CO2Sense Yorkshire
• Established by Yorkshire Forward• Helping regional businesses to prosper in the low
carbon economy• Develop new markets for products• Access to finance• Reduce emissions by support on carbon reduction,
resource efficiency, and renewable energy
CO2Sense Renewable Energy Support
• Funding programme for regional renewable electricity and Combined Heat and Power projects
• Support for larger schemes over 50kW• Commercial funding packages up to £750,000• Dedicated support for the Woodfuel sector through
funding, specialist support and demonstration projects
CO2Sense Renewable Energy Support
Examples include:
Settle HydroCommunity owned 50kW Archimedes hydro screw
Green Frog Power4MW waste vegetable oil generatorGenerating electricity which supplies the grid and heat which is sold to a neighbouring business
Options Appraisal
• What do you want to achieve?• Expand you business and make money• Reduce your carbon footprint• Reduce the impact of rising fuel prices?• Save money
• Maximise all energy saving opportunities before considering renewable energy if you want to save money
• New financial mechanisms – FIT and RHI will make it easier to make money from renewable energy
Options Appraisal
• Resource assessment– Wind speed– River– South facing roof– Access to a biomass fuel
FeasibilitySolar
PVSolar
ThermalBiomass
HeatBiomass
CHPWind Hydro Anaerobic
Digestion
Variable?
Fuel?
Location dependent?
Cost HIGH LOW MED HIGH MED HIGH HIGH
O+M LOW LOW MED MED LOW LOW MED
Example South facing roof
South facing roof
High constant heat demand,
access to reliable
biomass source
High constant heat & elec
demand, access to reliable
biomass source
Spacious sites with a good wind resource
Location On site biomass source
Feasibility
Total capital cost £3,000,000
Total kWh generated a year 7,500,000kWh
Income from FIT £33,750 ( £0.045 * 7,500,000kWh )
Income from 50% grid sales £112,500 ( £0.03 * 3,750,000kWh )
Payback 6.6 years
Cost avoided from not purchasing from grid £375,000 ( £0.10 * 3,750,000kWh )
Carbon savings 3,225T CO2 saved per year
3MW wind turbineTime to develop = 2 years +Planning permission? = Yes
Feasibility
Total capital cost £17,500
Total kWh generated a year 3,200kWh
Income from FIT £ 1,321 ( £0.413 * 3,2000kWh )
Income from grid sales £48 ( £0.03 * 1,600kWh )
Payback 12.7 years
Cost avoided from not purchasing from grid £160 ( £0.10 * 1,600kWh )
Carbon savings 1.3T CO2 saved per year
3kW Solar PVTime to develop = < 6 monthsPlanning permission? = No (?)
Feasibility
Total capital cost £10,000
Total kWh generated a year 15,000kWh
Income from Renewable Heat Incentive from 2011 £1350 (£0.09 kWh * 15,000kWh)
Income from grid sales £0
Payback 4.7 years
Cost avoided from not purchasing from grid £750 ( £0.05 * 15,000kWh)
Cost avoided from not disposing of waste ??
Carbon savings 285T CO2 saved per year
15kW Wood Chip Boiler Using waste wood produced by the company (EA compliance)Time to develop = 6 monthsPlanning permission? = ??
Suppliers
• Feasibility assessment– Independent assessment• The technology best for you and not for the supplier• Sense check the information you are provided
• Technology and installation provider– Microgeneration Certification Scheme – Quality and experience
Planning
• Do you need planning permission?– Consult your local planning authority- PD Enquiry – Permitted development orders apply for domestic
only- consultation currently underway to extend to businesses
PlanningSolar
PVSolar
ThermalBiomass
Heat/CHPSmall Wind
Med/Large Wind
Hydro Anaerobic Digestion
Lifetime impact
Visual
Ecological
Noise
Transport
Risk LOW LOW LOW MED HIGH HIGH MED
Regulation
• Will it need permitting?– Hydro• Abstraction licence – Environment Agency
– Biomass installations• Emissions? – Environment Agency or Local Authority• Waste regulations – Environment Agency
• Grid connection– Meet YEDL regulations– Amend import to import and export connection
Funding
• Grants will be restricted with new financing tariffs– FIT and RHI
• New funding mechanisms with the arrival of the FIT– Financial support provided in return for
proportion of the FIT value– More specific loans on offer
Operation and Maintenance
• Ensure maintenance costs are included in your feasibility assessment
• Accredit your technology with Ofgem to receive your FIT entitlement
• Choose a technology with spare parts and local maintenance engineers
• Companies are on hand to do it all for you!
Questions to ask
• Why am I doing this?• Lifetime of the technology?• Does the technology come with guarrantees?• What capacity factor have been used in the
calculations?• Check your wind speed - http://www.bwea.com/noabl/index.html
• Support on offer
Jemma BensonRenewable Energy Programme
Manager