61
How Risk Management Affects Data Centre Design A Practical Approach to Complex Issues

How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Embed Size (px)

Citation preview

Page 1: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

How Risk Management Affects Data Centre Design

A Practical Approach to Complex Issues

Page 2: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

My Three Fundamental Beliefs• Facilitative Leadership

– All of our experience and expertise is of value– The diversity of our experience and expertise should not be exclusive or divisive, but rather used to help reach healthy consensus

• There are no magic bullets• Our customers don’t care about cabling

Page 3: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

In the News!• Welding mishap blamed for Amazon data center construction fire

• Cabling experts suggest FAAfire is the tip of the sabotage iceberg

• Destroyed in 60 Seconds: Riser Closets Offer Easy Target for Disgruntled Building Tenants to do Damage – Blog Article

Page 4: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Downtime Costs!Technology researcher Infonetics Research, now part of IHS, Inc. (NYSE: IHS), recently conducted in‐depth surveys with 205 medium and large businesses in North America and discovered that companies are losing as much as $100 million per year to downtime related to information and communication technology (ICT).

According to the survey, the most common causes of ICT downtime are failures of equipment, software and third‐party services; power outages; and human error. Infonetics’ respondent organizations said they experience an average of two outages and four degradations per month, with each event lasting around six hours.

“Fixing the downtime issue is the smallest cost component," adds Machowinski. "The real cost is the toll downtime takes on employee productivity and company revenue, illustrating the criticality of ICT infrastructure in the day‐to‐day operations of an organization."

Page 5: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Overview• Data centre growth is exceeding the market• Shift to managed and cloud based services• ‘Big Data’ is here to stay and is only getting bigger• Risk management should be part of every DC design, and 

operations review, but;– Are we focused too much on cataclysmic events, nefarious acts, and acts of nature?

– What about the innocent, accidental or evolutionary events that pose threats to the DC

Page 6: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Agenda• Introductions • Market Drivers and Industry Guidance• Risk Assessment Methods• Types of Risk• Group Activity and Review – Identifying Risks • Supplementary Tools & Concepts• Group Activity & Review – Making a Plan

Page 7: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

INTRODUCTIONSWho we are and what we do

Page 8: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

PresenterHenry Franc RCDD OSP CDCDP

Solutions Specialist t. 416.476.1336 

e. [email protected] Member

Member, BICSI Standards CommitteeTIA Engineering Committee Participant (Premises, Copper & Fiber)

Chair TIA TR42.3 (Pathways & Spaces)Vice Chair TIA TR42.10 (Sustainable Information Communications Technology )

Member, Standards Council of Canada (SMC/JTC1/SC25)Past Chair TR42.1 (Commercial Buildings), TR42.4 (OSP) & Editor ANSI/TIA 758

Past Member CSA T104 Standards Committee (disbanded)

Page 9: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

INDUSTRY GUIDANCEMarket Drivers and Trends

Page 10: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Lots of Buzz

Page 11: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

The World We Live In …The Internet of Everything …

Internet of Information60T web pages (Google Index, October 2014)

Internet of People1.3B Facebook active users (June 2014)

Internet of MobilityMobile devices account for 44% of all IP traffic (2013)

… Connected to 50B Things by 2020

Cisco Connections Counter, October 2014

Page 12: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

2015 Tech TrendsThe Merging of the Real and the Virtual Worlds

1 Computing Everywhere

2 Internet of Things

3 3D Printing

Intelligence Everywhere

4 Advanced Pervasive Invisible Analytics

5 Context‐Rich Systems

6 Smart Machines

IT for the Digital Business

7 Cloud/Client Architecture

8 Software‐Defined Infrastructure & Applications 

9 Web‐Scale IT

10 Risk‐Based Security & Self‐Protection 

Source: Gartner, 2014

Data Characteristics

Volume

Source

Location

Flow

Frequency

Diversity

Multiple “Layer 0”

Technologies

Required

to Support

Future Needs

Page 13: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Data CenterLAN

• Standard driven using ‘commodity’ technologies• Installed base responding to current needs• Modest growth tied to

– New construction– IP Convergence– Power‐over‐cabling– WLAN

• New technology: POLAN

Two Distinct Markets

• Rapidly transforming (and departing from LAN)• Robust growth fuelled by

−More data

− Greater bandwidth

− Improved efficiency

• Cloud providers are changing the rules!− Hotbed for new ideas, new technologies, new topologies

• Conventional and slow‐paced• Upgrade path: Cat5e/6 to Cat6A

• Dynamic and fast‐paced• Cloud vs. Enterprise segmentation leading to 

multiple roadmaps and customization

Page 14: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Evolving ICT Model

Page 15: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Data Center Options• What’s in it, where is it, how is it managed, who owns it? 

Page 16: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Data Center Investment Market Drivers

Enterprise Owned Multi‐Tenant Cloud

Infrastructure Buyer Enterprise Building: ProviderCabling: Enterprise Provider

Investment Large Capital Capital / Operational Operational

Agility / Scalability Low Med High

Performance “Best Compliant” “Min Compliant” “Purpose Built” 

Technology (Cloud, Mobility, Performance) Standard driven Pick & Choose Bleeding Edge

Monthly bill for gas, electric, water, data…

HSA

CloudMulti-TenantEnterprise Owned

25G

Optical Shuffle

White Boxes

Leaf‐Spine

Stimulates Innovation

Page 17: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Data Center Market Segments

Cloud$1.1B TAM, +31% CAGR

Enterprise Owned$3.4B TAM, -4% CAGR

Sources: Dell Oro, Gartner, 451, Cicso Networking Report, Facebook VOC

Multi-Tenant$1.2B TAM, +2% CAGR

Key Attributes:• Capital investment model

for new builds• Cloud applications and

virtualization driving segment decline

• Full spectrum of scale and technologies reside in enterprise owned DCs

Key Attributes:• IT owned by enterprise

client, while space and power are leased

• Multi-tenant providers seeking differentiation are expanding into hosting services

Key Attributes:• Operating expense model

for clients• Enabler of accelerating

mobile / cloud usage• Competitive advantage lies

in DC performance: driving custom switches and servers (white box)

Cloud Server Shipments Will Exceed Enterprise Server Shipments by 2018

Page 18: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Technology Trends

Passive Optical LAN

HDBaseT 2.0

40G/100GHSA 10GBASE‐T

802.11ac Wave 2

40G BiDi

25G/50G/100G

40GBASE‐TCategory 8

20152020

HIGHLOW

R&D

COMMERCIAL MATURITY 40G –SR4

100G –SR10

GROWTH POTENTIAL

EARLY DEPLOYMENT

Power over Cabling

?

LAN DC

?

2015

?

Ultra Wideband MMF

?

Silicon Photonics

25G/50G/100G

Page 19: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Continuity and Availability

• It’s all about availability– Which includes resiliency, redundancy, and recovery 

• Many methods– Uptime Tiers 

• Tier 1 – Single Path ~ 99.67%• Tier 2 – Single path with redundant components ~ 99.75%• Tier 3 – Concurrently maintainable and operable ~ 99.98%• Tier 4 – Fault tolerant ~ 99.99%Note: these are guidelines and targets not guarantees also there are no half steps for Uptime e.g. Tier III.5 or mixed tiers

– BICSI, TIA, Others

Page 20: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Redundancy• There are multiple ways of achieving, expressing and measuring redundancy– N – basic requirement, no redundancy– N+1 – provides one additional unit/module/path/system  in addition to the basic requirement

– N+2 – provides two additional u/m/p/s in addition to the basic requirement

– 2N – provides two complete ‘basic’ requirements– 2(N+1) – provides two complete (N+1) units 

Page 21: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Redundancy – Not Clear Cut• Sometimes it’s easier to see – lets use the birthday example a birthday party for my daughter and 4 guests

Page 22: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Redundancy – Multiple Systems• But that was only one system … we have many

Page 23: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

One Size Doesn’t Fit All• Most Systems are similair but use different terms

– BICSI uses Facility Availability Classes (F0‐F4 for different classes of availability)– TIA uses the TEAM (Telecommunications, Electrical, Architectural, Mechanical) – Ratings (TIA) /Classes (BICSI) /Tiers (Uptime) build upon each other

• Type 1 – Basic requirements• Type 2 – All Type 1 requirements plus ‘some’ redundant components / systems  and 

additional  requirements• Type 3 – All Type 1 & 2 requirements plus duplicate services / systems and additional 

requirements• Type 4 – All Type 1, 2 & 3 requirements plus redundant components / systems / services 

and additional requirements

Note:  All services do not have to be at the same class (for TIA)  e.g. T1E2A1M2

Page 24: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Lets Take a Break

Page 25: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

RISK ASSESSMENTMethods for 

Page 26: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

What is it?

Page 27: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

What Not to Do … Other than Keep Calm

Page 28: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Basic Premise and Concept• Risk management is a ‘process’

Page 29: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Control

• Control cannot be achieved without  an effective all encompassing security program 

• In isolation tools, processes and countermeasures are not enough

Page 30: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Components of Risk Management• A multi‐step process• Plan for the known and 

unknown• Regular review should 

be mandatory• Should adapt to 

changing requirements (assets), threats and vulnerabilities

• Some risks can’t be seen• Some threats can’t be 

avoided• Sometimes 

countermeasures will fail• What happens when 

during an outage?

Page 31: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Situational Analysis

• A thorough analysis should be done, and there are many tools

• A common tool is the SWOT analysis

• It changes based on perspective owner, provider, partner etc.

Page 32: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Threat Evaluation• Threats 

– Probability– Impact: scale, recovery and operational

• Basic Evaluation– Red (Critical) needs attention– Amber (Warning) may require attention– Green (‘OK’) no attention required

• Once evaluated priorities can be set– Controls designed/implemented– Countermeasures prepared

Button5 Button10 Button15 Button20 Button25

Button4 Button8 Button12 Button16 Button20

Button3 Button6 Button9 Button12 Button15

Button2 Button4 Button6 Button8 Button10

Button1 Button2 Button3 Button4 Button5

Very High

5

High

4

Medium

3

Low

2

Very Low

1

Very High

5

High

4

Medium

3

Low

2

Very Low

1

Impact

Prob

ability

Page 33: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

RISKMany Shades of 

Page 34: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Vulnerabilities & Risks• There are many types of vulnerabilities that have risk attached– Facilities (TEAM)– Systems & software– People– Processes– Products (can also be a viewed as a subset)

Page 35: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

TEAM ‐ Telecommunications• Telecommunications guidance

– Standards compliance– Diversity & redundancy 

• What’s the difference?• What about recovery and continuity?

– Cabling & pathways– Power supplies, fan trays, uplinks etc.– Administration and management

Page 36: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

TEAM ‐ Electrical• Electrical guidance

Maintenance  Monitoring/analysis Points of failureUtilities UPS PDU Transfer switch(s) Grounding (protection) Emergency Power Off (EPO)Batteries Standby Generation Fuel ConsiderationsLoadbank & Testing Topology

Page 37: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

TEAM ‐ Architectural• Architectural guidance

– Site Selection (floods, airports, proximity to services etc.)– Access (parking, roadways etc.)– Type of construction (structural, tenancy, roofing, doors, windows etc.)– Organization of spaces (administration, entry, loading dock, washrooms etc.)

– Special considerations (security, fuel/generator/batteries, monitoring, bullet resistance etc.)

Page 38: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

TEAM ‐Mechanical• Mechanical guidance

Redundancy Pipe routing DrainsAir pressure (+/‐) Drains Cooling systemsHeat rejection HVAC controls Fuel oil system requirementsFire suppression Smoke detection Water leak detection

Page 39: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Published Guidance• Most published guidance is about failure, acts of nature and/or nefarious acts– What about change, accidental, innocent, evolutionary, business and other risks?

– People make mistakes– Processes have gaps– Products wear, fail, or can be improperly used

Page 40: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Regulatory Compliance

Payment Card IndustryData Security Standards

Federal Information Security Management Act

(FISMA) Statement on Standards for Attestation Engagements

(SSAE)

Page 41: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Lets Take a Break

Page 42: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

RISK ASSESSMENTGroup Activity 

Page 43: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

TOOLS & CONCEPTSSupplementary

Page 44: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

The Ones You Don’t See Coming• The Sunscreen song:

“Don't worry about the future; or worry, but know that worrying is as effective as trying to solve an algebra equation by chewing bubblegum.  The real troubles in your life are apt to be things that never crossed your worried mind.  The kind that blindside you at 4pm on some idle Tuesday.”

• A recent survey of DC & IT operations professionals had interesting results:

– On average 2 downtime events per respondent in the 2 year study period– 62% of IT executives believed unplanned outages don’t happen frequently (41% rank and file 

agreed with this assessment)– 75% of senior level respondents believed they fully support efforts to prevent and manage 

unplanned outages (31% of supervisory and lower staff agreed with the statement)

Page 45: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Examples TEAM

• Events– Patching the wrong port– Accidental removal of patching

– Dirty fiber– Design mismatch

• Countermeasures– DCIM, AIM, asset management

– Traceable cords– Tabs & locks– Design review– Labelling and administration

Page 46: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Examples TEAM

• Events– Phase balancing– Load sharing– Plug removal– Panel access– Breaker trip, fuse removal– EPO

• Countermeasures– Labelling and administration– Metering, monitoring, DCIM– Locks and clips– Design review (BIM)– Finger guards– AHJ coordination/covers

Page 47: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Examples TEAM

• Events– Door height/width– Loading docks– Access/security bypass– Location (flood plain)– Address

• Countermeasures– Procedural checklists– Shipment/material verification

– Security audit– Monitoring and surveillance

Page 48: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Examples TEAM

• Events– Airflow blockage– Air bypass– Venturi effect– Aisle alignment– Containment ‘work‐arounds’

• Countermeasures– Cross‐team collaboration and coordination

– Work flow management– Commissioning– Design review– Monitoring and alarms– DCIM

Page 49: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Examples Systems and Software

• Events– Decreasing budgets (loss/length)

– Connector wars– Polarity– Software– Airflow mismatch

• Countermeasures– Factory terminations– Solution flexibility and common footprint

– Common‐sense design– Workflow process– Connectivity management (DCIM)

Page 50: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Examples People

• Events– Language barriers (acronyms, 

terms, understanding etc.)– Lack of skilled/qualified resources– Human nature (multi‐tasking, 

assuming, shortcuts)– Honest mistakes– Tools

• Countermeasures– Training & equipment– Skills mapping– Established & documented 

workflow– Monitoring and surveillance– Dispatch management and alarms– Asset and connectivity 

management (DCIM)

Page 51: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Examples Processes

• Events– Wrong disconnect– Unscheduled disconnect– Load balancing– Stop work / shutdowns– Scheduling conflicts, multi‐disciplinary conflict

• Countermeasures– Workflow documentation– Audit and review– Monitoring and alarms– Dispatch management– DCIM, asset and connectivity management

Page 52: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Examples Products

• Events– Product mismatch (Category/Class/Connector)

– Polarity and pinning– Product availability– Explosion of SKUs– Wear and tear

• Countermeasures– Solution commonality– Product rationalization– Standards based design– Modular design– Common building blocks– Spares & ERKs (Emergency restoration kits)

Page 53: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Create a Project Charter • char∙ter ˈCHärdər/

nounnoun: charter; plural noun: charters1.  a written grant by a country's legislative or sovereign power, by which an institution such as a company, college, or city is created and its rights and privileges defined.

• Essentially a definition– Concept– Goals, objectives and constraints– Specifications – Measures of success

• Aligns and focuses the team

Page 54: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Dealing with Issues (FSNP)

• Understand:– Tribalism – Motives – Point of view

• Manage Conflict– Compete, collaboration, compromise, avoid, accommodation

FormingLearning about each other

F

StormingChallenging each other

S

NormingWorking with each other

N

PerformingWorking as one

P

Page 55: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Growth and Evolution in the DC• Green Grid

– Expects organizations to progress through the model

– Encourages to move up when feasible taking into account business and facility constraints

• Not just regarding efficiency– Changes in organization, business model– Technology capabilities and requirements

Page 56: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

RACI Matrix

• What is a RACI Matrix?“A responsibility assignment matrix (RAM), also known as RACImatrix /ˈreɪsiː/ or ARCI matrix or linear responsibility chart (LRC), describes the participation by various roles in completing tasks or deliverables for a project or business process.” ‐Wikipedia

Accountable

RACI ConsultedResponsible

Informed

ARRR

CCCCCCIIIIIIIIIIIIIIIIIII

The RACI Triangle

Page 57: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

How to Use a RACI Matrix• Mapping overall risk management 

RAM– Sub‐sets of the procedures– Good for what‐if scenarios

• Any component of the RACI matrix may have no, one or more levels of expectation of a particular function in the matrix

• Ensures accountability through all steps and roles

Page 58: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Objectives• Primary objectives of a risk management plan:

– Identification of potential for negative events and their causes– Reduction of negative events (e.g., errors, outages, loss of data etc.)

– Recovery from negative events– Limit impacts of negative events– Review events to evolve the risk management plan

Page 59: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

MAKING A PLANGroup Activity & Review

Page 60: How Risk Management Affects Data Centre Design - · PDF fileHow Risk Management Affects Data Centre Design ... – TIA uses the TEAM ... Maintenance Monitoring/analysis Points of failure

Sidebar – New In Standards

• New DRAFT Addendum to ANSI/TIA‐598‐D.1 in ballot stage, additional colours for fiber– Because of MPO(16) & MPO(32)

– Lime, Tan, Olive, Magenta– For 17‐32 black tracer– For >32 different tracers