PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and HOM Issues in LER Ring and IR. IR. Recent measurements and Recent measurements and calculations. calculations. Sasha Novokhatski SLAC

HOM Issues in LER Ring and IR. Recent measurements and calculations

Embed Size (px)

DESCRIPTION

HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski SLAC. More LER & HER currents – more HOM Heating. LER ring TSP feed-through & Bellows Vacuum pumps & NEGs (new) HER ring Bellows (new) Interaction region Vertex bellows & near bellows. - PowerPoint PPT Presentation

Citation preview

Page 1: HOM Issues in LER Ring and IR. Recent measurements and calculations

PEP-II Machine Advisory Committee Meeting SLAC,

April 15-17, 2004

HOM Issues in LER Ring and IR.HOM Issues in LER Ring and IR.Recent measurements and calculations.Recent measurements and calculations.

Sasha Novokhatski

SLAC

Page 2: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 2SN

More LER & HER currents –More LER & HER currents – more HOM Heating more HOM Heating

LER ring– TSP feed-through & Bellows – Vacuum pumps & NEGs (new)

HER ring– Bellows (new)

Interaction region– Vertex bellows & near bellows

Page 3: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 3SN

Fight against high temperaturesFight against high temperatures

Water and air cooling– Fans for bellows in all LER and HER regions– Special cooling for vertex bellows

Damping High Order Modes by water cooled RF absorbers– HOM absorber in LER arc chamber

Improving RF screens

Page 4: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 4SN

HOM measurements and HOM measurements and computer simulationscomputer simulations

HOM spectrum measurement:– Signals from BPMs– RF antenna near TSP feed-through– RF antenna near HV cable in vacuum pumps

HOM power measurement:– Thermocouples on input and output water

cooling system with water-flow measurement

Computer simulation:– Calculations with MAFIA and other wake field

programs

Page 5: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 5SN

HOM absorber in region 4HOM absorber in region 4

HOM Absorber

TSP

1162

Bellows2012

Page 6: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 6SN

Absorber: ceramic tiles with large Absorber: ceramic tiles with large loss tangent and water cooling tubeloss tangent and water cooling tube

Page 7: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 7SN

Effect of absorberEffect of absorberon TSP feed-throughon TSP feed-through

Temperature

LER current

Nov. 2002-Apr. 2004

Page 8: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 8SN

TSP in the next arc chamber 1153TSP in the next arc chamber 1153

Nov. 2002-Apr. 2004

Page 9: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 9SN

Analog TSPs in region 12 do not Analog TSPs in region 12 do not have high temperatureshave high temperatures

Artem KulikovHOM detectors

installed in June 2003

Page 10: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 10SN

HOM spectrum measurement: antenna HOM spectrum measurement: antenna and spectrum analyzer near TSP 1163and spectrum analyzer near TSP 1163

Page 11: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 11SN

HOM power measurement: digital HOM power measurement: digital water flow meter and thermocoupleswater flow meter and thermocouples

Page 12: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 12SN

Power Power relationsrelations

2 1360

3.8

200

RF

bunches

VP Z I

MV N

Z Ohm

Prediction for HOM power

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

0 1000 2000 3000 4000

LER current [mA]

HO

M p

ow

er [

W]

V=3.2MVN=1200

V=3.8MVN=1360

V=5.6MVN=1700

V=6.4MVN=1715

Now we are here

Page 13: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 13SN

The hottest bellows in the LERThe hottest bellows in the LER

LER Bellow 2012 PR04with ‘super” fan

Nov. 2002-Apr. 2004

Page 14: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 14SN

Examples of RF modes. S. WeathersbyExamples of RF modes. S. Weathersby

Magnetic field Electric field

Page 15: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 15SN

Proposal for absorber for arc bellowsProposal for absorber for arc bellows

Copper buttons

Absorber tiles

Water cooling tubes

Page 16: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 16SN

MAFIA . Stephen Weathersby computation.

1.E+01

1.E+02

1.E+03

1.E+04

1.4E+09 1.9E+09 2.4E+09 2.9E+09 3.4E+09 3.9E+09 4.4E+09

frequency [Hz]

Q wall-mag

3-az-mag

no abs mag

Comparison of 1-tile thick covered Comparison of 1-tile thick covered flange absorber with azimuthal 2x3-tile flange absorber with azimuthal 2x3-tile mount and the no absorber Q values.mount and the no absorber Q values.

Page 17: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 17SN

HOM spectrum HOM spectrum in IP region. in IP region.

Page 18: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 18SN

Vertex bellowsVertex bellows

Bellow

Cavity

bunch field ‘‘Mode Converter”

Page 19: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 19SN

Vertex bellows. RF Modes .Vertex bellows. RF Modes .Stephen Weathersby computation.

Page 20: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 20SN

Quadruple modeQuadruple mode

Page 21: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 21SN

Damping HOMs in vertex bellows. Damping HOMs in vertex bellows. Simulation study by S. Weathersby.Simulation study by S. Weathersby.

Decreasing Q-value of a bellow cavity by placing absorber

Best position of absorber.

Low Q decreases power dissipation.

10

0

1 022

1 0

0 1

20 1

1

1

in

4(1 )

( )

4 /

(1 / )

cav

waveguide

cav inc inc

cav inc

Reflection from cavity

ZQQ

Z Q

Power a cavity

Q QP P P

Q Q

Q QP P

Q Q

Page 22: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 22SN

Power dissipation a bellow cavityPower dissipation a bellow cavity

Q/QbettaPower in cavity 0.01 0.04

0.1 0.330.2 0.560.5 0.890.7 0.97

1 12 0.895 0.56

10 0.3315 0.2320 0.18

Power in cavity

0

0.2

0.4

0.6

0.8

1

1.2

0 1 2 3 4 5 6 7 8 9 10

Q0/Qbetta

Page 23: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 23SN

Absorber on the one side does not well damp modes!

Vertex Bellows

1.00E+00

1.00E+01

1.00E+02

1.00E+03

3.00E+09 5.00E+09 7.00E+09 9.00E+09 1.10E+10 1.30E+10

Frequency

Q-v

alu

e

no absorber mag mag

no absorber elec mag

mag mag

mag elec

Page 24: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 24SN

Absorber on the other side. Still not good damping.

Page 25: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 25SN

Q value

10

100

1000

10000

4.0E+09 5.0E+09 6.0E+09 7.0E+09 8.0E+09 9.0E+09 1.0E+10 1.1E+10 1.2E+10 1.3E+10

frequency [Hz]

QQ Cu no absorber

Q absorber 0.5mm

Q absorber 1.0mm

Q absorber 1.25mm

Q absorber 1.5mm

Absorber on the wall

Page 26: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 26SN

Power in a cavityPower in a cavityX Power in cavity

0.01 0.0392120.1 0.3305790.2 0.5555560.5 0.8888890.7 0.968858

1 12 0.8888895 0.555556

10 0.33057915 0.23437520 0.181406

Power in cavity

0

0.2

0.4

0.6

0.8

1

1.2

0 2 4 6 8 10

Q0/Qbetta

Page 27: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 27SN

HOMs in vacuum pumpsHOMs in vacuum pumps

Page 28: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 28SN

Vacuum pump (LER PR2:3044) HOM Vacuum pump (LER PR2:3044) HOM spectrum. Frequency range 0-10 GHzspectrum. Frequency range 0-10 GHz

Antenna in HV connector

Page 29: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 29SN

Frequency range 3-6 GHzFrequency range 3-6 GHz

Page 30: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 30SN

Q-value estimationQ-value estimation

0

5

10

15

20

25

30

-1 -0.5 0 0.5 1 1.5 2 2.5 3

Delta Frequency [MHz]

Sp

ectr

um

F=4.046119 GHz Breit-Vigner Q=6100

02468

101214161820

-1 -0.5 0 0.5 1

Delta frequency [MHz]

Sp

ectr

um

F=5.236GHz Breit-Vigner Q=12000

Page 31: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 31SN

RF screen for vacuum pumpRF screen for vacuum pump

Page 32: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 32SN

RF screens for NEGsRF screens for NEGs

Page 33: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 33SN

Other screenOther screen

Page 34: HOM Issues in LER Ring and IR. Recent measurements and calculations

15-April-2004 PEP-II MAC Session 34SN

SummarySummary

More water and air coolingDamping High Order Modes by water

cooled RF absorbersSimulation studies on improvement of

beam chamber elements and RF screens