9
HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15-308 PLAYING SURFACE RECONSTRUCTION AUBURN UNIVERSITY Addendum No.2 Page 1 of 2 21 July 2017 ADDENDUM NO. 2 Specifications of the Contract Documents Auburs University - Hitchcock Field at Plainsman Park Playing Surface Reconstruction This Addendum is hereby made a part of the Contract Documents to the same extent as though it was originally included therein. Receipt for this Addendum must be acknowledged by the Bidder by statement of receipt indicated on the Proposal Form. . PRE=BID CONFERENCE Those Present: Nick Blair, AU Facilities Jeff Steele, AU Athletics Eric Kleypas, AU Athletics Zach Willard, AU Athletics Wendy Peacock, AU Facilities Ed Norton, HNP Brad Blastick, Sprinturf Bill Pronevitch, Precision Turf LLC Russ Russell, Warner’s Athletic Construction Lou Warner, Warner’s Athletic Construction Rick Helms, SiteOne Landscape Supply Taylor McCarty, GreenFields USA Bob Calta, Sports Turf Company, Inc. Todd Wiggins, Sports Turf Company, Inc. The following items were discussed: 1. Project safety is a major concern for the University. 2. Project will be totally complete by September 30th, 2017 with an anticipated construction duration of forty-five (45) days. (See amended Project Summary attached to this Addendum) 3. Prequalification is required. 4. Attachment ‘B’ Unit Prices is not required. 5. Attachment C-3C - Stated Allowances and Unit Prices is not required. 6. Attachment C- 3A- LIST OF SUBCONTRACTORS AND MAJOR SUPPLIERS is to submitted with the Bid (Attached to this Addendum). 7. The project manual will be modified to clarify that all nights and weekends will be available to work for the contractor other than Football home games. (See amended Project Summary attached to this Addendum)

HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15 … Blastick, Sprinturf Bill Pronevitch, ... PROJECT MANUAL AU FORM C-3B: ... Maintenance. B. Alternate No. 2:

  • Upload
    tranthu

  • View
    216

  • Download
    2

Embed Size (px)

Citation preview

Page 1: HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15 … Blastick, Sprinturf Bill Pronevitch, ... PROJECT MANUAL AU FORM C-3B: ... Maintenance. B. Alternate No. 2:

HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15-308 PLAYING SURFACE RECONSTRUCTION AUBURN UNIVERSITY

Addendum No.2 Page 1 of 2

21 July 2017 ADDENDUM NO. 2 Specifications of the Contract Documents Auburs University - Hitchcock Field at Plainsman Park Playing Surface Reconstruction This Addendum is hereby made a part of the Contract Documents to the same extent as though it was originally included therein. Receipt for this Addendum must be acknowledged by the Bidder by statement of receipt indicated on the Proposal Form. . PRE=BID CONFERENCE Those Present: Nick Blair, AU Facilities Jeff Steele, AU Athletics Eric Kleypas, AU Athletics Zach Willard, AU Athletics Wendy Peacock, AU Facilities Ed Norton, HNP Brad Blastick, Sprinturf Bill Pronevitch, Precision Turf LLC Russ Russell, Warner’s Athletic Construction Lou Warner, Warner’s Athletic Construction Rick Helms, SiteOne Landscape Supply Taylor McCarty, GreenFields USA Bob Calta, Sports Turf Company, Inc. Todd Wiggins, Sports Turf Company, Inc. The following items were discussed: 1. Project safety is a major concern for the University. 2. Project will be totally complete by September 30th, 2017 with an anticipated construction

duration of forty-five (45) days. (See amended Project Summary attached to this Addendum)

3. Prequalification is required. 4. Attachment ‘B’ Unit Prices is not required. 5. Attachment C-3C - Stated Allowances and Unit Prices is not required. 6. Attachment C- 3A- LIST OF SUBCONTRACTORS AND MAJOR SUPPLIERS is to

submitted with the Bid (Attached to this Addendum). 7. The project manual will be modified to clarify that all nights and weekends will be

available to work for the contractor other than Football home games. (See amended Project Summary attached to this Addendum)

Page 2: HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15 … Blastick, Sprinturf Bill Pronevitch, ... PROJECT MANUAL AU FORM C-3B: ... Maintenance. B. Alternate No. 2:

HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15-308 PLAYING SURFACE RECONSTRUCTION AUBURN UNIVERSITY

Addendum No.2 Page 2 of 2

8. Addendum 2 will also include an alternate to extend the artificial surface in the warning track through fair territory in the outfield. (This Addendum)

9. The Scope of the Project was reviewed. PROJECT MANUAL AU FORM C-3B: Add Form attached to this Addendum SECTION 00 20 00 PROJECT SUMMARY: Replace entire Section with Section attached to this Addendum SECTION 01 23 00- ALTERNATES: Replace entire Section with Section attached to this Addendum. SECTION 32 18 23.13 - INFIELD SOIL MIX AND WARNING TRACK; PART 2 PRODUCTS: Change 2.2 and 2.3 to read as follows: 2.2 MOUND CLAY Blended and screened red mound packing clay. ‘TURFACE MOUND CLAY ELITE or

approved substitute. 2.3 CALCINED CLAY "TURFACE PRO LEAGUE ELITE" kiln fired, mechanical sized clay blend, as

manufactured by AIMCOR, One Parkway North, Suite 400 Deerfield, Illinois 60015 or approved substitute.

SECTION 32 84 00 - IRRIGATION SYSTEM; PART 3 EXECUTION; Delete 3.16 SPARE PARTS DRAWINGS SHEET C1.0 LAYOUT AND MATERIALS PLAN - NATURAL GRASS: Replace sheet with Drawing attached to this Addendum. SHEET C2.0 GRADING PLAN - NATURAL GRASS: Replace sheet with Drawing attached to this Addendum. SHEET C4.0 IRRIGATION DEMOLITION PLAN - NATURAL GRASS: Replace sheet with Drawing attached to this Addendum. Attach this Addendum to the front of the Specifications. All other conditions and requirements remain unchanged by this Addendum.

End of Addendum

Page 3: HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15 … Blastick, Sprinturf Bill Pronevitch, ... PROJECT MANUAL AU FORM C-3B: ... Maintenance. B. Alternate No. 2:

AUFormC-3B September2016

Page1of1

LISTOFSUBCONTRACTORSANDMAJORSUPPLIERS

AttachmenttoABCFormC-3ProposalForm

The apparent low bidder shall submit to the Owner and the Architect a complete list of allsubcontractors with their State of Alabama (Sub) Contractor’s license numbers and all materialssuppliersforsubcontractsand/ormaterialpurchasesinexcessof$50,000.00.321812SYNTHETICTURFBASE&DRAINAGE:

SubcontractorName/Phone:

LicenseNumber:

ManufacturerName/Phone:

321814SYNTHETICTURF:

SubcontractorName/Phone:

LicenseNumber:

ManufacturerName/Phone:

321823.13INFIELDSOILMIX:

SubcontractorName/Phone:

LicenseNumber:

ManufacturerName/Phone:

321823.25 FIELDPREPARATION

SubcontractorName/Phone:

LicenseNumber:

ManufacturerName/Phone:

321823.26 ROOTZONE&DRAINAGELAYERMEDIA:

SubcontractorName/Phone:

LicenseNumber:

ManufacturerName/Phone:

321823.27ATHLETICSODDING:

SubcontractorName/Phone:

LicenseNumber:

ManufacturerName/Phone:

328400IRRIGATIONSYSTEM:

SubcontractorName/Phone:

LicenseNumber:

ManufacturerName/Phone:

Note: Bidder must name one and only one entity for each of the above trades. Where thesubcontractorandsupplierormanufacturersarerequired,listbothinthespacesprovided.

Page 4: HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15 … Blastick, Sprinturf Bill Pronevitch, ... PROJECT MANUAL AU FORM C-3B: ... Maintenance. B. Alternate No. 2:

PlainsmanPark-HitchcockFieldRenovation AUProjectNumber:15-308 ADDENDUM#2

002000-1 Summary

SECTION002000

PROJECTSUMMARY

PART1GENERAL

1.01 PROJECT

A. AUProjectName: PlainsmanPark-HitchcockFieldRenovation

B. AUProjectNumber15-308

C. Owner: AuburnUniversity

c/oFacilitiesManagement,

WestSamfordAvenue,

AuburnUniversity,AL36849-5514

D. Architect:HolcombNortonPartners,Inc.

E. Work:Theprojectconsistoftheconstructionof…..renovationofHitchcockField;playingsurface

andfoulterritory

F. TimeofCompletion:TheanticipatedNoticeToProceed(NTP)isAugust15th,2017.The

completiondateforallworkisSeptember30th,2017.IfAlternate#1isnottakenthecompletion

dateisSeptember22nd,2017

G. LiquidatedDamages:InaccordancewithABCFormC-8,GeneralConditions,andArticle49.C.

H. RainDayClass:ThisprojectwillbeRainDayClass:II(seeSupplementalConditionsoftheProject

I.E.6.b)

I. Builder’sRiskInsurance:ProvidedbyAuburnUniversityunlessotherwisestated.

J. StateofAlabamaBuildingCommissionChapter170x08:CollectionofUserFees:

EachBidder(_)is,(X)isnotrequiredtoincludethecostforthePermitFeesrequiredbytheState

ofAlabamaBuildingCommission.ContacttheAlabamaBuildingCommissionorvisittheirwebsite

forfeecalculation.

1.02CONTRACTDESCRIPTION

A. ContractType:AsinglePrimecontractbasedonastipulatedPriceasdescribedinDocumentABC

FormC-5ConstructionContract(section000500ofTableofContents).

1.03 OWNEROCCUPANCY

A. OwnerintendstocontinuetoOccupyadjacentportionsoftheexistingbuildingduringtheentire

constructionperiod.

B. OwnerintendstooccupytheProjectuponSubstantialCompletion.

C. CooperatewithOwnertominimizeconflictandtofacilitateOwner’soperations.

Page 5: HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15 … Blastick, Sprinturf Bill Pronevitch, ... PROJECT MANUAL AU FORM C-3B: ... Maintenance. B. Alternate No. 2:

PlainsmanPark-HitchcockFieldRenovation AUProjectNumber:15-308 ADDENDUM#2

002000-2 Summary

D. ScheduletheWorktoaccommodateOwneroccupancy.

1.04 CONTRACTORUSEOFSITEANDPREMISES

A. ConstructionOperations:LimitedtoareasnotedonDrawings.

B. ProvideAccesstoandfromsiteasrequiredbyLawandbyOwner:

1. EmergencyBuildingExitsDuringConstruction:Keepallexitsrequiredbycodeopenduring

constructionperiod;providedtemporaryexitsignsifexitroutesaretemporarilyaltered.

2. Donotobstructroadways,sidewalks,orotherpublicwayswithoutpermit.

C. Existingbuildingmaynotbeusedforstorage.

D. Timerestrictions:Allnightsandweekendswillbeavailableforthecontractortoworkotherthan

theSaturdayoffootballhomegames(9-2-17,9-16-17and9-30-17).

E. UtilityOutagesandShutdown:AsoutlinedinOwner’sproceduresfortheseactivities.

1. Limitdisruptionofutilityservicestohoursthebuildingisunoccupied.

2. Donotdisruptorshutdownlifesafetysystems,includingbutnotlimitedtofiresprinklers

andfirealarmsystem,without7days’noticetoOwnerandauthoritieshavingjurisdiction.

3. Preventaccidentaldisruptionofutilityservicestootherfacilities.PART2PRODUCTS-NOTUSEDPART3EXECUTION-NOTUSED

ENDOFSECTION

Page 6: HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15 … Blastick, Sprinturf Bill Pronevitch, ... PROJECT MANUAL AU FORM C-3B: ... Maintenance. B. Alternate No. 2:

HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15-308 PLAYING SURFACE RECONSTRUCTION ADDENDUM #2 AUBURN UNIVERSITY

Alternates 01 23 00 - 1

SECTION 01 23 00 - ALTERNATES PART 1 - GENERAL 1.1 Drawings and general provisions of the Contract, including General and

Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 DEFINITION:

A. Alternates are defined as products, materials, equipment, systems, methods, units of work or major elements of construction that, at the Owner's option and under the terms established by the Instructions to Bidders, be selected for the work in lieu of requirements in the Technical Specifications or may be added to the Base Contract Work.

B. Alternates may or may not change the scope and general character of the

work. C. The requirements of this Section may be related to, but not to be confused

with, requirements of the Contract Documents related to "allowances", " change orders", "substitutions", and similar items.

PART 2 - SCHEDULE OF ALTERNATES 2.1 GENERAL: The description of each alternate listed below is recognized to be

abbreviated, but implies that each change shall be complete for the scope of work affected. Refer to applicable Specification Sections and Drawings for specific requirements of the work of each alternate.

2.2 ALTERNATES: A. Alternate No. 1: Install thick cut sod provided by the Owner as shown on the

Drawings and described in Section 32 18 23.27 Athletic Field Sodding and Maintenance.

B. Alternate No. 2: In lieu of installing a stone warning track in the outfield, install

synthetic turf as shown on the Drawings.

END OF SECTION

Page 7: HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15 … Blastick, Sprinturf Bill Pronevitch, ... PROJECT MANUAL AU FORM C-3B: ... Maintenance. B. Alternate No. 2:
Page 8: HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15 … Blastick, Sprinturf Bill Pronevitch, ... PROJECT MANUAL AU FORM C-3B: ... Maintenance. B. Alternate No. 2:
Page 9: HITCHCOCK FIELD AT PLAINSMAN PARK AU # 15 … Blastick, Sprinturf Bill Pronevitch, ... PROJECT MANUAL AU FORM C-3B: ... Maintenance. B. Alternate No. 2: