Hot Work PermitsWhy do we need hot work permits?

Every year fires occur that could havebeen prevented had employees used appropriatefire prevention measures.

The National Park Service requires the use of the Hot Work Permit Process as the primary means of preventing fires due to non-routine open flame and high temperature processes. (NFPA standard 51B)

Page 3: Hot Work Permitting

3

Hot Work PermitsGoals and Objectives:

At the end of this session you will able to:

- Recognize work that requires the use of Hot Work permits.

- Be familiar with the Hot Work Permit System.

Page 4: Hot Work Permitting

4

Hot Work PermitsHot Work is any work using open flames or sources of heat that could ignite materials in the work area.

Page 5: Hot Work Permitting

5

Hot Work PermitsExamples of hot work are:

welding burning brazing propane soldering oxyacetylene cutting grinding ferrous metals

Page 6: Hot Work Permitting

6

Responsible Person:A person in the park or work unit with the proper training will be designated as the person responsible for issuing the Hot Work permits, at most sites this is the person designated as the Park Structural Fire Coordinator (PSFC)

Hot Work Permits

Page 7: Hot Work Permitting

7

Hot Work PermitsProcedures:

Before beginning anyhot work project, contact thePark Structural Fire Coordinator (PSFC)to have a Hot Work site inspected and a permit issued.

Page 8: Hot Work Permitting

8

Hot Work PermitsCutting / WeldingPermit

Location: Job No.

Date: Job No.

Location & Building: Floor

Nature of Job:

Welder’s Name:

The above location has been examined. The precautions checkedon the reverse of this card have been taken to prevent fire.Permission is granted for this work.

Permit Date: Time:Expires AM

PM

Permits are issued for thespecific job being done, andfor a specific time period.

The time period is usually for the working shift, but should never exceed 24 hours.

Page 9: Hot Work Permitting

9

Hot Work PermitsRequired checks:

Sprinklers are in service. Cutting and welding equipment in good repair.

Precautions within 35 ft. (10 m.) of work. Floors swept clean of combustibles. Combustible floors wet down, covered with damp sand or fire-resistive sheets. Flammable liquids removed; other combustibles, if not removed protected with fire-resistive tarpaulins or metal shields. Explosive atmosphere in area eliminated. All wall and floor openings covered. Fire-resistive tarpaulins suspended beneath work.

Work on Walls or Ceilings Construction is noncombustible and without combustible covering or isolation. Combustibles moved away from other side of wall.

Work on Enclosed Equipment Enclosed equipment cleaned of all combustibles. Containers purged of flammable liquids.

Fire Watch Fire watch will be provided during and for at least 30 minutes after work, and during any coffee or lunch breaks. Fire watch is supplied with suitable extinguishers, or charged small hose. Fire watch is trained in use of this equipment and in sounding alarm.

The PSFC has the responsibility of verifying that all necessary precautions have been taken at the worksite.

Page 10: Hot Work Permitting

10

Hot Work PermitsRequired Precautions:

Sprinklers are in service if they are in the structure.

Welding and other Hot Work have been found to be highranking causes of fires. Sprinkler systems mustremain in service in the hot work area, unless specificallyapproved by the PSFC.

Page 11: Hot Work Permitting

11

Hot Work Permits

Required Precautions:

Cutting and welding equipment in good repair.

Gas hoses, backflow preventers, fire resistive tarpaulins and curtains are on site, the appropriate size and type of portable fire extinguisher are available and other cutting and welding equipment must be in good repair before the permit is issued.

Page 12: Hot Work Permitting

12

Hot Work PermitsRequired Precautions: Precautions within 35 ft. (10 m.) of work. Floors swept clean of combustibles. Combustible floors wet down, covered with damp sand or fire-resistive sheets. Flammable liquids removed; other combustibles, if not removed protected with fire-resistive tarpaulins or metal shields. Explosive atmosphere in area eliminated. All wall and floor openings covered. Fire-resistive tarpaulins suspended beneath work.

Work on Walls or Ceilings Construction is noncombustible and without combustible covering or isolation. Combustibles moved away from other side of wall.

Work on Enclosed Equipment Enclosed equipment cleaned of all combustibles. Containers purged of flammable liquids.

Anything that can burn must be removed from the immediate work area.

Page 13: Hot Work Permitting

13

Hot Work PermitsRequired Precautions:

Fire Watch Fire watch will be provided during and for at least

30 minutes after work, and during any coffee or lunch breaks. Fire watch is supplied with suitable extinguishers, or

charged small hose. Fire watch is trained in use of this equipment and in sounding alarm.

Should other precautions fail, trained personnel will be needed with fire fighting equipment to extinguish any fires which start. Personnel and equipment must be readily available before the permit is issued.

Page 14: Hot Work Permitting

14

Hot Work Permits

Required Precautions:

Fire Watch Fire watch will be provided during and for at least 30 minutes after work, and during any coffee or lunch breaks. Fire watch is supplied with suitable extinguishers, or charged small hose. Fire watch is trained in use of this equipment and in sounding alarm.

Fire Watch personnel maynot do other jobs whichdetract from their primaryresponsibility.

Fire Watch personnel must be trained to use fire extinguishmentmedia provided.

Fire Watch personnel must be aware of how to report emergencies,and in emergency evacuation procedures.

Fire Watch personnel must be identified and their qualifications verified,before permits are issued.

Page 15: Hot Work Permitting

15

Hot Work PermitsRequired Precautions:

CAN THE JOB BE AVOIDED?

IS THERE A SAFER WAY?

Before beginning any hot work, ask yourself if the work can bedone a safer way. Hot work is very hazardous and should beavoided if not absolutely necessary.

Page 16: Hot Work Permitting

16

Hot Work PermitsFinal Checkup By Welder

Work area and all adjacent areas to which sparks and heat might havespread (such as floors above and below and on opposite side of walls) were inspected after the work was completed and were found fire safe.

Before leaving the area for the day, at least 60 minutes after the last hot work has been completed, verify that no smoldering fires have developed within walls, cracks in floors, or in ceiling areas where you have been working.

Page 17: Hot Work Permitting

17

Hot Work Permits - Summary Jobs like electric arc welding, brazing, gas soldering, and

oxygen-acetylene cutting and welding should have hot work permits issued by the Park Structural Fire Coordinator (PSFC)before work begins.

Permits are issued for a specific job, for aspecific time frame, to a specific person.

All necessary equipment must be on site and ingood working order before work begins.

A fire watch must be present for the duration of hot work and for at least 60 minutes after work is done.

A fire inspection must be conducted by the person doing the hot workbefore leaving the job site.

Permits are to be returned to the person who issued them.

Page 18: Hot Work Permitting

18

NFPA 909Standard for the Protection of Cultural Resources

Including Museums, Libraries, Places of Worship, and Historic Properties

3-6 Hot Work.Hot work shall not be permitted unless there is no other viable

alternative.

3-6.1 Hot Work Permit.A hot work permit shall be issued by the PSFC to authorize work with

any open flame devices used in soldering, brazing, cutting, and welding.

Page 19: Hot Work Permitting

19

NFPA 909Standard for the Protection of Cultural Resources

Including Museums, Libraries, Places of Worship, and Historic Properties

3-6.2 Permit Requirements.

The hot work permit shall prescribe measures to protect the collections and ensure life safety, and shall include the following requirements as a minimum:

(a) A person trained in the use of fire extinguishers shall be stationed in the vicinity of the hot work operation for the duration of the work and for 60 minutes

thereafter with frequent monitoring during the following 3 hours

(b) All combustibles within 35 ft (11 m) of the work site shall be relocated or be covered with noncombustible or fire-retardant coated tarpaulins or otherwise

shielded with metal or noncombustible guards or curtains.

Page 20: Hot Work Permitting

20

Where to get questions answered?

Your supervisor is responsible for all necessary equipment and for contacting the person in your park or work unit that can provide additional assistance, such as the PSFC.

The PSFC will issue all permits and answer any specific questions about fire protection systems, fire prevention measures and precautions.

National Structure Fire Program Office, NIFC, Boise Idaho 208-387-5209 or 208-387-5245.

Page 21: Hot Work Permitting

21

Another historic structure damaged

• 3/18/02, 11:53 pm• 212 firefighters, 33 engines, 19 trucks, 8

medical/rescue and 18 overhead responded to a report of “flames showing.”

• Renovation/adaptive reuse of a 196,000sf., 4 story NPS owned historic cannery building

• Cause – “Accidental (welding operation)”

Page 22: Hot Work Permitting

22

Historic NPS structure damaged from lack of enforced Hotwork Permitting

• Estimated property value = $10,000,000.00• Estimated contents value = $10,000,000.00• Estimated property damage =

$6,000,000.00• Estimated content damaged =$5,000,000.00

Page 23: Hot Work Permitting

23

These losses could have been easily prevented had a hot work permitting process been in

place and enforced!