REEDEREI "NORD" KLAUS E. OLDENDORFF FLEET INSTRUCTION MANUAL HOT WORK CHECKLIST (TANKERS) This form is to be completed on every occasion when hotwork is to be carried out on the vessel. Vessel is to comply with the hotwork guidelines in ISGOTT. Vessel: _________________________________ Position: _________________________________ Hotwork Space: _____________________________________________ Date: _________________ Crew members involved: ____________________________________________________________ Reason for Hotwork : _______________________________________________________________ Permission to perform hotwork obtained from Ch.Eng./Tanker Dept._______________ hours (GMT) O2 content of space: _____________ LEL % : _____________ H2S test reading : _____________ Complete following checks: Area must be free of flammable materials and flammable gas Have adjacent spaces and tanks been checked for combustibles and leakage? Are vapour and liquid lines to area blanked and sealed? Ensure space is adequately illuminated. Has work area been cleaned of sludge, wax and oil (cleaned out to at least 10m from the hotwork location)? Is work area at least 0.5m from bulkheads of bunker tanks containing bunkers? Are gas and liquid lines to area blanked? Have heating coils been blown? Have valves been secured shut, lashed and tagged? Are tanks fully inerted or gas-free? (if applicable) Issued 01/06/01 Page 1 of 1

Hotwork Checklist (Tanker)

Embed Size (px)

DESCRIPTION

hotwork

Citation preview

Page 1: Hotwork Checklist (Tanker)

REEDEREI "NORD" KLAUS E. OLDENDORFF

FLEET INSTRUCTION MANUAL

HOT WORK CHECKLIST (TANKERS)

This form is to be completed on every occasion when hotwork is to be carried out on the vessel. Vessel is to comply with the hotwork guidelines in ISGOTT.

Vessel: _________________________________ Position: _________________________________

Hotwork Space: _____________________________________________ Date: _________________

Crew members involved: ____________________________________________________________

Reason for Hotwork : _______________________________________________________________

Permission to perform hotwork obtained from Ch.Eng./Tanker Dept._______________ hours (GMT)

O2 content of space: _____________

LEL % : _____________

H2S test reading : _____________

Complete following checks:

Area must be free of flammable materials and flammable gas

Have adjacent spaces and tanks been checked for combustibles and leakage? Are vapour and

liquid lines to area blanked and sealed?

Ensure space is adequately illuminated.

Has work area been cleaned of sludge, wax and oil (cleaned out to at least 10m from the

hotwork location)?

Is work area at least 0.5m from bulkheads of bunker tanks containing bunkers?

Are gas and liquid lines to area blanked?

Have heating coils been blown?

Have valves been secured shut, lashed and tagged?

Are tanks fully inerted or gas-free? (if applicable)

Have all tank emissions been stopped? (if applicable)

Have all cargo operations ceased? (if applicable)

Has the work piece been moved to poop? (if applicable)

Person(s) that carry out work should be suitably attired and be using the correct safety

equipment.

Inform bridge and engine room at start of operation.

Maintain fire watch. Are fire appliances ready?

Know how to raise alarm if emergency occurs.

When work is complete, inform bridge and engine room.

I am satisfied that the appropriate safety procedures are in place and the Tanker Department have been informed.

Signed _____________________ OIC __________________ Master _____________________

Name ______________________ _______________________ (Block letters)

Issued 01/06/01 Page 1 of 1