HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT

Pre-Submittal Meeting

1

Page 2: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

NATIONAL WESTERN CENTER PROGRAM CAPITAL BUILD HORIZONTAL PORTFOLIO

An Overview

Page 3: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

NATIONAL WESTERN CENTER CAPITAL BUILD PROGRAMHORIZONTAL PORTFOLIO

PROGRAM ORGANIZATION OVERVIEW

Overall Program Organization and Horizontal Portfolio responsibilities

Page 4: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

NATIONAL WESTERN CENTER CAPITAL BUILD PROGRAMPROGRAM GOALS

• Health, Safety, Security and Environment – Achieve world-class health, safety, security, and environmental performance;

• Cost – Deliver the NWC program within the defined budget while respecting funders’ investments, maintaining fiscal transparency and sustainability, and maximizing the value of every dollar spent;

• Schedule – Deliver the NWC Program on time and predictably to achieve program milestones;

• Design – Design the campus and its facilities to reflect the desired character to be cost-effective and to be accessible, functional/operational, safe/secure, and sustainable while preserving and enhancing the campus’ historic and cultural value;

• Concurrent Operations – Ensure the capital build activities consider and integrate with ongoing campus operations and events;

• Regeneration (known as ReNEWW – Regeneration of Natural Environment, Energy, Water and Waste) –Integrate an ethic of regeneration across the program to secure a sustainable legacy; and

• Community – Meaningfully engage and activate the community to improve the quality of life and integrate the campus and adjacent communities

Page 5: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

HORIZONTAL INTEGRATED CONSTRUCTION SERVICES

An Effort Overview

Page 6: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

HORIZONTAL INTEGRATED CONSTRUCTION SERVICES(HIC)

6

The Horizontal Integrated Construction Services contract is an innovative contracting method that provides a solution to meet the needs of a Large Capital Build Program such as the National Western Center by providing:

• A Single Point of Responsibility

• Critical Team Members with Prime Experience with Campus Delivery

• Preconstruction- Lifecycle focus on Cost, Schedule and Efficient delivery

• Site Wide Management of the NWC Campus Construction

• Community Interface

• Overall and Concurrent Operations Logistics

• Integration of Various Concurrent Construction Efforts

• Competitive Work Order Procurement Process

• MWBE Opportunity

• Promotes Transparency

• Efficient Implementation of NWC Program Performance Goals

Page 7: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

HIC CONTRACT OVERVIEW

• Contract Type: Integrated Construction Model• Task Order and Work Order Based

• Contract Capacity: $275 Million

• M/WBE: Goals will be assigned to each Work Order

• Contract Duration: Initial five (5) year duration (2 year possible extension)

• Anticipated Contract Start: Q2 2018

• Anticipated Construction Start: Q4 2018

7

Page 8: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

BENEFITS OF AN INTEGRATED CONTRACT• This contract is built for maximum industry participation – small, medium and

large firm opportunities!

• Services will be procured and contracted on a Task Order or Work Order Basis

• Goals will be assigned to each Work Order which increase M/WBE opportunities and allows for greater participation including over time

• Prime Contractor will serve as single point of contact for all Work Orders and will be responsible for “stitching together” Design, Construction and Concurrent Packages

• Allows for scope packaging refinement as the campus is developing- buying only what we need, when we need it with the greatest amount of information at time of need

Page 9: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

9

HIC SCOPE OF WORKPre-Construction and

Site Wide Management(Type 1)

• Pre-Construction for Individual Work Packages (for example):

• Cost Estimating• Scheduling• Value Engineering• Design and Constructability Reviews

• Site Wide Management (for example):• Health, Safety, Security and

Environment• Environmental Management

• Sitewide Permitting• Management/Coordination• Public Information• Workforce Development

Final Construction of Horizontal Portfolio Elements

(Type 3)• Enabling Works (Bulk Earth Work)

• Environmental Remediation• Site Wide Infrastructure

• Final ROW; Roads• Utilities• Bridges• Sidewalks

• Rail Consolidation• Pad-Ready Site Development• Temporary Works• Riverfront Open Space

Temporary Site Works

(Type 2)• Overall Site Services to enable

Construction (for example):• Central Site Construction

Office • Noise and Dust Control• Survey• Traffic Control• Erosion and Sediment Control• Snow Removal• Overall Construction

Coordination• Vegetation Removal• Logistics and Interface with

Concurrent Operations

Page 10: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

ITEMS IN RFQ TO NOTE

• Personnel with Specifically Requested Resumes:• Health, Safety, Security Manager

• Environmental Manager

• Workforce Coordinator

• Key Personnel

• Core Team

• Core Support (Resumes OR Bibliography Information)

• Permitting

• Qualifications/Values

• Understanding of the IC Delivery Method

Page 11: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

HORIZONTAL INTEGRATED CONSTRUCTION SERVICES

Procurement

Page 12: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

THE HIC PROCUREMENT SCHEDULE Tentative Schedule (Subject to Change):

• Advertise and Issue RFQ………………………………………………………..December 18, 19 and 20, 2017• Pre-Submittal Meeting 9:30a.m., conference room 4F6……………………………….January 4, 2018• Deadline to Submit Questions 2:00 p.m……………………………………………………..January 11, 2018• Printed Responses to RFQ Due 10:00 a.m…………………………………………………..January 30, 2018• Notify Short-Listed Firms, Issue RFP, and Schedule Interview…………………….February 15, 2018• Deadline to Submit Questions 3:00 p.m……………………………………………………..February 22, 2018• Printed Responses to RFP Due 10:00 a.m……………………………………………………….. March 7, 2018• Interviews………………………………………………………………………………………………………March 14, 2018• Notice of Selection………………………………………………………………………………………..March 19, 2018• Contract Execution/Notice to Proceed………………………………………………………………….....Q2, 2018

*Note: All dates are subject to change, and contracts over $500,000.00

must be approved by City Council.

Page 13: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

SO WHAT ARE WE LOOKING FOR ANYWAY?

Page 14: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

14

Advertisement for Procurements:www.work4denver.com

Procurement Process Questions?Jill Ferguson- PW Contracts Procurement Manager

[email protected] 720-913-1773

Beth Zollo- PW Procurement and Contract [email protected] 720-913-1774

PUBLIC WORKS CONTRACTING

Page 15: HORIZONTAL INTEGRATED CONSTRUCTION SERVICES CONTRACT€¦ · HORIZONTAL INTEGRATED CONSTRUCTION SERVICES (HIC) 6 The Horizontal Integrated Construction Services contract is an innovative

15

DIVISION OF SMALL BUSINESS OPPORTUNITY (DSBO)

Natalie Fraunfelter NWC Compliance [email protected] 720-913-1635