Abernethy Rd Leach Hwy Abernethy Rd Leach Hwy Abernethy Rd Leach Hwy Abernethy Rd Leach Hwy Abernethy Rd Leach Hwy Abe Leach Hwy Abe Leach Hwy GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT REVISION SCALE REVISION DATE DRAWING No. DATUM AHD PROJECT ZONE A B C D E F D E A B C F 1 2 3 4 5 6 7 8 SAS - BLUE PRINT INVESTAGATION DRAWING SCID, CSD AND DBYD DATA AREA 4 - SHEET 07 04-070-SE-SK-4107 OCT 1:250@A0 29.08.14 PCG94 1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR ANY PERMIT TO DIG. 2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED DATA. 3. POTHOLES ARE SHOWN AS A SYMBOL. 4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER. 5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS. 6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE ADDED ON REQUEST. 7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011. GENERAL NOTES KEYPLAN LEGEND GAS COMMUNICATIONS POWER LV SEWER WATER REDUNDANT OR UNKNOWN DRAINAGE POWER HV BP FUEL POTHOLE POINT SURVEY POINT 0 25 50 10 20 30 40 5 GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT REVISION SCALE REVISION DATE DRAWING No. DATUM AHD PROJECT ZONE A B C D E F D E A B C F 1 2 3 4 5 6 7 8 SAS - BLUE PRINT INVESTAGATION DRAWING SCID, CSD AND DBYD DATA AREA 4 - SHEET 07 04-070-SE-SK-4107 OCT 1:250@A0 29.08.14 PCG94 1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR ANY PERMIT TO DIG. 2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED DATA. 3. POTHOLES ARE SHOWN AS A SYMBOL. 4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER. 5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS. 6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE ADDED ON REQUEST. 7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011. GENERAL NOTES KEYPLAN LEGEND GAS COMMUNICATIONS POWER LV SEWER WATER REDUNDANT OR UNKNOWN DRAINAGE POWER HV BP FUEL POTHOLE POINT SURVEY POINT 0 25 50 10 20 30 40 5 GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT REVISION SCALE REVISION DATE DRAWING No. DATUM AHD PROJECT ZONE A B C D E F D E A B C F 1 2 3 4 5 6 7 8 SAS - BLUE PRINT INVESTAGATION DRAWING SCID, CSD AND DBYD DATA AREA 4 - SHEET 07 04-070-SE-SK-4107 OCT 1:250@A0 29.08.14 PCG94 1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR ANY PERMIT TO DIG. 2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED DATA. 3. POTHOLES ARE SHOWN AS A SYMBOL. 4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER. 5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS. 6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE ADDED ON REQUEST. 7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011. GENERAL NOTES KEYPLAN LEGEND GAS COMMUNICATIONS POWER LV SEWER WATER REDUNDANT OR UNKNOWN DRAINAGE POWER HV BP FUEL POTHOLE POINT SURVEY POINT 0 25 50 10 20 30 40 5 GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT REVISION SCALE REVISION DATE DRAWING No. DATUM AHD PROJECT ZONE A B C D E F D E A B C F 1 2 3 4 5 6 7 8 SAS - BLUE PRINT INVESTAGATION DRAWING SCID, CSD AND DBYD DATA AREA 4 - SHEET 07 04-070-SE-SK-4107 OCT 1:250@A0 29.08.14 PCG94 1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR ANY PERMIT TO DIG. 2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED DATA. 3. POTHOLES ARE SHOWN AS A SYMBOL. 4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER. 5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS. 6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE ADDED ON REQUEST. 7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011. GENERAL NOTES KEYPLAN LEGEND GAS COMMUNICATIONS POWER LV SEWER WATER REDUNDANT OR UNKNOWN DRAINAGE POWER HV BP FUEL POTHOLE POINT SURVEY POINT 0 25 50 10 20 30 40 5 GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT REVISION SCALE REVISION DATE DRAWING No. DATUM AHD PROJECT ZONE A B C D E F D E A B C F 1 2 3 4 5 6 7 8 SAS - BLUE PRINT INVESTAGATION DRAWING SCID, CSD AND DBYD DATA AREA 4 - SHEET 07 04-070-SE-SK-4107 OCT 1:250@A0 29.08.14 PCG94 1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR ANY PERMIT TO DIG. 2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED DATA. 3. POTHOLES ARE SHOWN AS A SYMBOL. 4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER. 5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS. 6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE ADDED ON REQUEST. 7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011. GENERAL NOTES KEYPLAN LEGEND GAS COMMUNICATIONS POWER LV SEWER WATER REDUNDANT OR UNKNOWN DRAINAGE POWER HV BP FUEL POTHOLE POINT SURVEY POINT 0 25 50 10 20 30 40 5 GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT REVISION SCALE REVISION DATE DRAWING No. DATUM AHD PROJECT ZONE A B C D E F D E A B C F 1 2 3 4 5 6 7 8 SAS - BLUE PRINT INVESTAGATION DRAWING SCID, CSD AND DBYD DATA AREA 4 - SHEET 07 04-070-SE-SK-4107 OCT 1:250@A0 29.08.14 PCG94 1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR ANY PERMIT TO DIG. 2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED DATA. 3. POTHOLES ARE SHOWN AS A SYMBOL. 4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER. 5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS. 6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE ADDED ON REQUEST. 7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011. GENERAL NOTES KEYPLAN LEGEND GAS COMMUNICATIONS POWER LV SEWER WATER REDUNDANT OR UNKNOWN DRAINAGE POWER HV BP FUEL POTHOLE POINT SURVEY POINT 0 25 50 10 20 30 40 5 HOW A BLUE PRINT WORKS The satellite image is your base reference point for your work area. This allows you to reference your work to your surrounding. The satellite image is updated every 3 months. Survey points identify a known point. Surveyors can peg these out for you. Survey points are broken up into two types. Pothole points created using vacuum trucks, GPR and survey. Gateway survey points taken as the service was installed Pothole Points Gateway Points The opaque blue is the work within boundary for this project. It has changed and will keep changing during the life of this project. Finished Drawing This is the finished design. When the project is complete this will line up with the satellite background. This design can be swapped out for different stages or different sections of work to better clarify the extents of your work area. Services area shown over the top of all the layered information.The data is represented in two ways. DBYD data collected from the asset owners. Installed services by Gateway Leach Design Abernethy Design DBYD with Survey Installed with Survey REVISION SCALE REVISION DATE DRAWING No. DATUM AHD PROJECT ZONE A 04-070-SE-SK-4107 OCT 1:250@A0 29.09.14 PCG94 The data on each drawing is updated at the beginning of each month. The drawing is valid for that month only. Check the month in the revision box before filling out you permit

How a Blue Print works

Embed Size (px)

Citation preview

Page 1: How a Blue Print works

Abernethy R

d

Leach H

wy

Abernethy R

d

Leach H

wy

Abernethy R

d

Leach H

wy

Abernethy R

d

Leach H

wy

Abernethy R

d

Leach H

wy

Abernethy R

d

Leach H

wy

Abernethy R

d

Leach H

wy

GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT

REVISION

SCALE REVISION DATE

DRAWING No.

DATUM

AHD

PROJECT ZONE

A

B

C

D

E

F

D

E

A

B

C

F

1 2 3 4 5 6 7 8

SAS - BLUE PRINT INVESTAGATION DRAWING

SCID, CSD AND DBYD DATA

AREA 4 - SHEET 07

04-070-SE-SK-4107 OCT

1:250@A0 29.08.14

PCG94

1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR

ANY PERMIT TO DIG.

2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED

DATA.

3. POTHOLES ARE SHOWN AS A SYMBOL.

4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER.

5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS.

6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS

DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE

ADDED ON REQUEST.

7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011.

GENERAL NOTES

KEYPLAN LEGEND

GAS

COMMUNICATIONS

POWER LV

SEWER

WATER

REDUNDANT OR UNKNOWN

DRAINAGE

POWER HV

BP FUEL

POTHOLE POINT

SURVEY POINT

0

25

5010 20 30 40

5

GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT

REVISION

SCALE REVISION DATE

DRAWING No.

DATUM

AHD

PROJECT ZONE

A

B

C

D

E

F

D

E

A

B

C

F

1 2 3 4 5 6 7 8

SAS - BLUE PRINT INVESTAGATION DRAWING

SCID, CSD AND DBYD DATA

AREA 4 - SHEET 07

04-070-SE-SK-4107 OCT

1:250@A0 29.08.14

PCG94

1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR

ANY PERMIT TO DIG.

2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED

DATA.

3. POTHOLES ARE SHOWN AS A SYMBOL.

4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER.

5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS.

6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS

DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE

ADDED ON REQUEST.

7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011.

GENERAL NOTES

KEYPLAN LEGEND

GAS

COMMUNICATIONS

POWER LV

SEWER

WATER

REDUNDANT OR UNKNOWN

DRAINAGE

POWER HV

BP FUEL

POTHOLE POINT

SURVEY POINT

0

25

5010 20 30 40

5

GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT

REVISION

SCALE REVISION DATE

DRAWING No.

DATUM

AHD

PROJECT ZONE

A

B

C

D

E

F

D

E

A

B

C

F

1 2 3 4 5 6 7 8

SAS - BLUE PRINT INVESTAGATION DRAWING

SCID, CSD AND DBYD DATA

AREA 4 - SHEET 07

04-070-SE-SK-4107 OCT

1:250@A0 29.08.14

PCG94

1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR

ANY PERMIT TO DIG.

2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED

DATA.

3. POTHOLES ARE SHOWN AS A SYMBOL.

4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER.

5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS.

6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS

DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE

ADDED ON REQUEST.

7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011.

GENERAL NOTES

KEYPLAN LEGEND

GAS

COMMUNICATIONS

POWER LV

SEWER

WATER

REDUNDANT OR UNKNOWN

DRAINAGE

POWER HV

BP FUEL

POTHOLE POINT

SURVEY POINT

0

25

5010 20 30 40

5

GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT

REVISION

SCALE REVISION DATE

DRAWING No.

DATUM

AHD

PROJECT ZONE

A

B

C

D

E

F

D

E

A

B

C

F

1 2 3 4 5 6 7 8

SAS - BLUE PRINT INVESTAGATION DRAWING

SCID, CSD AND DBYD DATA

AREA 4 - SHEET 07

04-070-SE-SK-4107 OCT

1:250@A0 29.08.14

PCG94

1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR

ANY PERMIT TO DIG.

2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED

DATA.

3. POTHOLES ARE SHOWN AS A SYMBOL.

4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER.

5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS.

6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS

DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE

ADDED ON REQUEST.

7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011.

GENERAL NOTES

KEYPLAN LEGEND

GAS

COMMUNICATIONS

POWER LV

SEWER

WATER

REDUNDANT OR UNKNOWN

DRAINAGE

POWER HV

BP FUEL

POTHOLE POINT

SURVEY POINT

0

25

5010 20 30 40

5

GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT

REVISION

SCALE REVISION DATE

DRAWING No.

DATUM

AHD

PROJECT ZONE

A

B

C

D

E

F

D

E

A

B

C

F

1 2 3 4 5 6 7 8

SAS - BLUE PRINT INVESTAGATION DRAWING

SCID, CSD AND DBYD DATA

AREA 4 - SHEET 07

04-070-SE-SK-4107 OCT

1:250@A0 29.08.14

PCG94

1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR

ANY PERMIT TO DIG.

2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED

DATA.

3. POTHOLES ARE SHOWN AS A SYMBOL.

4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER.

5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS.

6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS

DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE

ADDED ON REQUEST.

7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011.

GENERAL NOTES

KEYPLANLEGEND

GAS

COMMUNICATIONS

POWER LV

SEWER

WATER

REDUNDANT OR UNKNOWN

DRAINAGE

POWER HV

BP FUEL

POTHOLE POINT

SURVEY POINT

0

25

5010 20 30 40

5

GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT

REVISION

SCALE REVISION DATE

DRAWING No.

DATUM

AHD

PROJECT ZONE

A

B

C

D

E

F

D

E

A

B

C

F

1 2 3 4 5 6 7 8

SAS - BLUE PRINT INVESTAGATION DRAWING

SCID, CSD AND DBYD DATA

AREA 4 - SHEET 07

04-070-SE-SK-4107 OCT

1:250@A0 29.08.14

PCG94

1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR

ANY PERMIT TO DIG.

2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED

DATA.

3. POTHOLES ARE SHOWN AS A SYMBOL.

4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER.

5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS.

6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS

DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE

ADDED ON REQUEST.

7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011.

GENERAL NOTES

KEYPLAN LEGEND

GAS

COMMUNICATIONS

POWER LV

SEWER

WATER

REDUNDANT OR UNKNOWN

DRAINAGE

POWER HV

BP FUEL

POTHOLE POINT

SURVEY POINT

0

25

5010 20 30 40

5

HOW A BLUE PRINT WORKS

The satellite image is your

base reference point for

your work area. This allows

you to reference your work

to your surrounding. The

satellite image is updated

every 3 months.

Survey points identify a

known point. Surveyors can

peg these out for you. Survey

points are broken up into two

types.

Pothole points created using

vacuum trucks, GPR and

survey.

Gateway survey points taken

as the service was installed

Pothole Points

Gateway Points

The opaque blue is the work

within boundary for this

project. It has changed and

will keep changing during

the life of this project.

Finished Drawing

This is the finished design.

When the project is complete

this will line up with the

satellite background.

This design can be swapped

out for different stages or

different sections of work to

better clarify the extents of

your work area.

Services area shown over

the top of all the layered

information.The data is

represented in two ways.

DBYD data collected from

the asset owners.

Installed services by

Gateway

Leach DesignAbernethy Design

DBYD with SurveyInstalled with Survey

REVISION

SCALE REVISION DATE

DRAWING No.

DATUM

AHD

PROJECT ZONE

A

04-070-SE-SK-4107 OCT

1:250@A0 29.09.14

PCG94

The data on each drawing is updated at

the beginning of each month. The

drawing is valid for that month only.

Check the month in the revision box

before filling out you permit