99
© 2011 IBM Corporation Title: HMC and Firmware Management for POWER5/6/7 Allyn Walsh – [email protected] IBM POWER Systems HMC and Firmware Webinar February 24, 2011

HMC+and+Firmware+AIX+VUG Feb+2011

  • Upload
    myssa91

  • View
    923

  • Download
    7

Embed Size (px)

Citation preview

Page 1: HMC+and+Firmware+AIX+VUG Feb+2011

© 2011 IBM Corporation

Title: HMC and Firmware Management for POWER5/6/7

Allyn Walsh – [email protected]

IBM POWER Systems HMC and Firmware WebinarFebruary 24, 2011

Page 2: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation2

Agenda– Introduction to Hardware Management Console

– Requirements and hardware review • Basic configuration and server connection options

– Remote management options

– HMC LPAR Wizard overview

– Managing HMC Firmware• Three pieces of Power Systems Maintenance• Managing HMC Updates and Upgrades• HMC – Back up and Recovery scenarios

– Review enhancements in HMC V7R3• Highlights for V7R3.1 – V7R3.5

– Overview System Firmware

– Firmware Upgrade Policies• OS managed• HMC Managed

– Manage your server firmware• Options for obtaining code updates or upgrades

Page 3: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation3

7310-CR2/3/4 or 7042-CR4/5/6shown with 1U keyboard & flat

panel (rack)

A user interface for POWER5/6/7 Server Management – External appliance with a ‘locked’ Operating System– Intel based platform - GUI console application– Third party applications locked out– Virtualization and hardware management– Regular refreshes on the hardware technology

Includes console capability for IBM i (5250), AIX 5L and Linux Remote management of HMC functions

– WebSM client – remote GUI to HMC for V6.1.3 and all earlier versions– Standard browser for remote GUI access to HMC V7.310 and above– i5/OS 5250 console interface via Telnet client– Secure shell (SSH) access to CLI command line interface

POWER6 requires HMC firmware level V7.310 or later POWER7 requires HMC firmware level V7.710 or later

– V7.xxx is backward compatible with POWER5• Support statement: level SF240_299 or later for V7.3 or SF240_358 for V7.7

HMC Supports:– Max of 48 Servers, up to 254 partitions, (1024 partitions with V7.7)– Max of 2 HMC's per server.

What is the HMC

7310-C03/4/5/6 or 7042-C06/7/8monitor & keyboard separate

(desktop)

Page 4: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation4

Hardware Management Console - Model refreshes

7316 Rack mounted display and keyboard

• HMC function is based on HMC Ver/Rel (not the HMC model)• Any 7310-Cxx model can be upgraded to V7R3 (minimum HMC level required for

POWER6)• 7310-C03 can not be upgraded to V7R7 (V7R7 will install on CR2 and C04)• Minimum HMC model for POWER7 management: 7310-CR3 or later model rack-

mount or 7310-C05 or later deskside

(desktop)

(rack)

7310-CR2

7310-CR3

7310-CR4POWER6 servers & new HMC orders will default to models 7042-Cxx preloaded with latest V7R3 codePOWER7 servers & new HMC orders will default to models 7042-Cxx preloaded with latest V7R7. code

7310-C03

7310-C04

7310-C05

7310-C067042-C06

7042-C07

7042-C08April 13,2010

7042-CR4

7042-CR5

7042-CR6Sep 17,2010

Page 5: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation5

Currently available HMC’s – 7042-CR5 & 7042-C08

Memory upgrades are available for HMCs:

7042-C06/C07, 7310-C06, 7042-CR4, and 7310-CR3/CR4.

For any CR3, CR4, C06, or C07 models already installed in the field, 2 GB or 4 GB upgrades can be ordered via MES

Base configuration C08

2.53 GHz Intel® Quad-core processor with 8 MB L2 cache

4 GB (2 x 2 GB) DDR3 system memory

Integrated Gigabit Ethernet

250 GB SATA 3.5-inch HDD

SATA CD/RW - DVD-RAM

Base configuration CR6 (9/17/2010)

2.53 GHz Intel® Quad-core processor with 8 MB L2 cache

4 GB (2 x 2 GB) of 1333 MHz DDR3 system memory

Integrated quad Gigabit Ethernet

250 GB SATA 3.5 inch HDD

SATA CD/RW - DVD-RAM

Minimum HMC levels:

CR6 = V7R7.2, C08 = V7R7.1,

Page 6: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation6

Power Systems virtualization management requires an HMC– Micro-processor partitioning– Improves fault tolerance and lower partition management

costs– No primary partition (reduced hardware requirements)– Power Systems support; IBM i, AIX, x86 and Power Linux– PowerVM– Advanced management features:

•Provides automatic processor balancingwith shared processor pools

•Per core license management with multiple shared processor pools

•Capped or uncapped processor partitions•Dedicated processor assignment with optional

‘Shared dedicated’ on POWER6/7•Advanced Memory sharing•Advanced memory expansion•Live Partition mobility•Advanced concurrent maintenance actions

POWER Systems - Logical Partitioning

Up to 1024 partitions on V7 HMC

Page 7: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation7

Power Systems LPAR LayoutHMC connects to the server FSP. Each FSP has two Ethernet ports. Some servers have dual FSPs.

To manage multiple servers or any server with dual FSPs, requires a customer supplied Ethernet switch or Hub to provide a one to multiple connection path.

PrivateNetwork

Rack Mount HMC

VIOSIBM i AIX LINUX

Power Hypervisor (PHYP)

LICA | B

TIMI

Flexible Service Processor (FSP)HMC-0

HMC-1

System Power Control Network (SPCN)

PFW-RTAS

PFW-RTAS

TIMI = Technology Independent Machine Interface LIC = System Licensed Internal CodePFW = Partition Firmware RTAS = Run-Time Abstraction Services

Flash MemoryPerm | Temp

PFW-RTAS

Page 8: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation8

LPAR on a Power5/6/7 System N

on-V

olat

ile R

AM

Firmware – Hypervisor

Linux

LPARAllocation Tables

AIX 5L

FSP/ASMIProcessors

Mem Regions

I/O Slots

ServerServer

HMCHMC

EthernetPerm | Temp

IBM iLIC

A | B

HMC-0HMC-1

VIOSPFW PFWPFW

A second HMC, or directly access ASMI from a

browser

Page 9: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation9

HMC1 will manage 570-A and 570-B by attaching to HMC0-Port on both Service Processors of each 570 using subnet 1.1.1.x

HMC2 will manage 570-A and 570-B by attaching to HMC1-Port on both Service Processors of each 570 using subnet 2.2.2.x

NOTE: Dual HMC’s must use different subnets for server management.

FSP HMC0

HMC1

FSP HMC0

HMC1

FSP HMC0

HMC1

HMC1

DHCP-SUBNET-1.1.1.1

Switch

Redundant HMCs - example two HMCs managing two servers each with redundant FSPs

570-A

570-B

Internet

Switch

HMC2

DHCP-SUBNET-2.2.2.2

Intra-net Network

Enable a second (or even a third to isolate networks even further)Ethernet port on the HMC for open system network connectivity. This will potentially enable HMC to be accessed remotely, allow HMC to HMC communication, HMC to RMC (partition communication for Inventory Scout and DLPAR), enable HMC to access internet (i.e. Call Home, download maintenance updates).

FSP HMC0

HMC1

Page 10: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation10

HMC1 will manage 570-A in LA attaching to HMC0-Port on each of the two Service processors HMC2 will manage 570-B in Dallas attaching to HMC0-Port on each of the two Service Processors

By using static IP addressing, either HMC3 or HMC4 located in NYC (one or the other due to two HMC’s per server MAX) can be used to connect and manage 570-A and/or 570-B connecting to HMC1-Port on each of the four Service Processors

NYC

Redundant HMCs – with remote control center

Switch

FSP HMC0

HMC1

FSP HMC0

HMC1

Switch

FSP HMC0

HMC1

FSP HMC0

HMC1

HMC1

HMC2

Private DHCP-SUBNET-1.1.1.1

Private DHCP-SUBNET-2.2.2.2

HMC4

Static IP address – 9.9.3.88

570-A

570-B

HMC3

Static IP address – 9.9.3.99

Intra-net Network

Static IP address – 9.9.3.1

Static IP address – 9.9.3.2

Static IP address – 9.9.3.4

Static IP address – 9.9.3.3

Rochester

DALLAS

NOTE: 575, 595 and 795 servers require DHCP services by the HMC

Page 11: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation11

HMC (V7.x.x) Welcome panel – Browser based interface

Navigation panel – HMC functions grouped by category

Task panel, expand functions and tasks

NOTE: Starting with HMC V7.3.3 the Call home – remote support configuration is moved to a separate wizard under the Service Management category.

These HMC references are updated with each new version and provide a good foundation.

Page 12: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation12

Start with the POWER Systems Hardware Info centerhttp://publib.boulder.ibm.com/infocenter/systems/scope/hw/index.jsp

http://publib.boulder.ibm.com/infocenter/systems/scope/hw/index.jsp?topic=/arecq/arecqpreparehmc.htmConfiguration Checklist

Page 13: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation13

Guided Setup Wizard

Page 14: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation14

HMC Electronic Service Agent: Connections options

Prior to V7.3.3.0, the Call-Home setup was included in the Guided setup wizard. Now a separate wizard.

Document - HMC Connectivity Security for IBM POWER5/6/7 Processor-Based Systems ftp://ftp.software.ibm.com/common/ssi/sa/wh/n/psw03007usen/PSW03007USEN.PDF

Page 15: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation15

LPAR Creation Wizard

AIX, Linux and VIOS task summary looks very similar, however thewizard will enforce rules. For example, VIO can not be ‘suspended’, VIO not allowed as a ‘client’ Virtual SCSI and AIX/Linux will not allow a ‘server’ VSCSI

Page 16: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation16

Setting Processor + Memory – (Min Max & desired)

Min & Max setting determine the range (boundaries) allowed by DLPAR

Desired Virtual Processor tell the ‘OS’ the number of processors it can dispatch to and this is used to calculate potential processor usage.

Multiple Shared pools can be used to managed license compliance. This can be assigned at LPAR creation, or dynamically at any time.

IBM i has different configuration requirements

Page 17: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation17

Select IO resource: Desired = eligible to be switchableRequired = partition must be able to allocate at activation

Consider using VSCSI for sharing resources such as tape or optical across any or all LPARs when on POWER6/7 using VIOS or IBM i 6.1 hosting the resource.

Page 18: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation18

Virtual SCSI – to share tape or optical or virtual storage

Note: Specific to IBM i - Client adapter will must be flagged as REQUIRED if VSCSI is used to provide access to virtual disk where the load source will reside.

If the client virtual SCSI will only be used for access to Virtual Optical, NOT flagging this adapter as required will allow the partition to activate even if the server side partition is not available.

Note: This would be configured on the server partition that owns the resource (VIOS or IBM i).

Can be configured in the partition profiles or completely dynamic using DLPAR

Page 19: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation19

Manage your optical resources using VIOS

Page 20: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation20

Page 21: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation21

IBM i hosting partition – multiple optical drives supported

Page 22: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation22

The 3 Pieces of Power Systems Maintenancei5

Man

aged

Syst

em

Server Firmware• Power Hypervisor• Flexible Service

Processor (FSP)• Power Code (BPC)

HMC• Updates and Upgrades

Partition Maintenance• IBM i, AIX, Linux

Page 23: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation23

Manage multiple servers POWER5/6/7 from V7.7.1

View and Manage maintenance for HMC and server

firmware

Multiple Firmware code levels.

Notice: 3 identifiersAll POWER5 would show as 01SF240

Summary view of HMC firmware level, serial number and BIOS

Page 24: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation24

Old HMC Home page now redirects to Fix Centralhttps://www14.software.ibm.com/webapp/set2/sas/f/hmc/home.html

http://www-933.ibm.com/support/fixcentral/main

Page 25: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation25

Fix Central Wizard – cont.

In this example, assume my HMC is currently on V7R3.4.0M0 My goal is to get this HMC to the most current level, which is V7.7.1 sp2 The wizard will show me what is needed to get from “Point A” to the target level.

This is the new source for all your critical and helpful links

Page 26: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation26

Select the HMC ‘target’ level – view compatibility

Check compatibility

Page 27: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation27

Moving to V7.7.2 from V7.7.1

note changes in P7 support

Page 28: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation28

The readme provides extensive details + links

Page 29: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation29

POWER code matrixhttp://www14.software.ibm.com/webapp/set2/sas/f/power5cm/power6.html

Page 30: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation30

Instructions - upgrade to HMC V7.710 from older releases http://www14.software.ibm.com/webapp/set2/sas/f/hmcl/power7/v7.Upgradenotes.html

If your target is to get to HMC 7.350

Std upgrade support is N-2

Page 31: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation31

Upgrade procedure using DVD mediahttp://www14.software.ibm.com/webapp/set2/sas/f/hmcl/power6/install/v7.Recover_Upgradep6.html

Page 32: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation32

Network install – download images and instructionshttp://www14.software.ibm.com/webapp/set2/sas/f/hmcl/power6/install/v7.Recover_Upgradep6.html

Page 33: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation33

Network install or Upgradehttp://www14.software.ibm.com/webapp/set2/sas/f/netinstall/home.html

Notes:If your HMC is currently running HMC 6.1.3, you can perform a remote upgrade to HMC 7.3.4.0, 7.3.5.0, 7.7.1.0 or 7.7.2.0 by first applying PTF MH01127 to HMC 6.1.3, and then using the appropriate network images.

Without this efix upgrading from HMC 6.1.3 to HMC 7.3.3.0 or later is a two-step process. You must first upgrade to HMC 7.3.2.0 (or HMC 7.3.1.0), and then upgrade to HMC 7.3.3.0

Follow these basic steps.1. Download the appropriate HMC V7 network images and put them on an FTP server. 2. Verify that the following files have been downloaded:

initrd.gz, bzImage, disk1.img, disk2.img, and disk3.img 3. On the HMC, you must first save upgrade data by running the following commands:

(or this can be done from the GUI immediately before starting this process): To save data to both DVD and disk:

mount /media/cdromsaveupgdata -r diskdvd

To save to disk alone:saveupgdata -r disk

Next, run the command:getupgfiles -h <host name> -u <user ID> [--passwd <password>] -d <remote directory> [-s]

to copy the files over to the bootable disk partition on the HMC. After the files are copied over, run the following command:

chhmc -c altdiskboot -s enable --mode upgradeNow the HMC is ready to be rebooted and automatically upgraded with the code copied to the bootable disk partition. Finally, issue the command

hmcshutdown -r -t nowto reboot the HMC and start the upgrade.

Instructions for network install

Page 34: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation34

Sign up for notification on critical topicshttps://www.ibm.com/systems/support/myview/subscription/css.wss/folders?methodName=listMyFolders

Example Notification

Page 35: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation35

Back Up HMC Data

• What gets Backed Up• Where can the Back Up be Saved• Performing a Back Up• Restoring Critical Data

Those files with a timestamp later than the trigger file are candidates for backup.

The data that is backed up can be divided into 2 categories

– HMC specific• User Profiles• Roles and Tasks• Network Configuration• Applied Corrective Service Updates

– HMC operating system• Service packs, eFixes• OS Security update• Info center

In general, Backup HMC Data archives:– Code Changes to the HMC Application(s) since the last

install or recovery upgrade– HMC unique configuration changes since the last install or

recovery upgrade• User Profiles• Network Configuration• Service Data• Etc.

– Platform specific information since the last install• Managed Systems• Partition Profiles • Etc.

– HMC operating system updates applied since the last install

Page 36: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation36

Save Critical Console Data ‘renamed’ Save HMC data in V7 vs. Save Upgrade data

Two methods of HMC software Release Upgrades– Update via corrective service – ‘Update.zip or Update.ISO’ files– Upgrade with new release Recovery CD’s (V5R1 and later uses DVD media) For example

upgrading from V7.310 to V7.330 or directly to V7.350

Size matters – could be +2GB saves when the ‘Update’ option is used Save performance is improved when upgrading using Recovery media vs

CCD is not a ‘bootable’ save of the HMC– In a recovery scenario you need:

• BOOT from the HMC Recovery DVD that was used with the install or the last upgrade • PLUS – Restore the Save CCD data.

– Options to Save to: • DVD-RAM (RAM is the only DVD media supported for write operations)• USB flash drive• FTP server• NFS server

Save Upgrade data is NOT the same as CCD– Use this option only IMMEDIATELY before an HMC Upgrade (booting from Recovery Media)

• Saves only user modified System configuration, User Profile & Security info, Service information

Page 37: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation37

Why CCD backup can take a while…

Two methods of HMC software Release Upgrades

– Update via corrective service – ‘Update.zip or Update.iso’ files

– Upgrade with new release Recovery DVD’s in Network Install Images

– For example upgrading from V7R3 to V7R7

Size matters – could be +1GB

Save performance is improved

HMC Recovery DVD set V7R3.1 HMC Update packages V7.3.2, V7.3.3 then V7.3.4 User data

HMC Recovery DVD set V7.3.4 User data

Data saved in backup A

B Data saved in backup

Critical Console Data Backup

What would be my recovery if I installed my HMC with V7R3 and then updated my HMC from V7R3.3 to V7R3.4 using the MH01109 update media, then applied MH01163 (sp1) followed by MH01162 (sp2) and finally MH01186 (sp3) and perform a Save HMC Data at this point???

= V7R7 SP3

Page 38: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation38

HMC Management panel

Page 39: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation39

Example backup – V7.720 (upgraded) from 7.710

I missed getting the time capture, something greater that 15 minutes, but less than 30 minutes

Page 40: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation40

Customize User Management – Tasks and Roles Enhanced Password policies allow for

– Policies to be applied system wide.

– Administrator specified password requirements.

– Replication of password policies to other slave HMCs

CLI only

– lspwdpolicy

– mkpwdpolicy

– rmpwdpolicy

– chpwdpolicy

See man pages for documentation

Page 41: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation41

First - Create Managed Resource and task roles

After creating the Resource and task roles, create a user profile restricted

to these roles.

Limit resource access to a single server (ATS_750) and two partitions on that server.

Limit Task access to console management on 1 server and two partitions.

Limit resource access and tasks to a specific subset

Page 42: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation42

Assign roles to a user ID

This enables or prevents GUI access to the HMC

In this example, user ID ‘Console’ has very limited authority. It is NOT allowed to sign on to the HMC GUI, but can sign on through the 5250 emulation and start or join a console session for one IBM i partition.

Page 43: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation43

View and manage signed on users – active tasks

Page 44: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation44

HMC V7 provides an improved partition overview

sensitive to get deails

The server partition view shows much more detail upfront versus earlier HMC versions

Next we will look at server properties – review serverresources, where are they CURRENTLY assigned. What functions is this server capable of. Then we willook at Attention indicators or Serviceable Events.

Page 45: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation45

Server Properties – shows current resource assignments

If you use DLPAR to move, add or remove resource, i.e. memory, processor units or IO slots, this is where you will find current assignments.

Page 46: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation46

Server Properties continuedServer CAPABILITIES is set by the Virtualization Engine Technology (VET) code. PowerVM edition will affect the features that are enabled

Page 47: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation47

Capacity On Demand - panels

Page 48: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation48

Remote access disabled by default– Task to enable/disable remote access – User Profiles task to enable for specific users

Security– Certificate based SSL security for encrypted communications– Certificate Management task

Browser Compatibility

Linux WindowsMozilla Firefox 1.5.x + 1.5.x +Microsoft IE 6.x +

HMC R7V3.1.0 – Web UI, Browser Support

Integrated Virtual Ethernet (aka HEA) What’s in a Name

– Integrated Virtual Ethernet (IVE) – External name in marketing & other documentation

– Host Ethernet Adapter (HEA) – Name used on user interfaces

Integrated on most POWER6/7 systems (all but the POWER6 595 & POWER7 795)

Provides accelerated Ethernet connectivity– Essentially, a system with HEA has several

integrated Ethernet adapters, called logical ports. – Can be assigned to one or more partitions.

– At one IVE per system enclosure

16 logical ports allowed per port group: MCS = 1 8 logical ports allowed per port group: MCS = 2 4 logical ports allowed per port group: MCS = 4 2 logical ports allowed per port group: MCS = 8 1 logical ports allowed per port group: MCS = 16

Several variations of physical, external ports – Dual 1 Gbit copper, supporting 10BASE-T, 100BASE-T,

1000BASE-T– Quad 1 Gbit copper , supporting 10BASE-T, 100BASE-T,

1000BASE-T– Dual 10 Gbit fiber, supporting 10GBASE-SR or 10GBASE-LR

Logical Ports – Up to 32 logical ports, but can also be configured as 1, 2, 4, 8, 16

logical ports – Controlled by parameter called “Multi-Core Scaling Value”

(MCS)

Page 49: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation49

HMC V7 – is required to configure the HEA adapter

Assign at partition creation, modify partition profile and activate partition from the HMC, or simply DLPAR (Add) logical port

To change the MCS value requires a full server IPL to activate change.

Page 50: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation50

HMC V7R3.1.0 – Shared Dedicated Capacity - before

0

25

50

75

100

125

150

175

200

0.5 Uncapped 20.5 Uncapped 1Wasted Dedicated1-way Dedicated

– Consider a 2-way server with 1-way dedicated partition with variable workload (between 0% and 100%).

– Add two evenly weighted 1-way uncapped partitions that are CPU bound.

– Each uncapped partition will share the remaining physical processor even though each can consume an entire processor.

– The excess capacity on the dedicated processor is wasted.

0

25

50

75

100

125

150

175

200

0.5 Uncapped 20.5 Uncapped 1Wasted Dedicated1-way Dedicated

– With the new support, dedicated partitions with unused cycles will donate those unused cycles to the uncapped partitions.• Donated cycles do not increased a (shared

processor) partition’s entitled capacity.

– The uncapped partitions will share all the available cycles: • They consume an entire processor if available

(when dedicated at 0%) and • Split a processor when the dedicated processor is

fully utilized.

– The total processor capacity in the system is better utilized.

– Dedicated proc LPs still maintain their perf characteristics and predictability

After enabling Shared Dedicated

Page 51: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation51

HMC R7V3.1.0 – HMC Management Enhancements New monhmc command

– Can gather disk space usage and system memory usage

– Some specific processes on the HMC are monitored

Clickable SRCs– The new browser-based interface allows a user

to click on an SRC or Progress Code and pop-up a description of the SRC.

Data replication– This is an application from System z HMC that

allows customer call-home configuration to be replicated between HMCs

3rd party certificates– A customer can now install their own 3rd party

certificates to use with remote connections to the HMC.

Selectable VPN– Allow choice of IP interface to use for the VPN

connection back to IBM.

Page 52: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation52

Server Management – Redundant Service Processor for Power 570 – Enabled at firmware EM320 – Requires

HMC V7R3.2– Discovery / Inventory of I/O Devices (aka Hardware Discovery)– Enhanced System Plan Tool integration

• Uses Hardware Discovery• OS round-tripping (HMC generated sysplan can be exported/imported with SPT)

– Energy Scale (Active Energy) Support – Scheduled Operations for Utility Capacity on Demand

Virtualization Management– Partition Mobility (between servers managed by same HMC)– Multiple Shared Processor Pool Support

HMC Management – User Authentication via Kerberos – Enhanced HMC Monitoring – Ongoing HMC Performance Improvements

Enhancements – functions added with V7R3.2.0

Page 53: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation53

HMC V7R3.2.0 – Hardware Discovery Overview320 level system firmware (or newer)

Functional improvements: – Provides capability to collect I/O device information

before partitions and OS’s are configured or booted to make configuration easier.

– Provides HMC users more detailed view of slot contents especially child devices.• Can view storage device information (what’s on

the SCSI bus). • Can view Ethernet MAC addresses and

FibreChannel WWN’s via HMC. • Can even be done before partitions are

configured.– Provides more detailed inventory to System Plan Tool

to verify system configuration and validate customer orders.

Hardware Discovery CLI lssyscfg –r sys displays new cec capability for

IOR, hardware_discovery_capable chsysstate –r sys includes new option

onhwdisc lssyscfg –r lpar displays new lpar definition

state for IOR in the lpar_env and lpar_type attribute.

lssyscfg –r lpar displays new VSP definition state for IOR in the state attribute

lssyscfg –r prof displays new lpar definition state for IOR in the lpar_env attribute

lshwres –r io -–rsubtype includes new type slotchildren to list IOR slot information

Hardware Discovery can be performed three ways1. Initial Power On (after system leaves IBM): Hardware Discovery performed automatically.

• Only when system is in non-partitioned mode and IO data hasn’t already been collected.2. New Power On “Hardware Discovery” option.

• I/O data collected for both assign and unassigned I/O. • Existing LPs booted into Hardware Discovery; later returned to (bootable) state.• Special LP used to collect I/O data for unassigned I/O.

• System left in Operating state (no auto-boot of partitions).3. Initiated by Create System Plans tool.

Page 54: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation54

RMC set up requirements

System Plans provide more detail when RMC is enabled/configured– Requirements for inventory gathering on the HMC– http://publib.boulder.ibm.com/infocenter/powersys/v3r1m5/index.jsp?topic=/p7hc6/iphc6invscoutreqs.htm

VIOS, IBM i, and AIX (IBM offerings) do RMC by default

Power Linux (SLES, RHEL) need additional RPM– https://www14.software.ibm.com/webapp/set2/sas/f/lopdiags/installtools/home.html

Page 55: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation55

User initiated Hardware Discovery from the HMC.

System Powers On and collects IOR data utilizing service partition.

System left in “Operating” state upon completion.

Partition auto-boot settings not enforced on this type of power on (are persisted for future).

When to use this option:

After repair and verify.

After attaching new expansion unit.

After firmware upgrade.

HMC V7R3.2.0 – HW Discovery, New Power On option

At platform Power On

Checkbox appears with managed

systems that are Hardware

Discovery Capable

Or on a running system

Page 56: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation56

Hardware Discovery partition at platform power on

Page 57: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation57

View HMC generated System plan from the HMC

Page 58: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation58

Slot level (PCI) card assignments

HMC Generated System Plan at V7.330, on POWER6 can see more of the device level details. This example shows Disk details

System plan from the HMC with device level information

Page 59: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation59

Export System from HMC – (export / import for SPT)

The System Planning Tool (SPT) is free, it runs on a stand-alone workstation and enables the user to design a new system. Select the Machine Type and Model, processors, memory and IO hardware, and design the partitions. This can be sent to IBM order processing and manufacturing can build to the plan specifications. The SPT output can also be imported by the HMC and the DEPLOY option can automatically create the partitions. Download from:http://www-304.ibm.com/systems/support/tools/systemplanningtool/

Click on plan name

Page 60: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation60

Download the latest SPT – Subscribe for update notification http://www-947.ibm.com/systems/support/tools/systemplanningtool/download.shtml

Get email notification

Online user manual

Page 61: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation61

Open an HMC generated System Plan using SPT

Page 62: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation62

Convert the HMC generated System Plan for SPT

New reporting section that identifies hardware that will not migrate to POWER7

Page 63: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation63

More on HMC V7R3.2.0 – Energy Scale Capabilities

HMC displays 2 capabilities for power saver mode:

– Firmware power saver capable – Whether the firmware running on the server is capable for power saver mode

– Hardware power saver capable – Whether the hardware supports the power saver mode.

HMC User Interfaces: – GUI (Managed system properties panel) and

– Command line (lssyscfg -r sys)

HMC / ASM provides a small subset of the EnergyScale features.

– Enable / Disable of Power Saver Mode

– Schedule Operation for Power Saver Mode

– Pass through channel for PowerExecutive / Director

PowerExecutive / Director provides the complete set of EnergyScale functions.

– PowerExecutive was originally a power management plugin for System x. It is now the official management console for EngeryScale feature

With power saver capable systems, users can enter static power save through the power saver mode configuration task

With power saver mode enable, the processing utilization reporting might not be accurate if the OS does not have the proper support.

Commands for power saver mode: chpwrmgmt and lspwrmgmt

Scheduled Operation for Power Saver Mode

Page 64: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation64

Terminology

Additional capacity assigned to a virtual pool for the purpose of reserving uncapped cycles for the VSPP’s use. Must be less than Maximum Pool Capacity. Cannot be stolen by the HMC during partition activation. The units are processor units and for HMC users the granularity is 0.01 processor units.

Reserved Pool Capacity

A computed quantity – not user specified.This is the number of CPU cycles guaranteed to be available to the set of partitions in the virtual pool. It is equal to the sum of the entitled capacities of the partitions in the VSPP (pending processor units of the active and inactive partitions) plus the Reserved Pool Capacity for the VSPP. Must always be Equal to or smaller than Maximum Pool Capacity. The units and granularity are the same as Reserved Pool Capacity.

Entitled Pool Capacity

Maximum Pool Capacity Maximum CPU cycles that can be consumed by the partitions in a VSPP (whole number of proc units).

HMC V7R3.2.0 – Multiple Shared Processor Pools

Active Dedicated Processor

LP1

Dedicated Processor

LP2Physical Shared Processor Pool

VSPP Pool 0 (default pool) VSPP Pool 2VSPP Pool 1

One Physical Shared Processor Pool (PSPP) – Spans all VSPPs Comprised of all of licensed CPUs that are

– Not assigned to an active dedicated processor partition– Assigned to active dedicated processor partition that is capable of donation– Assigned to inactive dedicated processor LPs and system administrator has chosen to

make CPUs available for shared processor work when the LP is powered offVSPP Capacity

Page 65: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation65

Configure Shared Processor Pools (16-way 570)

My goal is to limit my license compliance at 3 processors for myfive IBM i partitions (even though they = 5 virtual processors

Page 66: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation66

Data Replication only available via GUI (no CLI)

Only hmcsuperadmin users allow to configure data replication

Enable Data Replication

HMC V7R3.3.0 – User Data Replication

Select Replication Source HMC Management =>

Manage Data Replication

Select Replication Data Types

Synchronize the replicated data

Save the configuration

Data which can be replicated– Customer information data

• Administrator, System, Account information– Group data

• All user-defined group definitions. – Modem configuration data

• Configure modem for remote support.– Outbound connectivity data – User Profile data– Kerberos, LDAP configuration data

Page 67: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation67

HMC V7.3.4 required - Active Memory Sharing

Minimum Requirements

Page 68: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation68

HMC V7R3.4.0 – Active Memory Sharing (AMS)PowerVM Virtualization Active Memory Sharinghttp://www.redbooks.ibm.com/redpapers/pdfs/redp4470.pdf

Page 69: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation69

HMC V7R3.5.0 – NPIV support

Page 70: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation70

HMC V7R3.5.0 – NPIV support - moreRedbook - IBM PowerVM Virtualization Managing and Monitoringhttp://www.redbooks.ibm.com/redbooks/pdfs/sg247590.pdf

Page 71: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation71

Service Processor - SPClosed OS Linux based, i/p convergenceProvides diagnostics, initialization, configuration, run-time error detection & correction

Power Hypervisor - PHYPBased on iSeries (SLIC) hypervisor, enhanced for converged i/p designProvides VLAN, virtual I/O, sub-processor partitioning,

Partition Firmware - PFW (OF/RTAS)Supports pSeries RPA interface

Rewritten to work with PHYPHardware Management Console - HMC / Serviceability

Provides converged platform configuration, management, and service user interface

System Power Control Network - SPCNInterfaces with bulk power for power monitoring and control

Bulk Power Controller (BPC) FirmwareControls each bulk power assembly (BPA) in CEC and towers. Currently unique to the 595, 590 and p575 systems

PHYP

PFW PFW

AIX Linux i5/OS

LIC/TIMI

Service Processor Firmware

SPCN

SP Hardware

Processor Subsystem

I/O

Bulk Power

HMCSFP

Firmware Components

BPC Firmware

POWER5/6/7 Firmware Components

Page 72: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation72

Why change firmware or upgrade to new level? New systems will ship with current level of firmware (at time of manufacture)

– HMC is a firmware component and must be at compatible level– Ongoing corrections and enhancements (routine maintenance)

Software and service support– For example POWER5 only remaining supported level is eFW240 = (SF240_xxx)

Upgrades – moving from POWER5 to POWER6 or POWER7– LPAR migration may require a minimum firmware level on POWER5– Mix of POWER5 and POWER6 management under a single HMC

• HMC compatibility (HMC V7R3 required for POWER6 / HMC V7R7 required for POWER7)• Minimum POWER5 firmware level SF240_299 required for V7R3 HMC compatibility, SF240_382 for V7R7

New hardware may require firmware enablement – Example, April 2009 introduced new high performance solid state disk

• Requires POWER6• Requires firmware level eFW340 at specific Service Pack (SP) level

How will you know if new changes are required?– Work with your Business Partner / IBM team– Identify feature codes / MTM for new hardware– Review PreReq / CoReq database to identify minimum Firmware, OS and HMC requirements:

• https://www-912.ibm.com/e_dir/eServerPrereq.nsf

Page 73: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation73

CoReq – PreReq details example – IBM i FC SSDhttps://www-912.ibm.com/e_dir/eServerPrereq.nsf

Page 74: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation74

Understanding how POWER firmware is delivered

OS Managed maintenance, including upgrades– Packaged for i5/OS in PTF format using MHxxxxx PTF

identifiers. HMC Managed, maintenance is delivered as ‘

Service Packs’. – i.e. 01SF240_299_201 where 299 = concurrent

Service pack and 201 is last disruptive level– POWER6 follows a similar format:

Unique code streams for POWER6 by platform MTM:– EL3xx – Power Systems 520 & 550– EM3xx – Power Systems 560 & 570– EH3xx – Power Systems 595– ES3xx – Power Systems 575– EA3xx – Power Blades

First code stream to support Power Systems POWER7 GA in Feb 2010

– 01AL710_099_043 (750 & 755)– 01AL720_082_066 (710 – 740) – 01AM720_084_064 (770 & 780)– 01AH720_082_064 & AB720_079_064 (795)

Updates and upgrade packages use the same packaging format:

– Format for Firmware Version/Release/maintenance level:

• PPNNSSS_FFF_DDD and will have a corresponding MHxxxxx marker PTF:

– PP = package identifier; 01 = managed system and 02 = power subsystem.

– NN = machine type model group; SF = POWER5 (5+) system firmware and BP = POWER5 bulk power.

– SSS = VRM indicator, i.e.., a code level (e.g., 240)

– FFF = fixpack number for current fixpack level

– DDD = fixpack number for the last disruptive fixpack level

Page 75: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation75

System Firmware Upgrade methods Two options for applying firmware maintenance

– OS managed – “In Band”• Not an option when HMC is required

– POWER5: 590, 595 or 570 with Dual FSP– POWER6 HMC is required on 560, 570, 575 and 595– POWER7 HMC is required on 770, 780 and 795

– HMC managed – Out of Band• This is the default for managing system firmware when HMC is attached

Page 76: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation76

Viewing existing firmware levelshttp://publib.boulder.ibm.com/infocenter/iseries/v6r1m0/index.jsp?topic=/rzahc/rzahcverifyingfirmwarerequirements.htm

Page 77: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation77

Firmware Updates and Upgrades via HMC

AIX

Firmware-PHYPPerm | Temp

PrivateNetwork

OR

Public Network

HMC

Out of band Update **** default with HMC

01AL720_082_066

Intranet or

Internet

Download directly from Service website and Install, download install images and burn to CD media or order media, then use media on HMC as installation source. Download to a FTP server accessible from the HMC LinuxVIOSIBM i

Page 78: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation78

Types of Fixpacks Updating firmware involves two steps:

– Apply the firmware (update what is in flash)

– Activate the firmware (cause the new firmware to be running in memory on the system)

Not all fixpacks can be activated concurrently

– Concurrent – Apply and activate with partitions running

– Deferred – Concurrent apply but contains fixes which affect IPL path – which are not activated until next IPL

• The portions of the fixpack which can be activated concurrently are activated as described above

– Disruptive – Platform is IPL required to activate • None of the fixpack contents are activated until next IPL

Page 79: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation79

Checking installed firmware from HMC V7.310 or later

Note – the Updates panel automatically shows firmware level for each managed server. Also, note that a single HMC can manage both POWER5 and POWER6

Page 80: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation80

HMC V7R3 Update example – using Advance Features

• Advance features provides several options.• Retrieve allows download & store on the HMC hard drive or on DVD for future use. •Install & Activate will update the server in a two-step process, store on HMC & update the server firmware• Remove & Activate - Switches from temp copy and activates perm copy from flash memory on the FSP• Accept – Make the Perm copy the same as the Temp copy• Remove Fix – deleted Temp copy and makes Perm & Temp the same on FSP• Disruptive Activate - Forces a FSP reboot – This might be used if the SP is concurrent but includes ‘deferred fixes’ that are needed right away.

Page 81: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation81

After retrieve – view firmware level on HMC hard drive

Page 82: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation82

Or - Select a specific level – Retrieve & Activate

NOTE: a copy of the firmware is ALWAYS written to the hard drive first.

Page 83: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation83

Down load and apply the “selected” service pack

Page 84: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation84

After retrieve and update – verify new SP level

Page 85: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation85

Apply newer SP if previous has deferred updates pending?

Yes, you can apply another concurrent SP even with deferred updates pending.

Or, what if you need to ‘remove’ the 95 SP from TEMP. NOTE: Permanent (Accepted level) is still at 75. This can also be done concurrently.

Page 86: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation86

Remove SP 095 – back to 075 – view to confirm

Page 87: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation87

Upgrade procedure is nearly identical

Page 88: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation88

Fix Central review http://www-933.ibm.com/support/fixcentral/main/

The current strategy that IBM has implemented is to redirect most maintenance activities from the web, relating to POWER6/7, directly to Fix Central

This approach uses a Wizard to help determine maintenance targets and compatibility considerations.

Page 89: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation89

Power Systems – Recommended Firmware http://www-912.ibm.com/s_dir/slkbase.nsf/ibmscdirect/E58D7BBF0EAC9A2786256EAD005F54D8

Wizard to help determine compatible

HMC & Firmware levels

Page 90: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation90

Maintained by the Support Center team

Page 91: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation91

Informational website

https://www.ibm.com/developerworks/wikis/display/WikiPtype/Homehttps://www.ibm.com/developerworks/wikis/display/WikiPtype/Home

Page 92: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation92

The EndThank You !

Page 93: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation93

For more informationhttp://publib.boulder.ibm.com/infocenter/systems/scope/hw/index.jsp

Page 94: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation94

New wiki for key links to the most current informationIBM i wikis https://www.ibm.com/developerworks/wikis/display/WikiPtype/IBM+i

Page 95: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation95

Support for HMC – on POWER Systems - References• Fix central – for download hmc, server firmware PTFs etc:

http://www-933.ibm.com/support/fixcentral• New HMC HOME page

http://www14.software.ibm.com/webapp/set2/sas/f/hmcl/home.html•HMC / Firmware Supported Combinations

http://www-933.ibm.com/support/fixcentral/firmware/supportedCombinations• HMC Version 7 Installation and Configuration Guide for the Hardware Management Console

http://publib.boulder.ibm.com/infocenter/systems/scope/hw/index.jsp?topic=/iphai/iphai_parent.htm• HMC Version 7 Cumulative PTF History and Readme

http://www14.software.ibm.com/webapp/set2/sas/f/hmcl/power6/install/v734.Readme.html Includes PTF-specific information, including verification information for package downloads and installation. Also includes general information on HMC Version 7 fixes, enhancements, known issues and education.

• Hardware Management Console V7 Handbookhttp://www.redbooks.ibm.com/redbooks/pdfs/sg247491.pdf

• HMC V7 R3.4.0 Command line specificationhttp://www14.software.ibm.com/webapp/set2/sas/f/hmcl/power6/related/hmc_man_7.3.4.pdf

• IBM service strategy and best practiceshttp://www14.software.ibm.com/webapp/set2/sas/f/best/home.html

• Various white papers on best practices, including HMC.• HMC function and hardware prerequisites for HMC Version 7

http://www14.software.ibm.com/webapp/set2/sas/f/hmcl/power6/related/hmcprereqs.pdfLists the supported functions, servers, and HMC hardware for each Code Level for HMC for IBM Systems with POWER6 processors.

• IBM System Planning Toolhttp://www-947.ibm.com/systems/support/tools/systemplanningtool/The IBM System Planning Tool (SPT) is the next generation of the IBM LPAR Validation Tool (LVT). It contains all of the function from the LVT and is integrated with the IBM Systems Workload Estimator (WLE). System plans generated by the SPT can be deployed on the system by the Hardware Management Console (HMC).

Page 96: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation96

Additional Reference Material

Server firmware Fixes - starting page

http://www-912.ibm.com/supporthome.nsf/document/34252843

Server firmware download

http://www-912.ibm.com/s_dir/slkbase.nsf/c32447c09fb9a1f186256a6c00504227/604992740f846a4986256fd3006029b5?OpenDocument

Download system firmware for IBM System p5, eServer p5, eServer pSeries, eServer

http://www14.software.ibm.com/webapp/set2/firmware/gjsn

Hardware Management Console Support for i5, p5 and OpenPower

http://www14.software.ibm.com/webapp/set2/sas/f/hmc/home.html

HMC Function and Hardware Prerequisites - summary table

http://techsupport.services.ibm.com/server/hmc/power5/tips/hmcprereqs.pdf

InfoCenter Topics on Server Firmware Management

http://publib.boulder.ibm.com/infocenter/eserver/v1r2s/en_US/info/ipha5/fixesserverfirmware.htm

Page 97: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation97

Information Centers, Redbooks and more

The POWER Systems Hardware Info Center

http://publib.boulder.ibm.com/infocenter/eserver/v1r2s/en_US/index.htm

HMC Best Practices –

https://www14.software.ibm.com/webapp/set2/sas/f/best/hmc_best_practices.pdf

iTC class room education –

http://www-03.ibm.com/servers/eserver/iseries/service/itc/educ.html

LPAR Redbook –http://www.redbooks.ibm.com/redbooks.nsf/RedpieceAbstracts/sg248000.html?Open

Page 98: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation98

Support Web Sites for HMC and Firmware

IBM iSeries™ Hardware Management Console Frequently Asked Questions – http://www-1.ibm.com/support/docview.wss?uid=nas148859a914db132a586256f42006003a7&rs=110

HMC - Support for UNIX servers and Midrange servers– http://www14.software.ibm.com/webapp/set2/sas/f/hmc/home.html

iSeries Recommended Fixes - Server Firmware: Update Policy Set to Operating System – http://www-

912.ibm.com/s_dir/slkbase.nsf/c32447c09fb9a1f186256a6c00504227/604992740f846a4986256fd3006029b5?OpenDocument

iSeries Recommended Fixes - Server Firmware: Update Policy Set to HMC– http://www-912.ibm.com/s_dir/slkbase.nsf/ibmscdirect/E58D7BBF0EAC9A2786256EAD005F54D8

Page 99: HMC+and+Firmware+AIX+VUG Feb+2011

IBM ATS - Skills Transfer – HMC and Power Systems firmware

© 2011 IBM Corporation99

Trademarks and Disclaimers

© IBM Corporation 1994-2009. All rights reserved.References in this document to IBM products or services do not imply that IBM intends to make them available in every country.The following terms are trademarks or registered trademarks of International Business Machines Corporation in the United States, other countries, or both:

Lotus, Freelance Graphics, and Word Pro are registered trademarks of Lotus Development Corporation and/or IBM Corporation.Domino is a trademark of Lotus Development Corporation and/or IBM Corporation.C-bus is a trademark of Corollary, Inc. in the United States, other countries, or both. Java and all Java-based trademarks are trademarks of Sun Microsystems, Inc. in the United States, other countries, or both. Microsoft, Windows, Windows NT, and the Windows logo are trademarks of Microsoft Corporation in the United States, other countries, or both. ActionMedia, LANDesk, MMX, Pentium and ProShare are trademarks of Intel Corporation in the United States, other countries, or both. UNIX is a registered trademark of The Open Group in the United States and other countries.SET and the SET Logo are trademarks owned by SET Secure Electronic Transaction LLC. Other company, product and service names may be trademarks or service marks of others.Information is provided "AS IS" without warranty of any kind.All customer examples described are presented as illustrations of how those customers have used IBM products and the results they may have achieved. Actual environmental costs and performance characteristics may vary by customer.Information in this presentation concerning non-IBM products was obtained from a supplier of these products, published announcement material, or other publicly available sources and does not constitute an endorsement of such products by IBM. Sources for non-IBM list prices and performance numbers are taken from publicly available information, including vendor announcements and vendor worldwide homepages. IBM has not tested these products and cannot confirm the accuracy of performance, capability, or any other claims related to non-IBM products. Questions on the capability of non-IBM products should be addressed to the supplier of those products.All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only. Contact your local IBM office or IBM authorized reseller for the full text of the specific Statement of Direction.Some information in this presentation addresses anticipated future capabilities. Such information is not intended as a definitive statement of a commitment to specific levels of performance, function or delivery schedules with respect to any future products. Such commitments are only made in IBM product announcements. The information is presented here to communicate IBM's current investment and development activities as a good faith effort to help with our customers' future planning.

Performance is based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput or performance that any user will experience will vary depending upon considerations such as the amount of multiprogramming in the user's job stream, the I/O configuration, the storage configuration, and the workload processed. Therefore, no assurance can be given that an individual user will achieve throughput or performance improvements equivalent to the ratios stated here.

Photographs shown are of engineering prototypes. Changes may be incorporated in production models.

xSeriesRationalPOWER5iSeriese(logo)serverDB2

POWER4

POWER

OS/400

Notes

MQSeries

Lotus

WebSphereQuickplaceIBM(logo)e(logo)businessAS/400e

TotalStoragepSeriesIBM Virtualization Enginee business(logo)AS/400

i5/OSTivoliPOWER6IBMDominoAIX 5L (logo)

400ThinkPadPOWER HypervisorHipersocketsDataPropagatorAIX 5L

zSeriesS/390Power EverywhereEnterprise Storage ServerDB2 OLAP ServerAIX/L

z/OSRS/6000Power ArchitectureeServerDB2 UniversalAIX