An Act For the development and control of
atomic energy. The Atomic Energy Act of 1946(McMahon Act) ruled that nuclear weapondevelopment and nuclear power managementwould be under civilian, rather than militarycontrol, and it established the United StatesAtomic Energy Commission for this purpose.
In 1954 - The Atomic Energy Act of 1954amended the Atomic Energy Act of 1946,established and defined the Atomic EnergyCommission function.
The ASME Committee on Nuclear QualityAssurance was constituted on October 3, 1975,and began operating under the ASME Proceduresfor Nuclear Projects.
11/27/2011Axion Technical Services. All
Rights Reserved
5/20/2018 History of ASME NQA-1
3/13
969: AEC regulatory function proposed for
public comment 18 quality assurance criteriaas Appendix B to 10 CFR Part 50 for licensingnuclear power plants, and
Representatives of the AEC and the nuclearindustry met to begin developing N45.2
standards on quality assurance programrequirements and guidance for nuclear powerplants
5/20/2018 History of ASME NQA-1
4/13
In May 1969 the American NationalStandards Committee N45
established an Ad Hoc Committeeon Quality AssuranceRequirements(N45.2-3). The purpose of this committee was to
prepare a standard for general industryuse that would among other thingssatisfy the intent and amplify therequirements of the AEC qualityassurance regulations and a basis forthe development of detailed qualityassurance practices and procedures.
The standard was developed under
sponsorship of The AmericanSociety of Mechanical Engineers(ASME) as an effort by the AmericanNational Standards Committee N45originally issued 1971 andsubsequently revised and issued in
1977.
5/20/2018 History of ASME NQA-1
5/13
To develop, manage, and/or coordinate qualityassurance and quality assurance related codes andstandards applicable to siting, design,construction, operation, and decommissioning ofnuclear power plants and nuclear fuel cyclefacilities.
Mission Statement: The Vision of the NQACommittee is that: "NQA-1 to be globallyrecognized as the world class quality standardthat organizations want to adopt because using it
gives them a competitive advantage in theachievement of quality results."
5/20/2018 History of ASME NQA-1
6/13
This Committee preparedANSI/ASME NQA-1, QualityAssurance Programrequirements for Nuclear
Power Plants, and ANSI/ASMENQA-2, Quality Assurancerequirements for NuclearPower Plants, which were first
issued in 1979 and 1983,respectively, as AmericanNational Standards
5/20/2018 History of ASME NQA-1
7/13
EDITIONS: 1979, 1983, 1986, 1989, 1994,
1997, 2000, 2004, and 2008.
From its initial publication in 1979, theStandard has retained the 18-criteriastructure of 10 CFR 50 Appendix B in a
portion of the document.
5/20/2018 History of ASME NQA-1
8/13
Code Power Plants committed to NQA-1 intheir Licensing Documents. Others remainedwith ANSI N45.2 and daughter standards.
NRC in Regulatory Guide 1.28 Rev 3established NQA-1c 1989 ED 1992 Add as asatisfactory means to implement App B, andRev 4 established NQA-1a 2008 ED 2009 Add
DOE in O 414.1 D as a satisfactory means toimplement NQA-1 2008Ed 2009 Addenda.
5/20/2018 History of ASME NQA-1
9/13
Executive Committee Chairman of each Subcommittee & NRC Representative
Main Committee 36 voting Chair, Vice-Chair, Secretary
Affirmed members at large per Balance of Interest
Subcommittees Applications Assessment & Verification
Engineering & Procurement Processes Interface & Administration Program Management Processes
Software Quality Assurance
Waste Management
5/20/2018 History of ASME NQA-1
10/13
Manufacturers Manufacturers of Materials
Owners
Constructors Designers
Regulatory Bodies
Inspection Agencies
Laboratories General
5/20/2018 History of ASME NQA-1
11/13
Develop a Part II document that appliesrisk informed requirements for NONSafety related SSCs that are significantcontributors to plant safety.
Software (Real-time & non real-time);Developed vs Dedicated
Suspect, counterfeit or fraudulent items
Use of Commercial Calibration ServicesILAC/MRA
5/20/2018 History of ASME NQA-1
12/13
NQA-1b 2011, not endorsed by the NRC or
DOE. Planned by 2014.
The Standard after the 2012 Addenda will beissued Bi-Annually starting in 2013 withoutAddenda, only interpretations.