Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
TITLE:
PRO JECT:
Figure 22.3Construc tion Tra ffic Routing
CLIENT:
W SP House, 70 Cha nc ery La ne, Lond on, W C2A 1AF, UK,T+ 44 (0) 020 7314 5000
wsp.c om
DRAW ING STATUS:FINAL
AQUIND Interconnector
Loved ea n_substa tionO rd er LimitsProposed Converter Sta tion Construction Route
AQUIND Interc onnec tor
The Infra structure Pla nning (Applic a tions: Presc rib edForms a nd Proc ed ure) Regula tions 2009 – Regula tion 5(2)(a )
¯
0 0.4 0.80.2 Km
REV DATE BY DESCRIPTION CHK APP
© W SP UK Ltd
DRAW ING NO :
PRO JECT NO :
SCALE AT A3 CHECKED: APPRO VED:
DESIGNED: DRAW N: DATE:SGSG
CW CW1:20,000
EN020022
EN020022-ES-22.3 01REV.NO .
13/11/2019
01 13/11/2019 SG FIRST ISSUE CW CW
Reprod uc ed from O rd na nc e Survey d igita l ma p d a ta © Crown c opyright [d a te]. All rights reserved . Lic enc e numb er [a d d numb er].© Crown c opyright ma teria l is reprod uc ed with the permission of La nd Registry und er d elega ted a uthority from the Controller of HMSO . This ma teria l wa s la st upd a ted in [d a te] a nd ma y not b e c opied , d istrib uted , sold or pub lished with out the forma l permission of La nd Registry. O nly a n offic ia l c opy of a title pla n or register obta ined from the La nd Registry ma y b e used for lega l or other offic ia l purposes.Ma y c onta in pub lic sec tor informa tion lic ensed und er the O pen Government Lic enc e v 3.0.
1
HO RNDEAN