1
How do we decidewhich roads to fix when there is not
enough money to fix everything?
4
Outline
• Pavement condition assessment.
• Key concepts for pavement preservation.
• Selecting projects under a preservation strategy.
• Three Steps to Implement a preservation strategy for local roads.
5
Surface Rating Survey
6
Pavement Surface Rating
10 – 9: Excellent7 – 8: Good
6: Fair<5: Poor
7
Pavement Surface Rating
10 – 9: Do Nothing8: Crack Seal7: PM Paving6: Rehab5: Major Rehab
<5: Replace
PavementSurface Rating
Ride Quality (IRI)
PavementCondition Index
(PCI)
9
9/10 – Excellent
8 - Good
7 - Good
6 - Fair
5 - Poor
4 - Poor
3 - Very Poor
172 - Very Poor
1 - Very Poor
19
E-Score Hardware
24
Pavement Management
Pavement Preservation Strategy
26
What are we trying to do with Preventive Maintenance?
• Seal cracks to keep water out
• Rejuvenate a weathered surface
• Prolong life of the pavement
• Non-structural
5
6
7
8
9
10
Time
Con
dit io
n R
atin
g
Pavement Performance Curveand Windows of OpportunityDo Nothing
Non-Paving PM
PM Paving
Multi-Course
Major Rehab/Recon
$1
$4
$16
PM Overlay by Initial Surface Score
5
6
7
8
9
10
Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9Y10 Y11
Project Age
Surfa
ce S
core Score 6
Score 7
Pavement Management
Why does pavement preservation work?
20105 15 25 30
6
7
8
9
10
5
Years
Typical Pavement Deterioration Curvefrom Surface Score History
0
Flex/Overlay
20105 15 25 30
6
7
8
9
10
5
Years0
20105 15 25 30
6
7
8
9
10
5
Years0
20105 15 25 30
6
7
8
9
10
5
Years0
20105 15 25 30
6
7
8
9
10
5
Years0
$125k $125k $500k
20105 15 25 30
6
7
8
9
10
5
Years0
$750k $1.5M
Poor Fair Good Excel
Lane
Mile
s
Poor Fair Good Excel
Lane
Mile
sWorst First
Poor Fair Good Excel
Lane
Mile
sWorst First
Poor Fair Good Excel
Lane
Mile
sWorst First
Poor Fair Good Excel
Lane
Mile
sWorst First
Poor Fair Good Excel
Lane
Mile
sWorst First
Poor Fair Good Excel
Lane
Mile
s Worst First
Poor Fair Good Excel
Lane
Mile
s Worst First
Poor Fair Good Excel
Lane
Mile
s Worst First
Poor Fair Good Excel
Lane
Mile
s Worst First
Poor Fair Good Excel
Lane
Mile
s
Poor Fair Good Excel
Lane
Mile
s
Pavement Preservation
Poor Fair Good Excel
Lane
Mile
s
Pavement Preservation
Poor Fair Good Excel
Lane
Mile
s
Pavement Preservation
Poor Fair Good Excel
Lane
Mile
s
Pavement Preservation
Poor Fair Good Excel
Lane
Mile
s
Pavement Preservation
Poor Fair Good Excel
Lane
Mile
s
Pavement Preservation
Poor Fair Good Excel
Lane
Mile
s
Pavement Preservation
Poor Fair Good Excel
Lane
Mile
s
Pavement Preservation
Far less expensive to keep good pavements good.
Treat the pavement early before distress becomes severe.
The time window is narrow for optimal performance.
#1
#3
PM Overlay by Initial Surface Score
5
6
7
8
9
10
Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9Y10Y11
Project Age
Surfa
ce S
core Score 6
Score 7
#2
Poor Fair Good Excel
Lane
Mile
s
Key Concept of Pavement Preservation
Pavement Preservation Tools• Crack Sealing• Chip Seal• Quick-set Slurry• Microsurfacing• Paver-Placed
Surface Treatment• 6.3mm HMA• Single Course HMA• Mill and Fill• Cold Recycling
Crack Sealing
No.
Preservation Strategy
• Keep good pavement good.
• Choose the right treatment at the right time.
• Serve the most number of travelers with each dollar.
• Prioritize segments by cost effectiveness ($/VMT).
VMT
$ $$ $$
$$
“Cost Effectiveness”
$ / VMT
66
70
71
Pavement Management
How do I implement a preservation strategy for
my roads?
74
Step 1: Road Inventory
• Lay out Linear Reference
• Define road characteristics
• Create Rating Segments– Base on Maintenance history– Avoid short segments
75
Step 2: Condition Assessment
• Choose an assessment method
• Keep it simple
• Annual or biannual cycle
76
Step 3: Prioritization Strategy
• Preservation ($/VMT)
• Worst-first
• Minimum conditions
• System Tier
The End.