanOverview Execution
RecordsCombined Cycle Plant in JapanOverview
32Hitachi Plant Technologies
Contact Check for Sole Plate PadsContact Check for Sole Plate
Pads
Execution RecordsShin-Oita CC PlantExecution RecordsShin-Oita CC
Plant
33Hitachi Plant Technologies
34Hitachi Plant Technologies
Gas Turbine LiftGas Turbine Lift--up with Lifting Jackup with
Lifting Jack
Execution RecordsShin-Oita CC PlantExecution RecordsShin-Oita CC
Plant
35Hitachi Plant Technologies
Execution RecordsShin-Oita CC PlantExecution RecordsShin-Oita CC
Plant
36Hitachi Plant Technologies
Execution RecordsShin-Oita CC PlantExecution RecordsShin-Oita CC
Plant
37Hitachi Plant Technologies
Senoko Power Station Singapore (Electrostatic Precipitator)
Dry and Wet Type Electrostatic Precipitators
Moving-Electrode Type Electrostatic
39Hitachi Plant Technologies
Advanced Project Management Systematic Schedule Management
Interface management with Other Parties
Minimum Cost
Minimum Cost
Total SatisfactionTotal Satisfaction
Schedule
Reliability
Realization of Effective Construction Schedule
Reduction of Total Project Cost by minimizing Erection Cost
Reduction of Documentation Cost
Introduction of Advanced Erection Technology
Assistance of making Documentation for construction planning
Advice of site work conditions
EngineeringEngineering
Execution Records : Venezuela - CADAFE
ISO certificate & QC
Pre-Engineering : Benefits to Customers