HP ALM Online Training by Cheyat Tech

Embed Size (px)

Citation preview

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    1/21

    http://cheyat.com/qa/hp-alm-onli

    ne-training-tutorials

    HP ALM Online Training

    http://cheyat.com/qa/hp-alm-online-training-tutorialshttp://cheyat.com/qa/hp-alm-online-training-tutorialshttp://cheyat.com/qa/hp-alm-online-training-tutorialshttp://cheyat.com/qa/hp-alm-online-training-tutorials

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    2/21

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    3/21

    Why Testing

    3

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    4/21

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    5/21

    Test management  is the practice of organi!ing and

    controlling the process and artifacts required for thtesting e"ort#

    • Pen and paper

    • $ord processors• %preadsheets• %haring in &rives '()*+• ,mails

     -raditional toolsused for testmanagement

    include)

    Why Test Management Tools

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    6/21

    .

    • %tart test management activities early• -est iteratively• Reuse test artifacts• /tili!e requirements0based testing•

    1everage remote testing resources• ,nd to ,nd -raceability of Release requirements• &ening and enforcing a eible testing process• 5oordinate and integrate with the rest of development• 5ommunicate status• 6ocus on goals and results• 7utomate to save time

    Test Management Recommendations

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    7/21

    Benets

    8

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    8/21

    9

    ALM !takeholders

    Pro:ect;anagers

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    9/21

    Domain "ro#ects

    76?@Pro:ects @ 7ll

    76?@ R65@7ll

    76?@

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    10/21

    Testing "rocess – An *+er+iew ,!*LMA- – '"ALM.

    %C1;7E HP 71; F2

    Requirements

    &efects toprocess in%C1;7E

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    11/21

    Testing "rocess – Details ,!*LMA- – '" ALM.

    Requirements ;odule

    F# -he Requirements can be loaded to HP 71; in any of the following three ways• Import are ,port the business blueprint and test ob:ects from %C1;7E %C17R2J

    $ote% &nly t'e Business (rocesses)scenarios t'at 'as test object or transactions assigneimport to *( +L!

    • 5apture the functional requirements in the dened ecel spreadsheet and import the sam• 5reate the required folder tree and enter requirements into that based on the functional r2# Cnce the Requirements are imported to the HP 71; then we can update*delete the requiremen

    respective requirement

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    12/21

    Test "lan ModuleF# -he test cases can be loaded to HP 71; in any of the following two ways

    • &irectly enter the test cases and dene the test steps in the -est plan module• $rite the test cases in the dened ecel spreadsheet and import the same to HP 71; tes

    2# ,ach test case will be mapped to the corresponding requirements by editing the test case

    Test La$ Module3# -he corresponding test cases need to be mapped pull to the -est lab module as a -est set for th4# -hese test case need to be eecuted either ;anually or 7utomated run for the automated case# -he test results must be transferred to !*LMA- K !*LAR/0)!*LAR/1

    Testing "rocess – Details ,!*LMA- – '" ALM.contd2

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    13/21

    De&ects ModuleF# &uring the test eecution the defects can be logged when the testing scenario is fail to meet t2# &efects falling under two types)

    02 De&ect) It is a regular defect that is been identied as to be processed in the HP 71; onl&evelopment team and it goes though the defect lifecycle process in 71;

    12 !A" related De&ect3 It is a defect that is been identied as to be processed in the %C1;team and it goes through the defect lifecycle process in %C1;7E '&efect 6i+ and 71; '&and 5losing +

    •  -hese can be viewed in the %RM4D-*4M*-5T*R or !M4W*R6%(-T(R or %RMcodes in %C1;7E

    Testing "rocess – Details ,!*LMA- – '" ALM.contd2

    HP 71; %C1

    Eew

    Eew

    6ied

    5losed

    6or

    ReceH

    Propos

    5on

    7ssignresponsibility to %7P

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    14/21

    De&ect Work7ow

    HP ALM Implementation Case Study

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    15/21

    HP ALM Implementation Case Study

    5lient is one of the largest company that

    o"ers a comprehensive array of nancial

    services to retail and institutional clientsL

    which includes annuitiesL retirement plansL

    life insuranceL mutual fundsL managed

    accountsL alternative investmentsL direct

    bankingL institutional investment

    managementL employee benetsL and

    nancial planning#

    5lient Prole

    5lient Requirements

     -he client was looking to implement HP 71;

    to address the following)

    ;anage and create traceability between

    requirementsL tests artifacts and defects

    %tandardi!e process across application

    lifecycle 6acilitate collaboration and

    communication between multipleL

    distributed teams

    ;anage and eecute automated testing

    ;ake informed go*no go decisions

    Provide a scalable architecture

    Pro:ect

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    16/21

    ciency by reducing duplication of e"ort and sharing best

    practices

    Increased visibility to quality statusL requirement coverage and defect

    trends in aggregate across pro:ects and initiatives

    7chieved signicant savings by tracking key metrics against pro:ect

    milestones within Pro:ect Planning and -racking of HP 7pplication

    ;anagement

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    17/21

    %ategory Description

    De&ect$hen a defect is logged itJs categori!ed as O&efect by default# It states that the de

    analy!ed and ed for the current release

    5ssue$hen a defect is identied and after reviewing Lit has few dependencies to be veri

    steps to be carried etc# hence the defect will be categori!ed as Issue

    -ew Req

    $hen a defect is logged in which the test carried to related to that defect is not men

     -hen the defect is considered as a OEew Req and it goes through the 5hange requ

    following today#

    De&ect %ategories

    De&ect !tatuses 9 Descriptions

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    18/21

    !tatus Responsi$ility Target *wner Description

    -ew  -ester -est 1ead•  -ester*

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    19/21

    "riorityLe+el

    Business 5mpact Testing 5mpact

    "0

     -his has severe impact to the customer and continuing to

    operate may not be possible# -his must be ed

    immediately#

    &efect is a blocking issue# -he defect would impact th

    iteration if not resolvedL and any testing cannot proce

    "1

     -his is ma:or impact to the customer but does not halt

    operations# -his must be ed as soon as possible and

    before the release of the current version in development#

    &efect is severe# -his impacts the general behavior of

    may eist but its use is unsatisfactory# -est cases will b

    ":

     -his has ma:or impact to the customer# -he problem should

    be addressed and ed with the current version release if

    time permitsL or a patch to the release issuedL if possible#

     -he failure impacts non0critical aspects of the system

    under specic conditions# &uring testing this will resul

    not block the eecution of the other test cases#

    ";

     -his has minor impact to the customer# -he aw is usually

    cosmetic to the customer in nature and only needs to be

    ed when there is su>cient time#

    5osmetic problem# &uring testing this will result in tes

    block the eecution of the other test cases#

    De&ect "riority le+els

    Priority is an outcome of sub:ective evaluation of how important an issue to the business# Cther tasks in the quare factors that may impact the decision of prioriti!ing the &efect# It is relativeL it shiftsL and it is always a bus

    • Initial value for priority eld will be set by the tester who creates the defects based on testing impact# &urimeeting it business re0evaluates and updates the valueL if needed#

    • &,=*business will participate in the defect triage meeting during the -esting '6unctional*%I-*Regression+ doassign * change the priority to new defects based on business impact#

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    20/21

    Reports and

    Re:ected

    &eferred

    5losed

    Retest

    6ied

    7ssigned

    Eew

    /- %I- /7-

    2

    4

    .

    9

    F

    F2F4

    F.

    F9

    2

    24

    2

    2

    4

    42

    4.

    2

    4 4

    2

    4 4

    Test !ummary Report =as o

  • 8/18/2019 HP ALM Online Training by Cheyat Tech

    21/21

    1ab