Latitude: 43.084741° Longitude: -75.163073° Edic - New Scotland Image Date: 06.27.2018 Your Project. Visualized. www.photosims.com Photo simulation as seen looking south from Bleecker Street Simulation Date: 07.31.2018 Intended to be representative. Based on preliminary design and may be subject to update with detailed engineering. Ilion EDIC H neida Marcy Schuyler Frankfort Deerfield Ge Paris Newport He Litchfield n New Hartford Utica 3 Corresponds to 3 on the Proposed Line Map For more information, visit: www.LSPGridNewYork.com Marcy to New Scotland Upgrade Project How Will the New Lines Look?

How Will the New Lines Look? - LS Power Grid New …...Russia Pittsfield Wright Edmeston Ephratah Clifton Park Springfield Mohawk Broome Middleburgh Providence Westerlo Newport Charlton

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: How Will the New Lines Look? - LS Power Grid New …...Russia Pittsfield Wright Edmeston Ephratah Clifton Park Springfield Mohawk Broome Middleburgh Providence Westerlo Newport Charlton

Latitude: 43.084741° Longitude: -75.163073°Edic - New Scotland

Image Date: 06.27.2018

Your Project. Visualized.www.photosims.com

Photo simulation as seen looking south from Bleecker Street

Simulation Date: 07.31.2018

Intended to be representative. Based on preliminary design and may be subject to update with detailed engineering.

LittleFalls

Minden

Princetown

New Scotland

Guilderland

Ilion

NEW SCOTLAND

EDIC

ROTTERDAM

PRINCETOWN

Otsego

FultonHerkimer

Saratoga

Albany

Oneida

Schoharie

Montgomery

Schenectady

Hamilton

Madison

Chenango

Warren

Delaware

Root

Glen

Florida

Stark

Duanesburg

Marcy

Schuyler

Frankfort

Charleston

Danube

Deerfield

Canajoharie

Rotterdam

German Flatts

Berne

Salisbury

Fulton

Stratford

Knox

Corinth

Otsego

Mayfield

Colonie

Caroga

Brookfield

Benson

Edinburg

Bleecker

Johnstown

Milford

Greenfield

Floyd

Morris

Paris

Middlefield

GalwayMilton

Glenville

Arietta

Malta

Maryland

Sharon

Laurens

Warren

Fairfield

Palatine

Exeter

Summit

Perth

Oppenheim

Seward

Norway

Hartwick

Trenton

BethlehemWorcester

Carlisle

Wilton

Burlington

Russia

Pittsfield

Wright

Edmeston

Ephratah

Clifton Park

Springfield

Mohawk

Broome

Middleburgh

Providence

Westerlo

Newport

Charlton

New Lisbon

Westford

Ballston

Richfield

Broadalbin

Columbia

Herkimer

Columbus

Litchfield

Day

Kirkland

Plainfield

Manheim

Cobleskill

Ohio

Cherry Valley

Roseboom

Coeymans

New Berlin

Winfield

Schoharie

Marshall

Halfmoon

Jefferson

Northampton

Amsterdam

Decatur

Hope

Whitestown

Sangerfield

Richmondville

Bridgewater

Stillwater

Schodack

New Hartford

Esperance

Moreau

BlenheimButternutsRensselaerville

Niskayuna

St Johnsville

Lake Luzerne

Oneonta

Hadley

DavenportOtego Gilboa

Utica

Albany

Rome

Saratoga Springs

Schenectady

Amsterdam

Johnstown

GloversvilleLittle Falls

Cohoes

Rensselaer

Watervliet

Troy

LegendProposed Substations

Existing Substations

LS Power Grid New York

County Boundary

Municipal Boundary0 2 4 6 8

Miles

1 Marcy substation upgrades (by NYPA)Edic substation upgrades (by others)2

3 345kV reconductoring on existing structures (12 miles)

4 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)New double circuit 345kV monopoles. Remove two 230kV H-frames (37 miles)5

6 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (4 miles)

78 Existing 345kV Edic-New Scotland line to connect outside Princetown to one

of the new 345kV lines from Rotterdam

New double circuit 345kV monopoles. Remove two 230kV H-frames (9 miles)

New Princetown 345kV switchyard 6 position breaker and a half GIS9Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)10New Rotterdam 345kV GIS 5 position breaker and a half, 345/230kV transformer, andtwo 345/115kV transformers. Retire existing Rotterdam 230kV substation

11

New double circuit 345kV monopoles. Rebuild existing 345kV circuit on monopoles (6 miles)12

New double circuit 345kV monopoles. Remove single circuit 115kV (2 miles)14New double circuit 345kV monopoles (4 miles)13

New Scotland substation upgrades (by others)16New double circuit 345kV monopoles (6 miles)15

3

5

67

89 10

1112

13

14

15

16

Corresponds to 3 on the

Proposed Line Map

For more information, visit:www.LSPGridNewYork.com

Marcy to New Scotland Upgrade Project

How Will the New Lines Look?

Page 2: How Will the New Lines Look? - LS Power Grid New …...Russia Pittsfield Wright Edmeston Ephratah Clifton Park Springfield Mohawk Broome Middleburgh Providence Westerlo Newport Charlton

Latitude: 43.013658° Longitude: -75.073564°Edic - New Scotland

Image Date: 06.27.2018

Your Project. Visualized.www.photosims.com

Photo simulation as seen looking northwest from McGowan Road

Simulation Date: 07.31.2018

Intended to be representative. Based on preliminary design and may be subject to update with detailed engineering.

For more information, visit:www.LSPGridNewYork.com

Marcy to New Scotland Upgrade Project

How Will the New Lines Look?

LittleFalls

Minden

Princetown

New Scotland

Guilderland

Ilion

NEW SCOTLAND

EDIC

ROTTERDAM

PRINCETOWN

Otsego

FultonHerkimer

Saratoga

Albany

Oneida

Schoharie

Montgomery

Schenectady

Hamilton

Madison

Chenango

Warren

Delaware

Root

Glen

Florida

Stark

Duanesburg

Marcy

Schuyler

Frankfort

Charleston

Danube

Deerfield

Canajoharie

Rotterdam

German Flatts

Berne

Salisbury

Fulton

Stratford

Knox

Corinth

Otsego

Mayfield

Colonie

Caroga

Brookfield

Benson

Edinburg

Bleecker

Johnstown

Milford

Greenfield

Floyd

Morris

Paris

Middlefield

GalwayMilton

Glenville

Arietta

Malta

Maryland

Sharon

Laurens

Warren

Fairfield

Palatine

Exeter

Summit

Perth

Oppenheim

Seward

Norway

Hartwick

Trenton

BethlehemWorcester

Carlisle

Wilton

Burlington

Russia

Pittsfield

Wright

Edmeston

Ephratah

Clifton Park

Springfield

Mohawk

Broome

Middleburgh

Providence

Westerlo

Newport

Charlton

New Lisbon

Westford

Ballston

Richfield

Broadalbin

Columbia

Herkimer

Columbus

Litchfield

Day

Kirkland

Plainfield

Manheim

Cobleskill

Ohio

Cherry Valley

Roseboom

Coeymans

New Berlin

Winfield

Schoharie

Marshall

Halfmoon

Jefferson

Northampton

Amsterdam

Decatur

Hope

Whitestown

Sangerfield

Richmondville

Bridgewater

Stillwater

Schodack

New Hartford

Esperance

Moreau

BlenheimButternutsRensselaerville

Niskayuna

St Johnsville

Lake Luzerne

Oneonta

Hadley

DavenportOtego Gilboa

Utica

Albany

Rome

Saratoga Springs

Schenectady

Amsterdam

Johnstown

GloversvilleLittle Falls

Cohoes

Rensselaer

Watervliet

Troy

LegendProposed Substations

Existing Substations

LS Power Grid New York

County Boundary

Municipal Boundary0 2 4 6 8

Miles

1 Marcy substation upgrades (by NYPA)Edic substation upgrades (by others)2

3 345kV reconductoring on existing structures (12 miles)

4 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)New double circuit 345kV monopoles. Remove two 230kV H-frames (37 miles)5

6 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (4 miles)

78 Existing 345kV Edic-New Scotland line to connect outside Princetown to one

of the new 345kV lines from Rotterdam

New double circuit 345kV monopoles. Remove two 230kV H-frames (9 miles)

New Princetown 345kV switchyard 6 position breaker and a half GIS9Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)10New Rotterdam 345kV GIS 5 position breaker and a half, 345/230kV transformer, andtwo 345/115kV transformers. Retire existing Rotterdam 230kV substation

11

New double circuit 345kV monopoles. Rebuild existing 345kV circuit on monopoles (6 miles)12

New double circuit 345kV monopoles. Remove single circuit 115kV (2 miles)14New double circuit 345kV monopoles (4 miles)13

New Scotland substation upgrades (by others)16New double circuit 345kV monopoles (6 miles)15

1

2

3

4

5

67

89 10

1112

13

14

15

16

LittleFalls

Minden

Princetown

New Scotland

Guilderland

Ilion

NEW SCOTLAND

EDIC

ROTTERDAM

PRINCETOWN

Otsego

FultonHerkimer

Saratoga

Albany

Oneida

Schoharie

Montgomery

Schenectady

Hamilton

Madison

Chenango

Warren

Delaware

Root

Glen

Florida

Stark

Duanesburg

Marcy

Schuyler

Frankfort

Charleston

Danube

Deerfield

Canajoharie

Rotterdam

German Flatts

Berne

Salisbury

Fulton

Stratford

Knox

Corinth

Otsego

Mayfield

Colonie

Caroga

Brookfield

Benson

Edinburg

Bleecker

Johnstown

Milford

Greenfield

Floyd

Morris

Paris

Middlefield

GalwayMilton

Glenville

Arietta

Malta

Maryland

Sharon

Laurens

Warren

Fairfield

Palatine

Exeter

Summit

Perth

Oppenheim

Seward

Norway

Hartwick

Trenton

BethlehemWorcester

Carlisle

Wilton

Burlington

Russia

Pittsfield

Wright

Edmeston

Ephratah

Clifton Park

Springfield

Mohawk

Broome

Middleburgh

Providence

Westerlo

Newport

Charlton

New Lisbon

Westford

Ballston

Richfield

Broadalbin

Columbia

Herkimer

Columbus

Litchfield

Day

Kirkland

Plainfield

Manheim

Cobleskill

Ohio

Cherry Valley

Roseboom

Coeymans

New Berlin

Winfield

Schoharie

Marshall

Halfmoon

Jefferson

Northampton

Amsterdam

Decatur

Hope

Whitestown

Sangerfield

Richmondville

Bridgewater

Stillwater

Schodack

New Hartford

Esperance

Moreau

BlenheimButternutsRensselaerville

Niskayuna

St Johnsville

Lake Luzerne

Oneonta

Hadley

DavenportOtego Gilboa

Utica

Albany

Rome

Saratoga Springs

Schenectady

Amsterdam

Johnstown

GloversvilleLittle Falls

Cohoes

Rensselaer

Watervliet

Troy

LegendProposed Substations

Existing Substations

LS Power Grid New York

County Boundary

Municipal Boundary0 2 4 6 8

Miles

1 Marcy substation upgrades (by NYPA)Edic substation upgrades (by others)2

3 345kV reconductoring on existing structures (12 miles)

4 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)New double circuit 345kV monopoles. Remove two 230kV H-frames (37 miles)5

6 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (4 miles)

78 Existing 345kV Edic-New Scotland line to connect outside Princetown to one

of the new 345kV lines from Rotterdam

New double circuit 345kV monopoles. Remove two 230kV H-frames (9 miles)

New Princetown 345kV switchyard 6 position breaker and a half GIS9Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)10New Rotterdam 345kV GIS 5 position breaker and a half, 345/230kV transformer, andtwo 345/115kV transformers. Retire existing Rotterdam 230kV substation

11

New double circuit 345kV monopoles. Rebuild existing 345kV circuit on monopoles (6 miles)12

New double circuit 345kV monopoles. Remove single circuit 115kV (2 miles)14New double circuit 345kV monopoles (4 miles)13

New Scotland substation upgrades (by others)16New double circuit 345kV monopoles (6 miles)15

1

2

3

4

5

67

89 10

1112

13

14

15

16

Corresponds to 4,6 on the Proposed Line Map

Page 3: How Will the New Lines Look? - LS Power Grid New …...Russia Pittsfield Wright Edmeston Ephratah Clifton Park Springfield Mohawk Broome Middleburgh Providence Westerlo Newport Charlton

Latitude: 42.895088° Longitude: -74.629577°Edic - New Scotland

Image Date: 06.27.2018

Your Project. Visualized.www.photosims.com

Photo simulation as seen looking south from Clinton Road

Simulation Date: 07.31.2018

Intended to be representative. Based on preliminary design and may be subject to update with detailed engineering.

For more information, visit:www.LSPGridNewYork.com

Marcy to New Scotland Upgrade Project

How Will the New Lines Look?

LittleFalls

Minden

Princetown

New Scotland

Guilderland

Ilion

NEW SCOTLAND

EDIC

ROTTERDAM

PRINCETOWN

Otsego

FultonHerkimer

Saratoga

Albany

Oneida

Schoharie

Montgomery

Schenectady

Hamilton

Madison

Chenango

Warren

Delaware

Root

Glen

Florida

Stark

Duanesburg

Marcy

Schuyler

Frankfort

Charleston

Danube

Deerfield

Canajoharie

Rotterdam

German Flatts

Berne

Salisbury

Fulton

Stratford

Knox

Corinth

Otsego

Mayfield

Colonie

Caroga

Brookfield

Benson

Edinburg

Bleecker

Johnstown

Milford

Greenfield

Floyd

Morris

Paris

Middlefield

GalwayMilton

Glenville

Arietta

Malta

Maryland

Sharon

Laurens

Warren

Fairfield

Palatine

Exeter

Summit

Perth

Oppenheim

Seward

Norway

Hartwick

Trenton

BethlehemWorcester

Carlisle

Wilton

Burlington

Russia

Pittsfield

Wright

Edmeston

Ephratah

Clifton Park

Springfield

Mohawk

Broome

Middleburgh

Providence

Westerlo

Newport

Charlton

New Lisbon

Westford

Ballston

Richfield

Broadalbin

Columbia

Herkimer

Columbus

Litchfield

Day

Kirkland

Plainfield

Manheim

Cobleskill

Ohio

Cherry Valley

Roseboom

Coeymans

New Berlin

Winfield

Schoharie

Marshall

Halfmoon

Jefferson

Northampton

Amsterdam

Decatur

Hope

Whitestown

Sangerfield

Richmondville

Bridgewater

Stillwater

Schodack

New Hartford

Esperance

Moreau

BlenheimButternutsRensselaerville

Niskayuna

St Johnsville

Lake Luzerne

Oneonta

Hadley

DavenportOtego Gilboa

Utica

Albany

Rome

Saratoga Springs

Schenectady

Amsterdam

Johnstown

GloversvilleLittle Falls

Cohoes

Rensselaer

Watervliet

Troy

LegendProposed Substations

Existing Substations

LS Power Grid New York

County Boundary

Municipal Boundary0 2 4 6 8

Miles

1 Marcy substation upgrades (by NYPA)Edic substation upgrades (by others)2

3 345kV reconductoring on existing structures (12 miles)

4 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)New double circuit 345kV monopoles. Remove two 230kV H-frames (37 miles)5

6 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (4 miles)

78 Existing 345kV Edic-New Scotland line to connect outside Princetown to one

of the new 345kV lines from Rotterdam

New double circuit 345kV monopoles. Remove two 230kV H-frames (9 miles)

New Princetown 345kV switchyard 6 position breaker and a half GIS9Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)10New Rotterdam 345kV GIS 5 position breaker and a half, 345/230kV transformer, andtwo 345/115kV transformers. Retire existing Rotterdam 230kV substation

11

New double circuit 345kV monopoles. Rebuild existing 345kV circuit on monopoles (6 miles)12

New double circuit 345kV monopoles. Remove single circuit 115kV (2 miles)14New double circuit 345kV monopoles (4 miles)13

New Scotland substation upgrades (by others)16New double circuit 345kV monopoles (6 miles)15

1

2

3

4

5

67

89 10

1112

13

14

15

16

LittleFalls

Minden

Princetown

New Scotland

Guilderland

Ilion

NEW SCOTLAND

EDIC

ROTTERDAM

PRINCETOWN

Otsego

FultonHerkimer

Saratoga

Albany

Oneida

Schoharie

Montgomery

Schenectady

Hamilton

Madison

Chenango

Warren

Delaware

Root

Glen

Florida

Stark

Duanesburg

Marcy

Schuyler

Frankfort

Charleston

Danube

Deerfield

Canajoharie

Rotterdam

German Flatts

Berne

Salisbury

Fulton

Stratford

Knox

Corinth

Otsego

Mayfield

Colonie

Caroga

Brookfield

Benson

Edinburg

Bleecker

Johnstown

Milford

Greenfield

Floyd

Morris

Paris

Middlefield

GalwayMilton

Glenville

Arietta

Malta

Maryland

Sharon

Laurens

Warren

Fairfield

Palatine

Exeter

Summit

Perth

Oppenheim

Seward

Norway

Hartwick

Trenton

BethlehemWorcester

Carlisle

Wilton

Burlington

Russia

Pittsfield

Wright

Edmeston

Ephratah

Clifton Park

Springfield

Mohawk

Broome

Middleburgh

Providence

Westerlo

Newport

Charlton

New Lisbon

Westford

Ballston

Richfield

Broadalbin

Columbia

Herkimer

Columbus

Litchfield

Day

Kirkland

Plainfield

Manheim

Cobleskill

Ohio

Cherry Valley

Roseboom

Coeymans

New Berlin

Winfield

Schoharie

Marshall

Halfmoon

Jefferson

Northampton

Amsterdam

Decatur

Hope

Whitestown

Sangerfield

Richmondville

Bridgewater

Stillwater

Schodack

New Hartford

Esperance

Moreau

BlenheimButternutsRensselaerville

Niskayuna

St Johnsville

Lake Luzerne

Oneonta

Hadley

DavenportOtego Gilboa

Utica

Albany

Rome

Saratoga Springs

Schenectady

Amsterdam

Johnstown

GloversvilleLittle Falls

Cohoes

Rensselaer

Watervliet

Troy

LegendProposed Substations

Existing Substations

LS Power Grid New York

County Boundary

Municipal Boundary0 2 4 6 8

Miles

1 Marcy substation upgrades (by NYPA)Edic substation upgrades (by others)2

3 345kV reconductoring on existing structures (12 miles)

4 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)New double circuit 345kV monopoles. Remove two 230kV H-frames (37 miles)5

6 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (4 miles)

78 Existing 345kV Edic-New Scotland line to connect outside Princetown to one

of the new 345kV lines from Rotterdam

New double circuit 345kV monopoles. Remove two 230kV H-frames (9 miles)

New Princetown 345kV switchyard 6 position breaker and a half GIS9Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)10New Rotterdam 345kV GIS 5 position breaker and a half, 345/230kV transformer, andtwo 345/115kV transformers. Retire existing Rotterdam 230kV substation

11

New double circuit 345kV monopoles. Rebuild existing 345kV circuit on monopoles (6 miles)12

New double circuit 345kV monopoles. Remove single circuit 115kV (2 miles)14New double circuit 345kV monopoles (4 miles)13

New Scotland substation upgrades (by others)16New double circuit 345kV monopoles (6 miles)15

1

2

3

4

5

67

89 10

1112

13

14

15

16

Corresponds to 5,7 on the Proposed Line Map

Page 4: How Will the New Lines Look? - LS Power Grid New …...Russia Pittsfield Wright Edmeston Ephratah Clifton Park Springfield Mohawk Broome Middleburgh Providence Westerlo Newport Charlton

Latitude: 42.835071° Longitude: -74.077842°Edic - New Scotland

Image Date: 06.27.2018

Your Project. Visualized.www.photosims.com

Photo simulation as seen looking northeast from Pattersonville-Rynex Corners Rd

Simulation Date: 07.31.2018

Intended to be representative. Based on preliminary design and may be subject to update with detailed engineering.

For more information, visit:www.LSPGridNewYork.com

Marcy to New Scotland Upgrade Project

How Will the New Lines Look?

LittleFalls

Minden

Princetown

New Scotland

Guilderland

Ilion

NEW SCOTLAND

EDIC

ROTTERDAM

PRINCETOWN

Otsego

FultonHerkimer

Saratoga

Albany

Oneida

Schoharie

Montgomery

Schenectady

Hamilton

Madison

Chenango

Warren

Delaware

Root

Glen

Florida

Stark

Duanesburg

Marcy

Schuyler

Frankfort

Charleston

Danube

Deerfield

Canajoharie

Rotterdam

German Flatts

Berne

Salisbury

Fulton

Stratford

Knox

Corinth

Otsego

Mayfield

Colonie

Caroga

Brookfield

Benson

Edinburg

Bleecker

Johnstown

Milford

Greenfield

Floyd

Morris

Paris

Middlefield

GalwayMilton

Glenville

Arietta

Malta

Maryland

Sharon

Laurens

Warren

Fairfield

Palatine

Exeter

Summit

Perth

Oppenheim

Seward

Norway

Hartwick

Trenton

BethlehemWorcester

Carlisle

Wilton

Burlington

Russia

Pittsfield

Wright

Edmeston

Ephratah

Clifton Park

Springfield

Mohawk

Broome

Middleburgh

Providence

Westerlo

Newport

Charlton

New Lisbon

Westford

Ballston

Richfield

Broadalbin

Columbia

Herkimer

Columbus

Litchfield

Day

Kirkland

Plainfield

Manheim

Cobleskill

Ohio

Cherry Valley

Roseboom

Coeymans

New Berlin

Winfield

Schoharie

Marshall

Halfmoon

Jefferson

Northampton

Amsterdam

Decatur

Hope

Whitestown

Sangerfield

Richmondville

Bridgewater

Stillwater

Schodack

New Hartford

Esperance

Moreau

BlenheimButternutsRensselaerville

Niskayuna

St Johnsville

Lake Luzerne

Oneonta

Hadley

DavenportOtego Gilboa

Utica

Albany

Rome

Saratoga Springs

Schenectady

Amsterdam

Johnstown

GloversvilleLittle Falls

Cohoes

Rensselaer

Watervliet

Troy

LegendProposed Substations

Existing Substations

LS Power Grid New York

County Boundary

Municipal Boundary0 2 4 6 8

Miles

1 Marcy substation upgrades (by NYPA)Edic substation upgrades (by others)2

3 345kV reconductoring on existing structures (12 miles)

4 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)New double circuit 345kV monopoles. Remove two 230kV H-frames (37 miles)5

6 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (4 miles)

78 Existing 345kV Edic-New Scotland line to connect outside Princetown to one

of the new 345kV lines from Rotterdam

New double circuit 345kV monopoles. Remove two 230kV H-frames (9 miles)

New Princetown 345kV switchyard 6 position breaker and a half GIS9Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)10New Rotterdam 345kV GIS 5 position breaker and a half, 345/230kV transformer, andtwo 345/115kV transformers. Retire existing Rotterdam 230kV substation

11

New double circuit 345kV monopoles. Rebuild existing 345kV circuit on monopoles (6 miles)12

New double circuit 345kV monopoles. Remove single circuit 115kV (2 miles)14New double circuit 345kV monopoles (4 miles)13

New Scotland substation upgrades (by others)16New double circuit 345kV monopoles (6 miles)15

3

5

67

89 10

1112

13

14

15

16

Corresponds to 10 on the

Proposed Line Map

Page 5: How Will the New Lines Look? - LS Power Grid New …...Russia Pittsfield Wright Edmeston Ephratah Clifton Park Springfield Mohawk Broome Middleburgh Providence Westerlo Newport Charlton

Latitude: 42.778399° Longitude: -74.036544°Edic - New Scotland

Image Date: 06.26.2018

Your Project. Visualized.www.photosims.com

Photo simulation as seen looking southeast from Duanesburg Road

Simulation Date: 07.31.2018

Intended to be representative. Based on preliminary design and may be subject to update with detailed engineering.

For more information, visit:www.LSPGridNewYork.com

Marcy to New Scotland Upgrade Project

How Will the New Lines Look?LittleFalls

Minden

Princetown

New Scotland

Guilderland

Ilion

NEW SCOTLAND

EDIC

ROTTERDAM

PRINCETOWN

Otsego

FultonHerkimer

Saratoga

Albany

Oneida

Schoharie

Montgomery

Schenectady

Hamilton

Madison

Chenango

Warren

Delaware

Root

Glen

Florida

Stark

Duanesburg

Marcy

Schuyler

Frankfort

Charleston

Danube

Deerfield

Canajoharie

Rotterdam

German Flatts

Berne

Salisbury

Fulton

Stratford

Knox

Corinth

Otsego

Mayfield

Colonie

Caroga

Brookfield

Benson

Edinburg

Bleecker

Johnstown

Milford

Greenfield

Floyd

Morris

Paris

Middlefield

GalwayMilton

Glenville

Arietta

Malta

Maryland

Sharon

Laurens

Warren

Fairfield

Palatine

Exeter

Summit

Perth

Oppenheim

Seward

Norway

Hartwick

Trenton

BethlehemWorcester

Carlisle

Wilton

Burlington

Russia

Pittsfield

Wright

Edmeston

Ephratah

Clifton Park

Springfield

Mohawk

Broome

Middleburgh

Providence

Westerlo

Newport

Charlton

New Lisbon

Westford

Ballston

Richfield

Broadalbin

Columbia

Herkimer

Columbus

Litchfield

Day

Kirkland

Plainfield

Manheim

Cobleskill

Ohio

Cherry Valley

Roseboom

Coeymans

New Berlin

Winfield

Schoharie

Marshall

Halfmoon

Jefferson

Northampton

Amsterdam

Decatur

Hope

Whitestown

Sangerfield

Richmondville

Bridgewater

Stillwater

Schodack

New Hartford

Esperance

Moreau

BlenheimButternutsRensselaerville

Niskayuna

St Johnsville

Lake Luzerne

Oneonta

Hadley

DavenportOtego Gilboa

Utica

Albany

Rome

Saratoga Springs

Schenectady

Amsterdam

Johnstown

GloversvilleLittle Falls

Cohoes

Rensselaer

Watervliet

Troy

LegendProposed Substations

Existing Substations

LS Power Grid New York

County Boundary

Municipal Boundary0 2 4 6 8

Miles

1 Marcy substation upgrades (by NYPA)Edic substation upgrades (by others)2

3 345kV reconductoring on existing structures (12 miles)

4 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)New double circuit 345kV monopoles. Remove two 230kV H-frames (37 miles)5

6 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (4 miles)

78 Existing 345kV Edic-New Scotland line to connect outside Princetown to one

of the new 345kV lines from Rotterdam

New double circuit 345kV monopoles. Remove two 230kV H-frames (9 miles)

New Princetown 345kV switchyard 6 position breaker and a half GIS9Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)10New Rotterdam 345kV GIS 5 position breaker and a half, 345/230kV transformer, andtwo 345/115kV transformers. Retire existing Rotterdam 230kV substation

11

New double circuit 345kV monopoles. Rebuild existing 345kV circuit on monopoles (6 miles)12

New double circuit 345kV monopoles. Remove single circuit 115kV (2 miles)14New double circuit 345kV monopoles (4 miles)13

New Scotland substation upgrades (by others)16New double circuit 345kV monopoles (6 miles)15

1

2

3

4

5

67

89 10

1112

13

14

15

16

Corresponds to 12 on the

Proposed Line Map

Page 6: How Will the New Lines Look? - LS Power Grid New …...Russia Pittsfield Wright Edmeston Ephratah Clifton Park Springfield Mohawk Broome Middleburgh Providence Westerlo Newport Charlton

Latitude: 42.693980° Longitude: -73.984956°Edic - New Scotland

Image Date: 06.26.2018

Your Project. Visualized.www.photosims.com

Photo simulation as seen looking northwest from Frederick Road

Simulation Date: 07.31.2018

Intended to be representative. Based on preliminary design and may be subject to update with detailed engineering.

For more information, visit:www.LSPGridNewYork.com

Marcy to New Scotland Upgrade Project

How Will the New Lines Look?LittleFalls

Minden

Princetown

New Scotland

Guilderland

Ilion

NEW SCOTLAND

EDIC

ROTTERDAM

PRINCETOWN

Otsego

FultonHerkimer

Saratoga

Albany

Oneida

Schoharie

Montgomery

Schenectady

Hamilton

Madison

Chenango

Warren

Delaware

Root

Glen

Florida

Stark

Duanesburg

Marcy

Schuyler

Frankfort

Charleston

Danube

Deerfield

Canajoharie

Rotterdam

German Flatts

Berne

Salisbury

Fulton

Stratford

Knox

Corinth

Otsego

Mayfield

Colonie

Caroga

Brookfield

Benson

Edinburg

Bleecker

Johnstown

Milford

Greenfield

Floyd

Morris

Paris

Middlefield

GalwayMilton

Glenville

Arietta

Malta

Maryland

Sharon

Laurens

Warren

Fairfield

Palatine

Exeter

Summit

Perth

Oppenheim

Seward

Norway

Hartwick

Trenton

BethlehemWorcester

Carlisle

Wilton

Burlington

Russia

Pittsfield

Wright

Edmeston

Ephratah

Clifton Park

Springfield

Mohawk

Broome

Middleburgh

Providence

Westerlo

Newport

Charlton

New Lisbon

Westford

Ballston

Richfield

Broadalbin

Columbia

Herkimer

Columbus

Litchfield

Day

Kirkland

Plainfield

Manheim

Cobleskill

Ohio

Cherry Valley

Roseboom

Coeymans

New Berlin

Winfield

Schoharie

Marshall

Halfmoon

Jefferson

Northampton

Amsterdam

Decatur

Hope

Whitestown

Sangerfield

Richmondville

Bridgewater

Stillwater

Schodack

New Hartford

Esperance

Moreau

BlenheimButternutsRensselaerville

Niskayuna

St Johnsville

Lake Luzerne

Oneonta

Hadley

DavenportOtego Gilboa

Utica

Albany

Rome

Saratoga Springs

Schenectady

Amsterdam

Johnstown

GloversvilleLittle Falls

Cohoes

Rensselaer

Watervliet

Troy

LegendProposed Substations

Existing Substations

LS Power Grid New York

County Boundary

Municipal Boundary0 2 4 6 8

Miles

1 Marcy substation upgrades (by NYPA)Edic substation upgrades (by others)2

3 345kV reconductoring on existing structures (12 miles)

4 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)New double circuit 345kV monopoles. Remove two 230kV H-frames (37 miles)5

6 Two new single circuit 345kV monopoles. Remove two 230kV H-frames (4 miles)

78 Existing 345kV Edic-New Scotland line to connect outside Princetown to one

of the new 345kV lines from Rotterdam

New double circuit 345kV monopoles. Remove two 230kV H-frames (9 miles)

New Princetown 345kV switchyard 6 position breaker and a half GIS9Two new single circuit 345kV monopoles. Remove two 230kV H-frames (5 miles)10New Rotterdam 345kV GIS 5 position breaker and a half, 345/230kV transformer, andtwo 345/115kV transformers. Retire existing Rotterdam 230kV substation

11

New double circuit 345kV monopoles. Rebuild existing 345kV circuit on monopoles (6 miles)12

New double circuit 345kV monopoles. Remove single circuit 115kV (2 miles)14New double circuit 345kV monopoles (4 miles)13

New Scotland substation upgrades (by others)16New double circuit 345kV monopoles (6 miles)15

1

2

3

4

5

67

89 10

1112

13

14

15

16

Corresponds to 14, generally

representative of 13, 15 on the

Proposed Line Map