18
RYLC 2013

How i gip

Embed Size (px)

DESCRIPTION

iGIP Process

Citation preview

Page 1: How i gip

RYLC 2013

Page 2: How i gip

RYLC 2013

Check-In

Day 1 Recap

Page 3: How i gip

RYLC 2013

How We do iGIP?

Page 4: How i gip

RYLC 2013

iGIP

Realisa-tion

MatchRaise

Page 5: How i gip

RYLC 2013

A raise is when we create an opportunity

for an international intern to work in the

Indian corporate sector.

Raise

Page 6: How i gip

RYLC 2013

When organization selects and confirms an Exchange

Participant for the internship, it’s a match.

Match

Page 7: How i gip

RYLC 2013

Arrival and Integration of the international with the

LC and the company.

Realisa-tion

Page 8: How i gip

RYLC 2013

Market Research

Cold Calling, Appointments and Follow-Up

Contract with the company

(Raise)

Searching for the suitable candidate

Interview

MatchingPre-arrival

expectation setting

Realization

Ongoing Evaluation

Page 9: How i gip

RYLC 2013

Market Research

• Market evaluation • Potential Client Data base • Client Background Check

Page 10: How i gip

RYLC 2013

• Calling the Client to fix an appointment

• Well Structured appointment • Regular follow up

Cold Calling, Appointments and Follow-Up

Page 11: How i gip

RYLC 2013

• Expectation Settings• Intern Job

Questionnaire • Signing of the MOU

Contract with the company

(Raise)

Page 12: How i gip

RYLC 2013

• Uploading the TN form on myaiesec.net

• Promotion of the TN• Finding the candidate as per

the client requirements.

Searching for the suitable candidate

Page 13: How i gip

RYLC 2013

• Having the 1st round of the interview.

• Finalization the most appropriate list of candidature

• Having the 2nd round of the interview with the company

Interview

Page 14: How i gip

RYLC 2013

• Agreement of both the EP and the company.

• Sending all the required documentation for Visa

Matching

Page 15: How i gip

RYLC 2013

• Sending Reception Package

• Reality check of INDIA• Proper expectation

setting

Pre-arrival expectation

setting

Page 16: How i gip

RYLC 2013

• Intern arrival and pick up• Post arrival expectation

setting.• Integration into the

company and the LC.

Realization

Page 17: How i gip

RYLC 2013

• Monthly feedback from both the EP and the Client.

• Problem management.• Client and EP case studies.

Ongoing Evaluation

Page 18: How i gip

RYLC 2013

iGIP are you ready?