Oleoducto Bicentenario de Colombia SA commended to renew an oil pipe line in the east of Colombia, named Bicentennial Pipeline. Five out of six bores executed are part of the construction in order to realize the longest oil pipeline in Colombia. The drilling line runs from Araguaney to the Caribbean harbour of Coveñas with diameters of 36" up to 42". Upon completion the pipeline will have a length of over 960 kilometres.
Horizontal Directional
Drillings Colombia
ClientOleoducto Bicentenario de Colombia SAMain contractorSicim, ColombiaProjectBicentennial Pipeline lot 1LocationTame, Arauca Colombia Implementation periodJune 2012 - July 2013
ClientOcensa (Oleoducto Central SA)Main contractorSicim, ColombiaProjectCrossing Rio San JorgeLocationBuenavista, Caucasia Colombia Implementation periodJune 2012 - July 2013
A.Hak Drillcon BV acquired the employees and HDD equipment of NACAP BV, August 2012
0287 HAK_leaflet HDD Colombia GB.indd 1 16-01-14 13:30
ADDRESS Engelseweg 159 5705 AD HelmondPOSTAL ADDRESS A.Hak Drillcon B.V. PO Box 715 5700 AS HelmondT +31 (0)492 345 600 F +31 (0)492 345 601 @ [email protected]
WWW.A-HAKDRILLCON.NL
A.Hak Drillconsuccesfuloverseas
Successful river crossings by Horizontal Directional Drillings (HDD) 1.322m1 42" river crossing Rio Casanare, execution period June - July 2012 1.588m1 42" river crossing Rio Tame, execution period October - November 2012 800m1 42" river crossing Rio Banadia, execution period December 2012 - January 2013 1.343m1 24" river crossing San Jorge, execution period March - April 2013* 810m1 42" river crossing Rio Caranal, execution period April - May 2013 1.050m1 42" river crossing Rio Culebrero, execution period June - July 2013
* During Bicentennial Pipeline lot 1, Sicim Colombia and A.Hak Drillcon BV entered a second project named Crossing Rio San Jorge on behalf of Ocensa (Oleoducto Central SA) January 1st 2013.
DETAILS
The entire project was considered very diffi cult considering the geology of coarse sand, gravel and boulders, especially the bore of the Rio Culebrero. Other drilling contractors were approached, but they found the conditions too challenging. Finally A.Hak Drillcon BV made the commitment to execute the project.
A.Hak Drillcon BV, using experienced staff, the right equipment and better use of drilling fl uid, ensured that all bores have been successfully completed.
0287 HAK_leaflet HDD Colombia GB.indd 2 16-01-14 13:30