6
BACK OF THE HOUSE SPACE REQUIREMENTS: 1. LOADING DOCK 2. EMPLOYEE’S ENTRY 3. TIME KEEPER 4. GARBAGE 5. LOCKER ROOM W/ STAFF AREA 6. UNIFORM ROOM 7. FOOD STORAGE AND PREPARATION (HOT AND COLD) 8. EMPLOYEE’S CAFETERIA 9. TOILET FACILITIES FOR EMPLOYEES

Hotel Final Space Req

Embed Size (px)

DESCRIPTION

ards

Citation preview

Page 1: Hotel Final Space Req

BACK OF THE HOUSE SPACE REQUIREMENTS:

1. LOADING DOCK2. EMPLOYEE’S ENTRY3. TIME KEEPER4. GARBAGE5. LOCKER ROOM W/ STAFF AREA6. UNIFORM ROOM7. FOOD STORAGE AND PREPARATION (HOT AND COLD)8. EMPLOYEE’S CAFETERIA9. TOILET FACILITIES FOR EMPLOYEES10. DISHWASHING11. MAIN KITCHEN12. BAKESHOP

Page 2: Hotel Final Space Req

13. ROOM SERVICE14. WAITER’S AREA15. SERVICE ELEVATOR16. TRASH CHUTE / REFUSE ROOM17. LAUNDRY18. HOUSEKEEPING / STORAGE19. MECHANICAL ROOM20. ELECTRICAL ROOM21. MAINTENANCE ROOM22. ADMINISTRATIVE FACIITY

-accounting ofc, management ofcAssistang manager ofc, head food dept,Beverage dept.,

23. MAIL ROOM24. SECURITY ROOM

FRONT OF THE HOUSE SPACE REQUIREMENTS:

A. LOBBY B. FRONT DESKC. DINING SPACED. PASSNEGER LIFTE. PUBLIC TOILET

ROOM TYPES:

- TWIN BEDROOM- STUDIO ROOM- SUITE

EACH ROOM: BATHROOM:

BED CLOSET WC TUB

SIDE TABLE LUGGAGE STAND LAVATORY MEDICINE CABINET

COCKTAIL TABLE CHAIR SHOWER

Page 3: Hotel Final Space Req
Page 4: Hotel Final Space Req
Page 5: Hotel Final Space Req
Page 6: Hotel Final Space Req