HOW TO PREPARE A DATA CENTER STRATEGY What you need to know to build a business case for Data Center sourcing

HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

HOW  TO  PREPARE  A  DATA  CENTER  STRATEGY  What  you  need  to  know  to  build  a  business  case  for  Data  Center  sourcing  

Page 2: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886

Steve Miano Principal PlanNet Consulting (714) 982-5820

www.plannet.net

Page 3: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Agenda  

ü What  is  a  Data  Center  strategy?  ü  Ge;ng  started  ü  Assessing  the  current  state  ü  Developing  a  future  state  model  ü  Building  a  business  case  ü What  your  decision-­‐makers  want  to  know  ü  Case  studies  

Page 4: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Data  Center  Strategy  

A  Data  Center  Strategy  is  usually  iniBated  for  any  or  all  of  the  following  reasons:  

ü  Data  Center  failures  are  impacBng  the  business  ü  Growth  is  expected  to  exceed  power,  cooling  and/or  space  capaciBes  ü  Risk  –  real  or  perceived  ü  Lowering  Cost  of  OperaBon  ü  Improve  systems  availability  and  disaster  recovery    ü  Inform  a  decision  to  build,  co-­‐locate  or  a  combinaBon  of  approaches  

Page 5: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Ge;ng  Started  

Define  your  objecBves  ü  Business  drivers  ü  Technology  imperaBves    ü  Desired  outcome  

Assemble  a  Core  Team  ü  IdenBfy/appoint  a  project  sponsor  

•  Sponsorship  typically  comes  from  Real  Estate,  FaciliBes  or  IT  

ü  Typical  make-­‐up  of  a  Core  Team  •  FaciliBes  representaBve  (VP,  Director)  •  IT  representaBves  

–  CIO,  IT  Infrastructure  VP,  Network,  user  representaBve(s)  •  Procurement,  sourcing  and  finance  

Page 6: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

IdenBfy  Stakeholders  

ü  A  Data  Center  strategy  has  many  stakeholders  

ü  It’s  criBcal  to  engage  to  appropriate  stakeholder  resources  to  gain  consensus  and  eliminate  surprises  

ü Missing  a  key  stakeholder  is  analogous  to  missing  a  Bre  on  your  car    

Page 7: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Gather  InformaBon  

Formalize  the  project  with  a  Stakeholder  kick-­‐off  

ü Introduce  the  iniBaBve  and  objecBves  

ü Layout  Bmelines  ü Set  expectaBons  

Page 8: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Assessing  the  Current  State    Develop  and  issue  a  Comprehensive  Request  for  InformaBon  and  meet  with  Stakeholders  to  gather  informaBon  ü  Some  of  the  informaBon  is  

available  electronically  (e.g.,  CMDB,  As-­‐Built  drawings,  energy  bills,  etc.)  

ü  Some  of  the  informaBon  will  be  drawn  out  in  Stakeholder  meeBngs  (e.g.,  applicaBon  por\olio,  financial  models,  etc.)  

RFI  Categories    

ü  Equipment/applicaBon  inventory  ü  Data  Center  FaciliBes  ü  Real  Estate  ü  OperaBons  ü  Network  ü  Business  Systems  &  Services  ü  Business  ConBnuity  ü  Finance  ü  Growth  &  Capacity  Planning  ü  IT  Strategic  Plan  

Page 9: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Assessing  the  Current  State  

Key  Points  ü  Establish  current  demand  load  KW  is  the  currency  ü  Determine  historical  demand  growth  (3-­‐5  years)  ü  Assess  exisBng  facility’s  aaribute  and  constraints  (e.g.,  Tier  raBng,  

power,  cooling,  space,  SPOCs)  ü  IdenBfy  applicaBons  and  their  Ber  levels  ü  IdenBfy  network  constraints  (e.g.,  latency  sensiBve  applicaBons)  ü  IdenBfy  adjacency  requirements/constraints  ü  IdenBfy  key  business  &  IT  iniBaBves  (e.g.,  new  business  ventures,  

merger/acquisiBon,  virtualizaBon,  etc.)  ü  Document  outage  history  (many  execuBves  are  unaware  of  outages)  

Page 10: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

1/1/2007 10/26/2009

4/1/2007 7/1/2007 10/1/2007 1/1/2008 4/1/2008 7/1/2008 10/1/2008 1/1/2009 4/1/2009 7/1/2009 10/1/2009

3/12/2007UPS Failure

16 hour outage4,000 hours recovery effort

5/16/2008Power Upgrade

Outage

23 hour outage5,800 hours recovery effort

11/18/2007PRISM outage

7/11/2007Over Temp

from Power Failure

12/31/2008Failed UPS

Transfer6/30/2008Spokane ATS Failure

25 hour outage6,300 hours recovery effort

6/25/2009Fire PanelAC Outage

12/8/2008Sprinkler WorkPower Outage

Outages….what outages?

Page 11: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Future  State  

IdenBfy  the  future  state  scenario  ü  Establish  operaBonal  objecBves  and  service  levels  ü  Establish  availability  targets  

•  Tier  RaBng  •  Geography  

ü  Determine  efficiency  objecBves  (PUE)  ü  Define  sustainability  goals  ü  Consider  adaptability  needs  

Plan  for  the  Unplanned    

Page 12: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Establish  the  Future  State  Determine  relevant  sourcing  models  

ü  Co-­‐LocaBon  ü  Greenfield  ü  Tenant  Improvement  ü  Retrofit  ExisBng  FaciliBes  ü  Cloud/Services  

Select  markets  to  be  evaluated  ü  Ideally,  markets  with  co-­‐locaBon  opBons,  cheap  power  and  free-­‐

cooling  potenBal  ü  Determine  business  affinity  to  parBcular  markets  

•  ExisBng  operaBons  •  Business  drivers  •  ExisBng  or  future  real  estate  or  facility  programs    

Page 13: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Establish  Demand  Forecast  

Align  business  growth  with  IT  growth  ü  OpBmize  IT  deployment  as  part  of  the  deployment  of  a  new  data  

center  

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

20,000

22,000

24,000

26,000

28,000

30,000

FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18

Capacit

y  Dem

and  -­‐

k  Watts

Capacity  Demand  Forecast

Un-­‐optimized Managed Optimized

Page 14: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Establish  Demand  Forecast  

ü  Establish  capacity  threshold  vs.  demand  forecast  ü  Depict  historical  growth  with  future  planning  ü  IdenBfy  strategies  to  miBgate  capacity  constraints  

Page 15: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Define  Day  1/Day  2  

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18

k  Watts

Site  1  -­‐ Production    Buildout   Phases

Managed  Forecast Deployed  Capacity

*DAY  1:  3,900  kW, 22.5K  SF

*DAY 2:  7,900  kW,    22.5K SF

Plan for incremental deployment based on demand forecast

Page 16: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Market  Analysis  

Energy  ü  Rates  vs.  Nat’l  average  ü  Sustainability  ü  Free  cooling  ü  Reliability  

TelecommunicaBons  ü  Diversity  ü  RelaBve  costs  ü  Latency  

Labor  ü  Availability  ü  RelaBve  costs  

FaciliBes  ü  Control/Lease  Terms  

TransportaBon/Accessibility  ü  Flight  Availability  ü  Door  to  Door  Time  

Vendor  &  Services  Support  ü  Proximity  to  criBcal  vendors  

Environmental  Risk  ü  Seismic/Volcanic  ü  Hurricane/Tidal  ü  Severe  Weather  

IncenBves  (very  dependent  on  properBes)  ü  Enterprise  Zones  ü  Sales  Tax  ü  Energy  rebate  programs  

 

Qualitative Metrics use to disqualify markets

Page 17: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

QualitaBve  Market  Rankings  What’s  

important  to  you?   Keep  it  simple  

Page 18: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Building  a  Business  Case  

Determine  Capital  Expenditures  Determine  OperaBonal  Expenditures  Develop  a  MulB-­‐Year  Total  Cost  of  Ownership  for  each  model  (5/10  yr)  Compare  TCO  for  each  model      

Page 19: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

OPEX    ü  Lease  costs    ü  Power  ü  Maintenance  ü  Facility  Management  ü  Security  ü  IT  OperaBons  Staff  ü  TelecommunicaBons  ü  Services  ü  Sales  Tax  ü  MigraBon  

Determine  CapEx  &  OpEx  

CAPEX    ü  ConstrucBon  &  Sok  Costs    (Greenfield,  

TI)  ü  Cable  Plant  ü  Network  Electronics  ü  DepreciaBon  ü  MigraBon  

 

Page 20: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Prepare  TCO  for  each  Scenario    

Co-Location Example

 E.  Washington  Co-­‐Lo  (Phase-­‐In)  2011  Start Year  1 Year  2   Year  3   Year  4 Year  5 5  year  Total Year  6 Year  7 Year  8 Year  9 Year  10 10-­‐  Year  TotalOperating  Costs

Power   46$                     96$                     154$                 166$                 178$                 641$                       192$                 205$                 220$                 237$                 254$                 1,749$                          Predictive  Maintenance -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                                 -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                                            

Rent 478$                 915$                 1,244$         1,269$         1,294$         5,201$               1,411$         1,439$         1,468$         1,497$         1,527$         12,542$                      IT  Staff 90$                     93$                     96$                     99$                     102$                 480$                       105$                 108$                 111$                 115$                 118$                 1,037$                          

Facilities  Staff -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                                 -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                                            Telecommunications 828$                 845$                 861$                 879$                 896$                 4,309$               914$                 932$                 951$                 970$                 990$                 9,066$                          

Co-­‐lo  Setup  Costs 120$                 -­‐$                           -­‐$                           -­‐$                           -­‐$                           120$                       17$                     -­‐$                           -­‐$                           -­‐$                           -­‐$                           137$                                  DC  Equipment  Sales  Tax 128$                 130$                 133$                 135$                 138$                 664$                       141$                 144$                 144$                 146$                 146$                 1,384$                          Operating  Costs  Subtotal 1,690$         2,079$         2,489$         2,548$         2,609$         11,414$           2,779$         2,828$         2,894$         2,965$         3,035$         25,916$                      

Capital  Costs  DC  TI   -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                                 -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                                            

Racks  /  Cabling 1,112$         -­‐$                           -­‐$                           -­‐$                           -­‐$                           1,112$               127$                 -­‐$                           -­‐$                           -­‐$                           -­‐$                           1,240$                          Network  Electronics 879$                 188$                 188$                 -­‐$                           -­‐$                           1,256$               378$                 -­‐$                           -­‐$                           -­‐$                           -­‐$                           1,633$                          

Migration  Costs 1,624$         915$                 634$                 -­‐$                           -­‐$                           3,174$               -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                           3,174$                          Capital  Costs  Subtotal 3,615$         1,104$         823$                 -­‐$                           -­‐$                           5,541$               505$                 -­‐$                           -­‐$                           -­‐$                           -­‐$                           6,047$                          

Depreciation   1,958$         1,288$         1,296$         410$                 410$                 5,363$               328$                 290$                 94$                     94$                     94$                     6,262$                          Cash  Flow 5,305$         3,183$         3,311$         2,548$         2,609$         16,956$           3,284$         2,828$         2,894$         2,965$         3,035$         31,963$                      

Total 3,649$         3,367$         3,785$         2,958$         3,019$         16,777$           3,107$         3,119$         2,988$         3,059$         3,129$         32,178$                      

Page 21: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Total  Cost  of  OperaBon  Tenant Improvement Example

Seattle  TI/Lease   Year  1 Year  2   Year  3   Year  4 Year  5 5  year  Total Year  6 Year  7 Year  8 Year  9 Year  10 10-­‐  Year  TotalOperating  Costs

Power   297$                 320$                 345$                 371$                 400$                 1,734$               429$                 460$                 494$                 530$                 568$                 4,216$                          Predictive  Maintenance 131$                 221$                 279$                 233$                 240$                 1,104$               247$                 254$                 262$                 270$                 278$                 2,415$                          

Rent 462$                 476$                 490$                 505$                 520$                 2,453$               536$                 552$                 568$                 585$                 603$                 5,296$                          IT  Staff 250$                 258$                 265$                 273$                 282$                 1,328$               290$                 299$                 308$                 317$                 326$                 2,868$                          

Facilities  Staff 147$                 151$                 155$                 160$                 165$                 778$                       170$                 175$                 180$                 186$                 191$                 1,680$                          Telecommunications 828$                 845$                 861$                 879$                 896$                 4,309$               914$                 932$                 951$                 970$                 990$                 9,066$                          

Other  Costs -­‐$                             -­‐$                             -­‐$                             -­‐$                             -­‐$                           -­‐$                                 -­‐$                             -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                                            DC  Equipment  Sales  Tax 131$                 134$                 137$                 139$                 142$                 683$                       145$                 148$                 148$                 151$                 151$                 1,425$                          Operating  Costs  Subtotal 2,246$           2,405$           2,533$           2,561$           2,644$         12,388$           2,730$           2,820$         2,911$         3,009$         3,107$         26,966$                      

Capital  Costs  DC  TI   6,078$           -­‐$                             -­‐$                             -­‐$                             -­‐$                           6,078$               876$                 -­‐$                           -­‐$                           -­‐$                           -­‐$                           6,954$                          

Racks  /  Cabling 1,112$           -­‐$                             -­‐$                             -­‐$                             -­‐$                           1,112$               127$                 -­‐$                           -­‐$                           -­‐$                           -­‐$                           1,240$                          Network  Electronics 1,157$           -­‐$                             -­‐$                             -­‐$                             -­‐$                           1,157$               378$                 -­‐$                           -­‐$                           -­‐$                           -­‐$                           1,535$                          

Migration  Costs -­‐$                             -­‐$                             -­‐$                             -­‐$                             -­‐$                           -­‐$                                 -­‐$                             -­‐$                           -­‐$                           -­‐$                           -­‐$                           -­‐$                                            Capital  Costs  Subtotal 8,347$           -­‐$                             -­‐$                             -­‐$                             -­‐$                           8,347$               1,381$           -­‐$                           -­‐$                           -­‐$                           -­‐$                           9,728$                          

Depreciation   796$                 796$                 859$                 796$                 796$                 4,041$               716$                 716$                 557$                 557$                 557$                 7,145$                          Total 3,041$           3,200$           3,392$           3,357$           3,440$         16,429$           3,447$           3,537$         3,468$         3,566$         3,664$         34,111$                      

In thousands

Page 22: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Compare  Models  

Year  1 Year  2 Year  3 Year  4 Year  5 5  year  Total Dif  $ Dif  % 10  Year  Total Dif  $ Dif  %As-­‐Is Owned 2,929$                         3,125$                         3,461$                                 3,661$                         3,878$                         17,054$                     -­‐$                                           0% 39,639$                           -­‐$                               0%

Optimized   Owned 2,669$                         2,869$                         3,047$                                 3,232$                         3,433$                         15,251$                     (1,804)$                     -­‐11% 35,527$                           (4,112)$           -­‐10%Market  1 Co-­‐Lo 3,145$                         3,117$                         3,281$                                 3,298$                         3,383$                         16,224$                     (830)$                             -­‐5% 33,773$                           (5,866)$           -­‐15%Market  2 Co-­‐Lo 3,205$                         3,188$                         3,362$                                 3,391$                         3,489$                         16,635$                     (419)$                             -­‐2% 34,896$                           (4,743)$           -­‐12%Market  3 TI  /  Lease   4,388$                         3,653$                         3,900$                                 3,882$                         3,993$                         19,816$                     3,620$                         21% 44,423$                           4,784$             12%Market  4 Co-­‐Lo 3,327$                         3,400$                         3,610$                                 3,677$                         3,814$                         17,828$                     3,449$                         20% 38,203$                           (1,436)$           -­‐4%Market  5 TI  /  Lease   3,302$                         3,497$                         3,730$                                 3,717$                         3,823$                         18,068$                     3,447$                         20% 38,071$                           (1,569)$           -­‐4%Market  6 Co-­‐Lo 3,306$                         3,368$                         3,557$                                 3,622$                         3,746$                         17,599$                     3,425$                         20% 37,778$                           (1,861)$           -­‐5%

Annual  Operating  Costs    Years  1  -­‐10    (in  1000's)

Page 23: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Scenario  Analysis    

$1,000  

$2,000  

$3,000  

$4,000  

$5,000  

$6,000  

$7,000  

$8,000  

$9,000  

$10,000  

0 1 2 3 4 5 6 7 8 9 10

Annual    Operating  Expense  Comparison

Scenario  2 Scenario  1 Scenario  3

Annu

al  Ope

rting  Expe

nses

(1,000

's)

Year

Scenario 2$65.5M  10  Yr  TOC

Senario  1$68.1M  10  Yr  TOC

Scenario  3(Current-­‐state  with expansion)

$58.7M  10Yr  TOC2009 w/Stabalization

2009

Page 24: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Case  Studies  

Issues  

ü  Aging  primary  data  center  in  a  high  risk  region  

ü  Sub  Tier  2  design  ü  History  of  outages  ü  Running  out  of  capacity  ü  Facing  major  capital  expenditures  to  

retrofit  the  primary  data  center  ü  Lease  expiring  on  Disaster  Recovery  

site  

Results  Analysis  

ü  Assess  deficiencies  of  exisBng  faciliBes  

ü  Determine  amount  of  Bme  before  the  DC  reaches  capacity  

ü  Evaluate  low-­‐risk  markets  ü  Evaluate  own  vs.  co-­‐lo  

Outcome  ü  Move  primary  DC  to  co-­‐lo  ü  Retrofit  exisBng  DC  to  Tier  2  ü  Repurpose  exisBng  DC  to  sub-­‐

producBon  and  DR    ü  Improved  availability  with  nominal  

increases  in  TOC  

Major Regional Bank

Page 25: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Global Technology Company Case  Studies  

Issues      

ü  40+  data  centers  worldwide  ü  Growing  through  acquisiBon  ü  Unsustainable  operaBng  costs  ü  Unmanageable  data  center  

footprint  ü  Business  driver  to  consolidate  

operaBons  ü  Latency  sensiBvity  from  global  

engineering  applicaBons  

 

Results  Analysis  

ü  Assess  operaBon  efficiencies  and  costs  ü  Evaluate  mulBple  markets  and  

corporate  owned  real  estate  ü  Evaluate  geo-­‐regional  consolidaBon  

alternaBves  ü  Analyze  enterprise  architecture  ü  Evaluate  own  vs.  co-­‐lo  

Outcome  ü  Geo-­‐regional  consolidaBon  (N.A,  

ENAME,  PAC-­‐RIM)  ü  Deploy  owned  Tier  2+  ü  MulB-­‐site  recovery    ü  $100M+  10-­‐year  future  cost  avoidance  

 

Page 26: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Case  Study  

Issues  

ü  Significantly  high  energy  costs  ü  High-­‐risk  locaBon  ü  Planning  for  significant  business  

technology  iniBaBves  ü  Facing  future  capital  expenditures  

to  uplik  primary  data  center  

 

Results  

}  Analysis  ◦  Assess  deficiencies  of  exisBng  faciliBes  ◦  Determine  impact  of  new  compuBng  

demand  ◦  Evaluate  low-­‐cost  markets  ◦  Evaluate  own  vs.  co-­‐lo  

}  Outcome  ◦  Expand  primary  DC  to  co-­‐lo  ◦  Leverage  exisBng  facility  for  business  

partner  and  DR  ◦  Recommended  phased  deployment  to  

opBmize  ROI  

 

Global Entertainment Company

Page 27: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Regional Healthcare Company Case  Study  

Issues  

ü  Aging  primary  data  center  in  a  high  risk  region  

ü  Sub  Tier  2  design  ü  History  of  outages  ü  Running  out  of  capacity  ü  Facing  major  capital  expenditures  to  

retrofit  the  primary  data  center  ü  Affinity  for  in-­‐State  deployment  

 

Results  }  Analysis  ◦  Assess  deficiencies  of  exisBng  faciliBes  ◦  Assess  miBgaBon  strategies  to  buy  

Bme  ◦  Evaluate  regional  markets  ◦  Evaluate  own  vs.  co-­‐lo  

}  Outcome  ◦  Move  primary  DC  to  co-­‐lo  in  a  lower  

risk  geography  ◦  Repurpose  exisBng  DC  to  sub-­‐

producBon  and  DR  ◦  Stabilize  current  environment    ◦  Recommended  best  value  alternaBve  

 

Page 28: HOW$TO$PREPARE$ADATACENTER STRATEGY$Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal PlanNet Consulting (714) 982-5820

Thank  you  for  your  Bme!