HOUSING AUTHORITY SAFETY AUDITING SYSTEM VERSION 1.5.1

Page 2: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Content

Critical Pass Items changes Scoring Table for HASAS Version 1.5.1 General Audit Criteria 14 Elements Audit Criteria

Page 3: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Critical Pass Items Working at Height Housekeeping

Protection against Falling Objects Lifting Operations Tower Crane Mobile Crane

• Documentation such as Procedures, Arrangement

Weighting change from 3 to 6

• Implementation Aspects Weighting remained unchanged : 9

Page 4: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Scoring Table for HASAS Version 1.5.1 (Part A) Section Element No. of Questions Score % of total score

1 Safety policy 13 45 7.9 2 Safety organisation 9 33 5.8 3 Safety training 10 54 9.5

4 In-house safety rules and regulations 8 36 6.3

5 Safety committee 8 45 7.9 6 Programme for inspection of

hazardous conditions 7 30 5.3

7 Job hazard analysis 12 45 7.9 8 Personal Protection Programme 8 33 5.8 9 Accident/incident investigation 7 36 6.3

10 Emergency preparedness 8 36 6.3 11 Safety promotion 9 51 9.0 12 Health Assurance Programme 27 81 14.3

13 Evaluation, selection and control of sub-contractors 13 42 7.4

PART A Total 139 567 100%

Page 5: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Scoring Table for HASAS Version 1.5.1 (Part B) Section Element No. of

Questions Score % of total score

14 Process Control Programme 14.1 Management of Place of Work 14.1.1 Fire Risks 10 48 3.1 14.1.2 Work in Confined Spaces 10 51 3.3 14.1.3 Working at a Height 12 96 84 6.1 14.1.4 Housekeeping 8 60 48 3.8 14.1.5 Protection against Falling Objects 8 66 60 4.2 14.1.6 Overhead and Underground Services 7 30 1.9

14.1.7 Storage of inflammable Substances, Gases and Vehicle Fuels 7 30 1.9

14.1.8 Occupational Safety and Health in Offices 5 21 1.3

14.2 Management of Tasks and Operations 14.2.1 Demolition 10 42 2.7 14.2.2 Excavations 12 60 3.8 14.2.3 Lifting Operations 11 75 51 4.8 14.2.4 Roadworks 8 39 2.5 14.2.5 Temporary Works 7 27 1.7 14.2.6 Structural Steel Erection 7 33 2.1

14.2.7 Welding / Cutting Operations and Installations 11 54 3.44

14.2.8 Site Traffic 8 42 2.7 14.2.9 Works over Water or Adjacent to Water 8 30 1.9 14.2.10 Piling and Foundations 7 33 2.1 14.2.11 Glazing 5 21 1.3

Page 6: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Section Element No. of Questions Score % of total score

14.2.12 Grit Blasting 6 27 1.7 14.2.13 Asbestos 9 39 2.5 14.2.14 Machinery Guarding 6 21 1.3 14.2.15 Ground Investigation 5 15 1.0 14.2.16 Prestressing 5 15 1.0 14.3 Management of Powered Plant and Equipment 14.3.1 Compressed Air Tools 6 24 1.5 14.3.2 Electrical Supply System 12 90 72 5.7 14.3.3 Electrical Works and Portable Electric Tools 9 51 3.3 14.3.4 Hand Tools 5 21 1.3 14.3.5 Woodworking Machines 10 48 3.1 14.3.6 Abrasive Wheels 11 54 3.4 14.3.7 Hand-held Power Tools 7 30 1.9

14.4 Management of Plant and Equipment for Lifting of Material and Persons

14.4.1 Tower Crane 12 81 54 5.2 14.4.2 Mobile Crane 7 48 33 3.1 14.4.3 Gondola (Suspended Working Platform) 7 27 1.7

14.4.4 Power-operated Elevating Working Platform 6 24 1.5 14.4.5 Material Hoist 6 24 1.5 14.4.6

Power-driven lifting appliance for Carrying Person and Passenger Hoist 6 24 1.5

14.5 Management of Mechanical Plant and Equipment 14.5.1 Site Transport (loadshifting machinery) 6 21 1.3 14.5.2 Excavator 7 27 1.7

PART B Total 309 1569 1544 100%

Page 7: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Scoring Table for HASAS

HASAS Version 1.5 HASAS Version 1.5.1

No, of Questions

Part A : 139 Part B : 309

Part A : 139 Part B : 309

Score of the

system

Part A: 567 Part B: 1,455 Total: 2,022

Part A: 567 Part B: 1,569 Total: 2,136

Page 8: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

General Audit Criteria

Page 9: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

General Audit Criteria Evidence The collection of documentary evidence should be sufficient. That is, the amount of evidence should form a sufficient condition for the claim to be true. Since each audit report is part of the continual assessment process of the safety management system, duplicated submission of documentary evidence is not necessary and so not encouraged. In particular,

Documents verified in the previous audit, such as training certificates to show competence, need not be submitted again unless there is a substantial change, as when one such certificate has been renewed or there is a new and/or replacement staff member

Page 10: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

General Audit Criteria Risk assessment records Unless there is a substantial change in the work process or a related accident, generic risk assessments for non-high risk activities do not need to be reviewed every quarter. Apart from generic risk assessments, specific risk assessments are required for all high risk activities. These specific risk assessments should be reviewed according to the project progress or as arranged in the safety plan.

Page 11: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Section 1 Safety Policy

Page 12: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Policy Question 1.1.1 Weighting: 9 Does the written safety policy commit the organization to high

standards of occupational safety and health for all its employees and for other who might come into contact with its activities?

Auditor Guidance

High standards of OSH include the implementing new innovation programmes, “ Safe Working Cycle (SWC) ”, and “Work Safe Behaviour(WSB) Programme”, and “Safety Climate Index Survey (SCI)”.

Safety Climate Index Survey (SCI) is highly recommended though not compulsory

Page 13: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Policy

Question 1.1.5 Weighting: 3 Does the policy commit to provide adequate and

appropriate resources to implement the policy?

Auditor Guidance

Interview with management to verify the adequacy of financial resources will be acceptable.

Page 14: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Section 2 Safety Organization

Page 15: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Organization Question 2.1.8 Weighting: 6 Have sufficient and competent safety officer(s), safety

advisor(s) and safety representatives appointed and engaged for the site?

Auditor Guidance

A grace period of a quarter can be allowed for the training requirement of safety representatives of sub-contractors newly come to the site to attain the required safety supervisor training. This does not apply to contractor's superintendents stipulated in contract provision.

Page 16: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Organization

Question 2.1.9 Weighting: 6 Are there arrangements for keeping up to date risk

assessments, safety plans and registers of competent persons and examiners required under the relevant legislation?

Auditor Guidance

An appointment system of competent persons should be in place though individual appointment letters are not necessary.

Page 17: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Section 3 Safety Training

Page 18: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Training Question 3.1.3 Weighting: 6 Have all employees received site specific safety training?

Audit Criteria Specific job training for high risk activities include:

The operation, erection, alteration, and dismantling of plant, such as tower cranes, material hoists, builder’s lifts, gondolas, and batching plant.

Working at height, such as erection, alteration, and dismantling of bamboo scaffolds and metal scaffolds; and working on scaffolds, inside lift shafts, and on gondolas.

Electrical works, such as live electrical works. Lifting operations, such as lifting of precast units, volumetric precast bathrooms and

kitchens, the operation of mobile cranes (including lorry-mounted cranes). Use of powered machinery and equipment, such as mobile elevating working

platforms, abrasive wheels, and compressed air tools. Other high risk places of work, tasks and operations, such as work in confined

spaces, welding/cutting, piling and foundations, asbestos, use of high risk chemicals, and temporary works.

Any other training needs identified in risk assessment.

Page 19: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Training Question 3.1.5 Weighting: 6 Have all managers received safety management training?

Audit Criteria

Safety management staff should attend 27-hrs “Safety Training Course for Site Management Staff” provided by the Occupational Safety and Health Council or Construction Industry Council Training Academy covering safety legislation, elements in safety management and its concepts, safety inspection, accident investigation, risk assessment, work safe behavior, safety climate index, safe design and CDM, etc.

Page 20: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Training Question 3.1.8 Weighting 3 Have all employees first come into the site

received relevant training?

Audit Criteria

Auditor should verify the arrangement

Guidelines on The Implementation of “P” and “N” Caring Programme (Construction Industry Council, 2015)

Page 21: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Training Question 3.1.10 Weighting: 6 Are proper safety training course records maintained

such as data of training date and time, location, duration, contents, trainers, attendees and test?

Auditor Guidance

Verification of acquired training could be done by sampling and interviewing workers of three to five trades.

Page 22: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Section 6 Programme for Inspection of Hazardous Conditions

Page 23: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Programme for Inspection of Hazardous Conditions

Question 6.1.1 Weighting: 3 Has a comprehensive inspection checklist and inspection programme been

developed and stipulated in the safety plan?

Auditor Guidance

Inspection of plant, equipment, and tools could be recorded in a logbook with an itemized checklist included in the logbook to show the scope of inspection. Nonconformities should be described, otherwise “in safe working order” be stated. Each entry should be signed and dated, and the name and designation specified in the page.

The statutory Form 3A could be used for inspecting unsafe acts and unsafe conditions.

Electronic records, like messages of smartphone application, could be accepted as inspection records.

Page 24: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Programme for Inspection of Hazardous Conditions

Question 6.1.4 Weighting: 3 Are there appropriate arrangements to monitor the

effectiveness and thoroughness of the inspection?

Audit Criteria Internal safety audit can be used as one of the monitoring

tools for assessing the effectiveness and thoroughness of the inspections. If an internal audit report provided does not fulfill the requirement on competence, independence and coverage, the answer should be “No”. There is an arrangement for internal audit and yet if the first internal safety audit is not due when the first audit is conducted, the answer should be “N/A”.

Page 25: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Section 7 Job Hazard Analysis

Page 26: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Job Hazard Analysis

Question 7.1.3 Weighing: 6 Is the risk assessment and evaluation covered a systematic

examination of the likelihood and consequences to people, environment and assets and properly recorded?

Audit Criteria Auditor should comment on the content of the risk assessment

report. A sample of risk assessment reports of high risk activities (especially newly added or revised) should be submitted as evidence for verification.

A master list of all risk assessment reports should be submitted as evidence of verification.

Page 27: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Job Hazard Analysis Question 7.1.7 Weighting: 3 Is there arrangement for risk assessment to be reviewed or

updated?

Audit Criteria Unless there is a substantial change in the work process or a

related accident, generic risk assessments for non-high risk activities do not need to be reviewed every quarter. Apart from generic risk assessments, specific risk assessments are required for all high risk activities. These specific risk assessments should be reviewed according to the project progress or as arranged in the safety plan.

Page 28: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Section 8 Personal Protection Programme

Page 29: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Personal Protection Programme

Question 8.1.4 Weighting: 6 Has a sufficient stock of carefully selected and appropriate

protective clothing/equipment been ensured?

Audit Criteria

Auditor should verify the inventory management system for PPE, whether personal issue or job specific. No inventory record needs to be submitted for verification. Minimum stock level of each PPE should be arranged so as to ensure adequate supply.

Page 30: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Section 9 Accident / Incident Investigation

Page 31: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Accident / Incident Investigation

Question 9.1.7 Weighting: 6 Is there an arrangement for common causes and trends in

accident/ incident data analysed as an aid to accident prevention?

Audit Criteria Maintaining accident statistics and performing trend analysis

serve the purposes of identifying trends and developing action plan to prevent recurrences. The arrangement should include: The establishment of classifications of accident to group

similar data for analysis. The application of statistical tools such as Housing Authority

Occupational Injury & Disease Surveillance System (HAOIDSS)

Page 32: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Section 10 Emergency Preparedness

Page 33: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Emergency Preparedness

Question 10.1.7 Weighting: 3 Is there a programme of drills and exercise for all emergency

situations?

Audit Criteria Auditor should comment on the adequacy of the programme to

cover all the following emergency situations: An accident which results in death or serious injury; A fire breaking out which requires rescue crews from Fire Services

Department to effect control; A flood that causes or threatens life on site; A leakage of dangerous goods or chemicals; and Any other accident/incident which creates a dangerous situation.

Page 34: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Section 11 Safety Promotion

Page 35: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Promotion Question 11.1.6 Weighting: 6 Is Work Safe Behaviour (WSB) Programme used to promote a proactive

safety culture throughout the life of the project?

Audit Criteria Appoint competent WSB observers who have completed the 12-hour

Work Safe Behaviour Workshop organized by the OSHC or trained up by staff who have completed the Train-the-Trainer course for WSB and SCI (WSBCIST) offered by OSHC or equivalent to observe worker’s behaviour. The senior management officer and Competent Observer(s) shall not be the Safety Manager or Safety Officer.

WSB should cover at least one high risk site activity (of not more than 15 observation items on each observation checklist) at any one time. By the end of the construction project, all critical high risk site activities should have been covered.

Page 36: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Promotion

Question 11.1.7 Weighting: 6 Is Work Safe Behaviour (WSB) Programme used on critical

high risk site activities?

Audit Criteria

WSB should cover at least one high risk site activity (of not more than 15 observation items on each observation checklist) at any one time. By the end of the construction project, all critical high risk site activities should have been covered.

Page 37: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Promotion

Question 11.1.8 Weighting: 6 Is Safety Climate Index Survey (SCI) used to promote a

proactive safety culture of the project?

Audit Criteria

N/A when the audit criteria cannot be satisfied since SCI is not compulsory in HASAS v1.5.1.

Page 38: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Promotion Question 11.1.9 Weighting: 6 Is a new safety innovation programme use to promote a

proactive safety culture of the project?

Audit Criteria The safety innovation should be either innovative measures

(contractor’s proposed innovative and functional safety control installation or measure, but not related to BIM/RFID), application of building information modeling (BIM), or radio frequency identification (RFID) for safety.

The safety innovation should demonstrate the creativity and uniqueness of the measure and how it contribute to avoid, minimize and/or mitigate major serious accidents, such as falling from height, electrocution, etc. The innovation should make effective and efficient use of resources, eg, cost-effectiveness.

Page 39: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Section 12 Health Assurance Programme

Page 40: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Health Assurance Programme

Question 12.1.8 Weighting: 3 Have a system such as pre-employment and medical

examination programme been established for monitoring the exposure of workers to substances which are hazardous to health?

Audit Criteria Pre-employment examination and medical examination would

be confined to those trades that are required to have examinations under the law such as those working with carcinogenic substances, with asbestos, in compressed air, or underground.

Page 41: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Health Assurance Programme

Question 12.2.3 Weighting: 3 Have competent persons appointed to assist in carrying out the

risk assessment with respect to manual handling operations? Audit Criteria Auditor should verify the competency of the person (possession

of RSO or certificate of competence in manual handling or equivalent and appointed by contractor or employer that he had the ability to do the job properly). Competency includes proper training and experience.

Auditor should verify the quality of the MHO risk assessment reports.

Page 42: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Health Assurance Programme Question 12.3.1 Weighting: 3 Have noise assessment been carried out to determine which

machines, combinations of machines or work processes including ambient noise, are liable to expose workers to noise levels of 85 dBA or more?

Auditor Criteria

The noise assessment is done by a competent person (possession of RSO or certificate of competence in workplace noise assessment or equivalent and appointed by contractor or employer that he had the ability to do the job properly)

Auditor should verify the quality of the noise assessment reports.

Page 43: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Health Assurance Programme

Question 12.3.2 Weighting: 3 Where noise levels may lead to the risk of deafness, is there a system to

reduce the emission or exposure to noise by planning work, changing machinery or appropriate steps to reduce the need for people to work in high noise levels?

Auditor Criteria The hierarchy of control measures are:

Elimination of hazards

Substitution by alternative tools or machines – eg the use or replacement with Quality Powered Mechanical Equipment (QPME)

Engineering control measures – eg, enclosure, isolation

Administrative measures – eg, regular repair and maintenance, job rotation and appropriate rest breaks

Personal protective equipment

Page 44: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Health Assurance Programme

Question 12.3.3 Weighting: 3 Where noise levels may lead to the risk of deafness, or where noise

may create a nuisance, are approved hearing protection selected and issued to employees?

Auditor Criteria

Auditor should verify the suitability of the approved type ear protectors.

Page 45: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

PART B Section 13 Evaluation, Selection and Control of Sub-contractor

Page 46: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Evaluation, Selection and Control of Sub-contractor

Question 13.2.7 Weighting: 3 Is there an arrangement to ensure that the tools, plant, equipment,

materials and substances by subcontractors and suppliers comply with relevant statutory requirements?

Audit Criteria There should be written document submitted from sub-contractors

regarding what they will bring into site and there should be a system for checking and monitoring that they are complied with the requirements. Otherwise, the answer should be “No”.

The tools, plant, equipment, materials and substances should be those stipulated under law and contract. Dangerous goods, eg oxy-acetylene cylinders, Lifting appliances Cartridge-operated fixing tools, Chemicals, eg dangerous substances, Air receivers, Portable electric tools

Other than those required under the law and contract, written document submission for checking is not necessary and daily monitoring is acceptable.

Page 47: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

PART B Section 14 Process Control Programme

Page 48: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Updated the name of Sub-section 14.4.6 Power-driven Lifting Appliance for Carrying

Person, Builder’s Lift and Tower Working Platform

Page 49: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Fire Risks Question 14.1.1.6 Weighting: 3 Have sufficient numbers of employees been trained in fire fighting

techniques and in the use of the fire extinguishers provided?

Audit Criteria

Auditor should verify the training record of fire fighting.

Registered safety officers and representatives from registered fire service installation contractors are acceptable trainers capable to conduct training in the use of fire extinguishers.

Page 50: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Work in Confined Spaces Question 14.1.2.10 Weighting: 6 Where relevant, have the effectiveness of management of

confined space been regularly monitored?

Audit Criteria

Conduct field inspection and work safe behaviour observation to assess the workers safe working practices while working in confined space. For confined space works which are short, the baseline observation period could be shortened to a couple of days, instead of the regular four weeks.

Page 51: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Work at a Height Question 14.1.3.11 Weighting: 9 Are all other places included edges, working platforms,

mobile tower scaffolding, gangways, etc. provided with proper guard-rails and toe-boards?

Audit Criteria

Exclude those covered in Question 14.1.3.9 (floor edges and stairways)

Temporarily removed or unerected guard-rails, toe-boards and barriers shall be replaced or erected as soon as practicable after the expiration of the time when removal of them are necessary for the access of persons or the movement of materials or other purposes of the work concerned

Page 52: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Work at a Height Question 14.1.3.12 Weighting: 9 Are there arrangements to ensure all ladders or other means of

support such as frame trestle made of suitable and sound materials of sufficient strength and capacity for the purpose for which it is to be used?

Audit Criteria Ladders are work equipment that neither

prevents nor arrests falls. In general, ladders are only used to gain access to areas above or below the working level, however, it is important to appreciate the safe limits of their use – especially for portable ladders.

Step ladders and straight ladders are reserved purely as a means of access and egress to working platforms.

For work involving a possible fall of less than 2 metres, working platforms or step platforms with guard‐rails

For work with a possible fall of not more than 900mm, step platform and platform ladder

Page 53: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Lifting Operations Question 14.2.3.2 Weighting: 3→6 Have risk assessments to identify any foreseeable hazards, assess

their risks, and recommend action to eliminate or control risks of lifting operations?

Audit Criteria Specific risk assessments should be carried out for all high-risk lifting

operations involve the following lifting appliances: Tower crane; Lorry-mounted crane; Crawler crane; Mobile crane; and Others such as winch, derrick crane, mono-rail.

Page 54: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Temporary Works

Question 14.2.5.5 Weighting: 3 Where relevant, has a permit to load certificate been

prepared for a fully design temporary works before loading?

Audit Criteria

Once complete, all falsework should be inspected and certified as ready for use (a written permit-to-load procedure, e.g. DEI-F26 – Examination of Work before Covering Up, is strongly recommended).

Page 55: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Electrical Supply System Question 14.3.2.2 Weighting: 3→6

Have the electrical supply system and all subsequent alterations or extensions thereto been carried out and certified by a registered electrical contractor/worker using prescribed Work Completion Certificates (WR1)?

Audit Criteria

Temporary installation providing supplies during the execution of construction or demolition works, or for repair and testing purposes should comply with the requirement of the Wiring Regulations.

The Registered Electrical Worker/ Registered Electrical Contractor to complete a Work Completion Certificate (Form WR1) after satisfactory inspection and testing of the electrical installation as required by the Code of Practice for the Electricity (Wiring) Regulations.

Page 56: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Electrical Supply System Question 14.3.2.2 Weighting: 9

Where generators is installed, is it appropriately earthed and are exhaust fumes discharged in a direction not to cause harm or nuisance?

Audit Criteria

The generator is properly earthed. The overall diameter of copper rod electrode should not be less than 12.5 mm. The overall diameter of a rod electrode of materials such as stainless steel and galvanised steel should not be less than 16 mm. All rod elecvtrodes thus installed should be connected together by means of earthing conductors of adequate size enclosed in PVC ducts and laid at a minimum depth of 600 mm below the ground surface.

The impedance of the earthing electrode and connection is periodically checked by a Registered Electrical Worker. Code 11 EARTH LEAKAGE AND EARTH FAULT CURRENTS of COP refers.

Page 57: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Maintenance Logbook Question 14.4.4.5 Weighting: 3 Has an inspection and maintenance system for powered-

operated elevating working platform been established and used?

Question 14.4.5.5 Weighting: 3 Has an inspection and maintenance system for material

hoist been established and used?

Audit Criteria : The maintenance logbooks or records (for the period of use on site) should be readily available for reference and examination.

Page 58: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Maintenance Logbook Question 14.5.2.6 Weighting: 3 Has an inspection and maintenance system for excavator been established and used?

Audit Criteria :

- Proper records of routine inspection, servicing, lubrication, renewal of parts and repair of every excavator should be maintained. The maintenance logbooks or records should be readily available for reference and examination by relevant personnel.

Page 59: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Prior-to-work (Before Use) and After Use Inspection Record (1)

•Apart from using a safety checklist, a logbook could be kept for each piece of high risk plant and equipment to cover the items of operation, before use and after use. The logbook should contain a list of checking items. Nonconformities should be described, otherwise “in safe working order” be stated in the inspection before use. Report by exception is acceptable for inspection after use. Each entry should be signed and dated, and the name and designation specified in the page. This is applicable to the followings: Tower Crane Mobile Crane Gondola Elevating Working Platform Material Hoist Power-driven lifting appliance for Carrying Person, Builder’s Lift and Tower Working Platform Excavator

Page 60: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Inspection Checklist for monitoring daily operations (1)

Tower Crane - Q14.4.1.12 Mobile Crane– Q14.4.2.7 Gondola– Q14.4.3.7 Elevating Working Platform -

Q14.4.1.12 For Example : Q14.4.1.12 Have safety rules and safety checklists been

developed and used for monitoring the safe operation of tower crane? (Weighting : 6) - Safety checklist should cover checking items prior to

commencement of work and whilst work is in progress. A logbook should be kept for each tower crane to cover the items of operation, before use, and after use. The logbook should contain a list of checking items.

- SOSS Form 3A could be used as a record of field inspection when tower crane is in operation. However, a list of checking items should be prepared and be readily available during inspection.

Materials Hoist– Q14.4.5.6

Passenger Hoist – Q14.4.6.6

Excavator– Q14.5.2.7

Page 61: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Mobile Crane Pre-use Checklist Example

Page 62: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Prior-to-work (Before Use) and After Use Inspection Record (2)

Apart from using a safety checklist, a logbook could be kept for the whole set of high risk equipment to cover the items of operation, before use and after use. The logbook should contain a list of checking items. Report by exception is acceptable, i.e. nonconformities should be described, otherwise “in safe working order” is assumed. Each entry should be signed and dated, and the name and designation specified in the page. This is applicable to the followings:

Compressed Air Tools

Woodworking Machines

Abrasive Wheels Hand-held Power Tools

Page 63: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Safety Inspection Checklist for monitoring daily operations (2)

Compressed Air Tools – Q14.3.1.3

Woodworking M/Cs - Q14.3.5.10

For Example : Q14.3.5.10 Have safety checklists developed and used for monitoring the safe operation of woodworking machinery including hand held circular saw and chain saw? (Weighting : 3) - A logbook covering all woodworking machinery should be kept by

the sub-contractor-in-charge to cover the items of operation, before use, and after use. The logbook should contain a list of checking items and an updated list of woodworking machinery. Report by exception is acceptable.

- SOSS Form 3A could be used as a record of field inspection when such woodworking machinery is in use. However, a list of checking items should be prepared and be readily available during inspection.

Abrasive Wheels – Q14.3.6.11

Hand-held Power Tools – Q14.3.7.6

Page 64: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Daily Safe Working Cycle Inspection Record

SOSS Form 3A could be used as a record of field inspection of Part B items – place of work; tasks and operations; powered plant and equipment; plant and equipment for lifting material and persons; and mechanical plant and equipment. However, a list of checking items should be prepared for each Form 3A inspection item and be readily available during inspection. For example, a list of several checking items for “gondola” are prepared and this list is either printed out or accessed via a smart phone, tablet computer, or similar electronic device by the person who conducts the inspection.

Page 65: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Daily Safety Inspection Checklist for monitoring daily operations (3)

Fire Risks - Q14.1.1.10 Confined Spaces – Q14.1.2.10 Housekeeping – Q14.1.4.6 Prevention against Falling Objects –

Q14.1.5.4 Storage of Inflammable Substances,

Gases and Vehicle Fuels – Q14.1.7.7 OSH in Office – Q14.1.8.5 Temporary Works – Q14.2.5.7 Piling and Foundations – Q14.2.10.7 Ground Investigation - Q14.2.15.5 Compressed Air Tools – Q14.3.1.3

For Example : Q14.1.1.10 Have the effectiveness of management of fire risks been regularly monitored by field inspection? (Weighting : 6) - SOSS Form 3A could be used as a record of field inspection. However, a list of checking items should be prepared and be readily available during inspection.

Page 66: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Site Traffic Question 14.2.8.3 Weighting: 6

Is there arrangement to control traffic flow in the site? Audit Criteria

Gate at Vehicular Ingress/Egress for Traffic Control (DCMBI P03/15)

Provide mechanically operated horizontal gates at vehicular ingress/egress points of the hoardings and covered walkways fronting public footpaths, including gantries to control vehicular and pedestrian flow across the footpath

Post security guards at the vehicular ingress/egress points

Install the horizontal gate system with the warning/safety devices Flashing amber lights and audible alarms activated automatically when

the horizontal gate is in operation

The warning devices shall be visible and audible to the pedestrian

The movement of the gate shall be controlled by continuous pressure type push buttons or switches

At least one emergency stop push button

Page 67: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

The End

Page 68: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

HOUSING AUTHORITY SAFETY AUDITING SYSTEM NSC Checklist

Page 69: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Content

Scoring Table for NSC Checklist Major Changes of Audit Criteria

Page 70: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Scoring Table for NSC Checklist

Section Element No. of Questions Score 1 Working At Height 3 9 2 Protection Against Falling Objects 2 6 3 Housekeeping 3 9 4 Lifting Operations 2 6

5 Welding/Cutting Operations and Equipment 4 12

6 Abrasive Wheels 2 6 7 Portable Tools 2 6 8 Electrical Works 4 12 9 Compressed Air Tools 3 9

10 Dangerous Substances 2 6

11 Manual Handling and Mechanical Materials Handling 3 9

12 Noise 4 12 13 Work in Confined Spaces 4 12 14 Miscellaneous 3 9

PART A Total 41 123

Page 71: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Part 1 Working At Height

Page 72: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Working At Height Question 1.1 Weighting : 3

Has every worker worked in a safe place of work such

as proper working platforms with a safe means of access (and egress) or if not practicable, the use of the fall-arresting system etc. for all activities?

Audit Criteria Ladders should be complied with EN 131 or the

standards with the same specification.

Page 73: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Working At Height Question 1.2 Weighting : 3 Are inspections of scaffolds/ working platforms carried

out by competent person at regular intervals and results entered in the prescribed forms?

Audit Criteria If NSC was found using or having intention to use the

unsafe scaffolds/working platforms/ladders provided by the main contractor, the answer should be “No”. The answer could be “N/A” if NSC had checked the unsafe condition of the scaffold/ working platform/ ladder provided by main contractor and demonstrated no intention to use such non-conforming equipment.

Page 74: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Working At Height Question 1.3 Weighting : 3 Are all platforms installed with suitable guard-rails and toe-

boards?

Audit Criteria If NSC was found using or having intention to use the unsafe

working platforms provided by the main contractor, the answer should be “No”. The answer could be “N/A” if NSC had checked the unsafe condition of the working platform provided by main contractor and demonstrated no intention to use such un-conforming equipment.

Page 75: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Part 2 Protection Against Falling Objects

Page 76: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Protection Against Falling Objects Question 2.1 Weighting : 3 Are all working platforms and floor edges installed with

toe-boards to prevent materials from falling from height?

Audit Criteria The height of a toe-board or other similar barrier shall

be not less than 200 millimetres and securely fixed.

Temporarily removed or unerected guard-rails, toe-boards and barriers shall be replaced or erected as soon as practicable after the expiration of the time when removal of them are necessary for the access of persons or the movement of materials or other purposes of the work concerned.

Page 77: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Protection Against Falling Objects Question 2.2 Weighting : 3 Are there arrangements to prevent materials, hand tools etc.

from falling from height?

Audit Criteria Tool belts, straps or bags should be considered. Auditor should only comment on the application of protection

measures for working at height only. The stacking/storage area must be well organize with

appropriate stacking/storage systems to ensure the material is securely stacked in a place ;

Secure loose or light material stored on roofs and open floors to keep it from blowing away in the wind.

Page 78: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Part 3 Housekeeping

Page 79: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Housekeeping

Question 3.1 Weighting : 3 Is there no timber or other material with projecting nails

or other sharp objects are used or left on the site?

Audit Criteria Work areas should be kept as clear as possible of

unnecessary materials and waste.

Projecting or sharp objects must be adequately protected.

Page 80: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Housekeeping

Question 3.2 Weighting : 3

Are materials and equipment stored and stacked safely; waste properly disposed?

Audit Criteria Workplaces should be kept as clear as possible of

unnecessary materials and waste and kept clear of obstructions.

Page 81: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Housekeeping Question 3.3 Weighting : 3 Where work is being taken, are suitable and adequate

lighting provided to all places where lighting is necessary to secure workers' safety?

Audit Criteria Suitable and adequate lighting necessary to secure

workmen's safety shall be provided.

Page 82: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Part 4 Lifting Operations

Page 83: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Lifting Operations Question 4.1 Weighting : 3 Are all lifting appliances and associated lifting gears

inspected, tested and examined; and suitable for the operations to be carried out?

Audit Criteria For mandatory requirement, all prescribed forms should be

properly filled in name and designation otherwise the answer should be “No”.

Page 84: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Part 5 Welding/Cutting Operations and Equipment

Page 85: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Welding/Cutting Operations and Equipment Question 5.1 Weighting : 3 Are welding/cutting equipment including hose, cables,

gauges in good conditions and provided with appropriate flash back arresters?

Audit Criteria

Safety devices to prevent fire and explosion, including flash back arrester, non-return valve, pressure relief device, vent and purge device.

Page 86: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Welding/Cutting Operations and Equipment

Question 5.2 Weighting : 3 Have purpose-built trollies/carriers been used for moving

cylinders?

Audit Criteria Moving cylinders in suitable trolleys which they are secured

upright.

Page 87: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Welding/Cutting Operations and Equipment Question 5.3 Weighting : 3 For electric arc welding, are adequate welding earths and returns ensured

and properly connected to the workpiece?

Audit Criteria Construction and condition of electric arc welding sets should be

considered, such as: - The workpiece should be well earthed, and all equipment should be

earthed and insulated. - Welding machines having a maximum current output exceeding 30A single

phase or half the maximum demand of an installation in any one phase is directly connected to the mains on a 3-phase supply.

- Turn off the welding machine when left unattended. - Use welding machine for enclosed type, and ensure that terminals of the

welding machine are properly protected to avoid accidental contact. - The welding machine should be equipped with a voltage reducing device

to automatically reduce the output voltage at no-load condition.

Page 88: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Part 6 Abrasive Wheels

Page 89: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Abrasive Wheels

Question 6.2 Weighting : 3 Have all grinding machines for the work marked with the maximum

working speed and all abrasive wheels or discs properly selected?

Audit Criteria The maximum speed of the spindle should be marked on every

grinding/cutting machine so that it is easy to compare the speed marked on the wheel with the speed of the machine spindle. Where the spindle can be operated at more than one specific speed, each speed must be shown, and if the speed is infinitely variable within a specified range, the notice must show the maximum and minimum speed.

The maximum permissible speed in revolutions per minute (rpm) and metres per second (m/s) specified by manufacturers should be marked on every abrasive wheel larger than 80 mm in diameter, or on the blotter or identification label which is sometimes attached to it. Since it is not practicable to mark smaller wheels, the maximum permissible speed in rpm of wheels 80 mm in diameter or less should be stated in a notice posted in a position where it can easily be read.

Page 90: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Part 8 Electrical Works

Page 91: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Electrical Works

Question 8.2 Weighting : 3 For electrical equipment and installations installed by

NSC and used in humid environment or exposed to weather, is it weatherproof type or contained in an appropriate weatherproof enclosure?

Audit Criteria Temporary switch boxes, socket outlets, plugs and

cable couplers are of splash-proof type with a protection class of IP54 or above.

Page 92: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Electrical Works

Question 8.3 Weighting : 3 Are portable tools and equipment connected to the electrical

supply system with approved type of connectors, and provided with appropriate protection against earth leakage and suitably located at means of cutting off the electricity supply when necessary?

Audit Criteria All electrical connections must be proper plugs and sockets.

Makeshift connections and taped joints are not permitted.

Page 93: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Part 11 Manual Handling and Mechanical Materials Handling

Page 94: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Manual Handling and Mechanical Materials Handling

Question 11.3 Weighting : 3 Are the manual operations carried out correctly?

Audit Criteria Auditor should verify NSC employees are following safe

work practices.

Page 95: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Part 12 Noise

Page 96: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Noise

Question 12.1 Weighting : 3 Has noise assessment been carried out to determine which machines,

combinations of machines or work processes including ambient noise, are liable to expose workers to noise levels of 85 dBA or more?

Audit Criteria

The question may be “N/A” if no noisy operations or activities are observed on site. If noisy machinery such as abrasive cutting machinery, circular cutting machinery, metal grinding machinery, rock breaking machinery or wood working machinery etc., is used on site, noise assessment is usually required.

According to “Guidance Notes on Factories and Industrial Undertakings (Noise at Work) Regulation”, as a rough guide, the first action level might be reached and an assessment of LEP,d will usually be needed wherever people have to shout to be heard or have difficulty being heard clearly by someone about 2 metres away, or they find it difficult to talk to each other.

Page 97: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Noise Question 12.2 Weighting : 3

Where noise levels may lead to the risk of deafness, is

there a system to reduce the emission or exposure to noise by planning work, changing machinery or appropriate steps to reduce the need for people to work in high noise levels?

Audit Criteria If no noisy operations/machines are observed or the

measured value of Daily Personal Noise Exposure was less than 85 dB(A) in the assessment, “N/A” should be given.

Page 98: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Noise Question 12.3 Weighting : 3 Where noise levels may lead to the risk of deafness, or

where noise may create a nuisance, are approved hearing protection selected and issued to employees?

Audit Criteria If no noisy operations/machines are observed or the

measured value of Daily Personal Noise Exposure was less than 85 dB(A) in the assessment, “N/A” should be given.

Page 99: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Noise Question 12.4 Weighting : 3 Are the noisy operations/machines identified and

marking out high noise level zones?

Audit Criteria If no noisy operations/machines are observed or the

measured value of Daily Personal Noise Exposure was less than 85 dB(A) in the assessment, “N/A” should be given.

Page 100: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Part 13 Work in Confined Spaces

Page 101: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

Work in Confined Spaces

Question 13.1 Weighting : 3

Has risk assessment been conducted by a competent person before confined space work commenced (E.g. cellars and water tanks etc.)?

Audit Criteria The risk assessment report should be properly filled in

and with sufficient coverage and conducted by competent person.

Page 102: HOUSING AUTHORITY SAFETY AUDITING SYSTEM ......14.2.6 Structural Steel Erection 7 33 2.1 14.2.7 Welding / Cutting Operations and Installations 11 54 3.44 14.2.8 ... Council Training

The End